International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:1092 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 892 ]  
 
Liaison statement to Working Party 5A - Draft new Report ITU-R M.[IMT.MTC] - The use of the terrestrial component of narrowband and broadband International Mobile Telecommunications (IMT) for Machine-Type Communications     WP 5D     2018-10-19
[ 891 ]  
 
Liaison statement to Working Party 5A - Working document toward a preliminary draft revision of Report ITU-R M.2291-1 - The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications     WP 5D     2018-10-19
[ 890 ]  
 
Liaison statement on operation of short-range radiocommunication public access system supporting hearing aid systems     European Telecommunications Standards Institute     2018-10-17
[ 889 ]  
 
Liaison statement to Working Parties 4C, 5A and 7C - New Report ITU-R SA.[400 MHZ-LIMITS]     WP 7B     2018-10-10
[ 888 ]  
 
Liaison statement on ITU inter-Sector coordination: ITU-R Working Parties 5A, 5B and 5C versus ITU-T Questions     ITU-T SG 5     2018-10-10
[ 887 ]  
 
Liaison statement reply to Working Party 5A on the revision of Recommendation ITU-R M.2084-0     European Telecommunications Standards Institute     2018-10-08
[ 886 ]  
 
Liaison statement to Working Parties 5A, 5C, 5D and 6A - Report ITU-R SA.[460 MHZ METSAT-EESS]     WP 7B     2018-10-02
[ 885 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C and 6A - Characteristics and protection criteria for aeronautical mobile (route) systems operating in the frequency band 117.975-137 MHz     WP 7B   AI1.7   2018-10-02
[ 884 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7     WP 7B   AI1.7   2018-10-01
[ 883 ]  
 
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 4B and 5A) On contribution concerning Bird-to-Bird packet communication     WP 7B     2018-10-01
[ 882 ]  
 
Liaison statement on work being carried out under study in ITU-T Question 3/5     ITU-T SG 5     2018-10-01
[ 881 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7B) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 7C     2018-09-28
[ 880 ]  
 
Liaison statement to ITU-R Working Party 5A regarding AWG activities related to Intelligent Transport Systems     Asia-Pacific Telecommunity     2018-09-27
[ 879 ]  
 
Reply liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[100GHz.RSTT.COEXIST]     WP 7C     2018-09-24
[ 878 ]  
 
Liaison statement on establishment of new ITU-T Focus Group on vehicular multimedia (FG-VM) and its first meeting [to TSAG, all ITU-T SGs; External Organizations]     ITU-T SG16     2018-08-31
[ 877 ]  
 
Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and other antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     ATDI   Q242/5   2018-08-31
[ 876 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 5A, 5C and 7C) - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz     WP 4A     2018-07-24
[ 875 ]  
 
Liaison statement to ITU-R Working Parties 4B, 5A, 5C, 5D, 7C and 7D regarding the work status of WRC-19 agenda item 9.1, issue 9.1.9     WP 4A   AI9.1   2018-07-24
[ 874 ]  
 
Reply liaison statement to Working Party 5A - WRC-19 agenda item 1.16 (RLAN)     WP 4A     2018-07-23
[ 873 ]  
 
Liaison statement on E.td-dr "Terms and definitions for disaster relief systems, network resilience and recovery"     ITU-T SG 2     2018-07-18
[ 872 ]  
 
Liaison statement on E.sup.fdr "Framework of disaster management for disaster relief systems"     ITU-T SG2     2018-07-18
[ 871 ]  
 
Liaison statement to Working Parties 5A and 5D - Key elements for integration of satellite systems in to Next Generation Access Technologies (NGAT)     WP 4B     2018-07-17
[ 870 ]  
 
Liaison statement on new terms and definitions in ITU-T Study Group 20 work     SCV     2018-07-09
[ 869 ]  
(Rev.1) 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-07-06
[ 868 ]  
 
Liaison statement to Working Parties 5A and 6A - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]     WP 3L     2018-07-02
[ 867 ]  
 
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 3L     2018-07-02
[ 866 ]  
 
Liaison statement to Working Party 5A - Studies related to WRC-19 agenda item 1.1     WPs 3K and 3M     2018-07-02
[ 865 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2018-07-02
[ 864 ]  
 
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ]     WP 1A   Q210/1   2018-06-29
[ 863 ]  
 
Reply liaison statement to Working Party 5C (copy for information to Working Party 5A) - WRC-19 agenda item 1.15     WP 1A   AI1.15   2018-06-29
[ 862 ]  
 
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A   Q210/1   2018-06-29
[ 861 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems     WP 1A     2018-06-29
[ 860 ]  
 
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification     WP 1A     2018-06-29
[ 859 ]  
 
Liaison statement to ETSI ERM TG 17 (copy to ITU-R Working Party 5A) - Operation of short-range radiocommunication public access system supporting hearing aid systems     WP 1B     2018-06-28
[ 858 ]  
 
Liaison statement to ITU-D Study Group 2 and ITU-R Working Party 5A - 'Bird-to-Bird' packet communication     WP 1B     2018-06-28
[ 857 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations     WP 1A     2018-06-21
[ 856 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems     WP 1A     2018-06-21
[ 855 ]  
 
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems     WP 5D     2018-06-21
[ 854 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 5A and 7C for information) - Foreign object debris detection system operating in the band 92-100 GHz     WP 5B     2018-06-19
[ 853 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 5A and 7D for information) - Potential in-band interference from foreign object debris detection systems in the radiolocation service into EESS (active) systems in the 94.0-94.1 GHz frequency band     WP 5B     2018-06-19
[ 852 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C and 7C) - Aeronautical mobile service (AMS) systems technical characteristics in 21.2-22.2 GHz     WP 5B     2018-06-19
[ 851 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies     WP 5C   AI1.14   2018-06-05
[ 850 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)     WP 5C   AI1.14   2018-06-05
[ 849 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14     WP 5C   AI1.14   2018-06-05
[ 848 ]  
(Rev.1) 
Liaison statement on work which is under study in ITU-T Q3/5     ITU-T SG 5     2018-06-04
[ 847 ]  
(Rev.1) 
[Preliminary] draft revision of Recommendation ITU-R M.2084-0 - Radio interface standards of vehicle-to-vehicle and vehicle-to-infrastructure communications for Intelligent Transport System applications     Alliance for Telecommunications Industry Solutions   Q205/5   2018-05-16
[ 846 ]  
 
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations     WP 5C     2018-05-31
[ 845 ]  
 
Reply liaison statement to ITU-R Working Party 1A on preparations for WRC-19 agenda item 1.15 and the working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING] (copy to Working Party 5A for information) - Input as related to WRC-19 agenda item 1.15 - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency ...     WP 5C   AI1.15   2018-05-31
[ 844 ]  
+Ann.1-35 
Report on the twentieth meeting of Working Party 5A (Geneva, 21-31 May 2018)     Chairman, WP 5A     2018-05-30
[ 843 ]  
 
Final list of participants - Working Party 5A (Geneva, 21-31 May 2018)     Director, BR     2018-05-30
Results:1092 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-11