International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 87 ]  
 
Note to Study Group 5 (copy for information to WPs 5A, 5B and 5C) - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     WP 5D     2012-10-16
[ 86 ]  
 
Liaison statement to Working Party 5B - (copy to WPs 5A and 5C for information) - WRC-15 Agenda item 1.15     WP 5D     2012-10-15
[ 85 ]  
 
Reply liaison statement to Working Party 5C - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz     WP 7C     2012-10-15
[ 84 ]  
 
Progress report of Joint Correspondence Group Activity     Chairman, JCG 5A/5C     2012-10-15
[ 83 ]  
 
US comments on cross-border coordination Handbook (Document 5A-5C/4)     United States of America     2012-10-06
[ 82 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C - Sharing the 7-8 GHz band between proposed EESS (Earth-to-space) under WRC-15 Agenda item 1.11 and existing terrestrial services     WP 7B     2012-10-05
[ 81 ]  
 
Liaison statement to Working Party 5C - Protection criteria and modelling for WRC-15 Agenda item 1.13     WP 7B     2012-10-05
[ 80 ]  
 
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8     WP 4A     2012-10-05
[ 79 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6     WP 4A     2012-10-05
[ 78 ]  
 
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     SG 4     2012-10-04
[ 77 ]  
 
Liaison statement to Working Party 5C - Fixed service characteristics and criteria in relation with WRC-15 Agenda item 1.9.1     WP 4A     2012-10-03
[ 76 ]  
 
Progress of the studies in response to ITU-R Resolutions     Chairman, SG 5     2012-09-24
[ 75 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1     WP 4A     2012-09-24
[ 74 ]  
 
Liaison statement to Working Parties 5A, 5C and 5D - Working document towards a preliminary draft new Report ITU-R M.[RDSS & MSS COORD]     WP 4C     2012-09-19
[ 73 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 Agenda item 1.10     WP 4C     2012-09-18
[ 72 ]  
 
Liaison statement to Working Party 5C - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda items 1.9.2 and 1.10     WP 4C     2012-09-17
[ 71 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     WP 4C     2012-09-14
[ 70 ]  
 
Proposal on the arrangement of ITU-R Recommendations of the "M"-series     Russian Federation     2012-08-29
[ 69 ]  
 
Draft revision of Recommendation ITU-R F.749-3 - Radio-frequency arrangements for systems of the fixed service operating in sub-bands in the 36-40.5 GHz band     Iran (Islamic Republic of)     2012-08-27
[ 68 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Party 4B and Working Party 5C     WP 5D     2012-07-23
[ 67 ]  
 
Results of the 19th RAG meeting     Chairman, SG 5     2012-07-03
[ 66 ]  
 
Liaison statement to Working Parties 6A and 5C - Future revision of Recommendation ITU-R P.842     WP 3L     2012-07-02
[ 65 ]  
(Rev.1) 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies     WP 3M     2012-06-29
[ 64 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)     WPs 1A and 1B     2012-06-25
[ 63 ]  
 
Liaison statement to Working Parties 5A, 5C and 5D - WRC-15 Agenda item 9.1, issue 9.1.6     WP 1B     2012-06-22
[ 62 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-06-22
[ 61 ]  
 
Liaison statement to Working Party 5C - Review of Recommendation ITU-R SF.674-2     WP 4A     2012-06-19
[ 60 ]  
 
Liaison statement to Working Party 5C - Comments on PDNR ITU-R [SF].[STATMETH]     WP 4A     2012-06-19
[ 59 ]  
 
Liaison statement to Working Party 5C - WRC-15 Agenda items 1.5 and 1.8     WP 4A     2012-06-19
[ 58 ]  
 
Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services     WP 1A     2012-06-19
[ 57 ]  
 
Liaison statement to ITU-R WPs 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (copy to ITU-R WP 3L and to ITU-T SGs 5, 9 and 15 for information and/or action if any) - Developments on coexistence of wired telecommunication (including PLT) and radiocommunication systems     WP 1A     2012-06-19
[ 56 ]  
 
Liaison statement to Working Parties 5C and 3L - Radio noise in the HF frequency band     WP 1C     2012-06-15
[ 55 ]  
 
Liaison statement to ITU-R WPs 3K, 3M, 4A, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and the International Maritime Organization (IMO) and International Association of Marine AIDS to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC-15) Agenda item 1.15     WP 5B     2012-06-06
[ 54 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 5C for information) - WRC-15 Agenda item 9.1.1     WP 5A     2012-06-05
[ 53 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 5C for information) - WRC-15 Agenda item 1.9.2     WP 5A     2012-06-05
[ 52 ]  
 
Liaison statement to Working Parties 5B and 5C regarding studies related to WRC-15 Agenda item 1.4     WP 5A     2012-06-05
[ 51 ]  
 
Liaison statement to Working Party 4C (copied for information to Working Parties 1A and 5C) - WRC-15 Agenda item 1.10     WP 5A     2012-06-05
[ 50 ]  
 
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1     WP 5A     2012-06-05
[ 49 ]  
 
Liaison statement to ITU-R Working Party 5C - WRC-15 Agenda item 1.5     WP 5B     2012-06-04
[ 48 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to WPs 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-06-01
[ 47 ]  
+Ann.1-16 
Report of the meeting of Working Party 5C (Geneva, 22 - 30 May 2012)     Chairman, WP 5C     2012-05-29
[ 46 ]  
 
Final List of Partcipants - Geneva, 22-30 May 2012     Director,BR     2012-05-29
[ 45 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 44 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 43 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C and 7B (copy to Working Parties 3M, 4B and 5B for information) - WRC-15 Agenda item 1.9.2     WP 4C     2012-05-28
[ 42 ]  
 
Liaison statement to Working Parties 5A, 5C and 5D - Preliminary draft new Report ITU-R M.[MSS-RDSS-SHARE]     WP 4C     2012-05-25
[ 41 ]  
 
Liaison statement to Working Party 5C - WRC-15 Agenda item 9.1.1     WP 4C     2012-05-25
[ 40 ]  
 
Liaison statement to Working Party 5B - (Copy to WP 5C and WP 5D for information) - WRC-15 Agenda item 1.15     WP 5A     2012-05-25
[ 39 ]  
 
List of documents issued     BR Study Groups Department     2012-05-21
[ 38 ]  
 
Working Party 5C Work plan - Studies on availability of frequency bands and/or tuning ranges for worldwide and/or regional harmonisation and conditions for their use by terrestrial electronic news gathering systems     Australia     2012-05-15
Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06