International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5C Recently posted -  Search Meeting Documents
   
ITU-R WP5C Meeting Documents
  Max # of documents displayed/page:
Results: 17 total items.
Number  Date Source Title
  Number  Posted Size  
 
[ 437 ]  2015-10-06 ITU-D SG 1   Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 5C on new Report ITU-R F.[FS.IMT/BB]    
  [ 437 ]  - English -  Word 2015-10-06 [11:29]  54'881  bytes  
 
[ 428 ]  2015-07-16 Chairman, WP 5C   Report on the fifteenth meeting of Working Party 5C (Bucharest, Romania, 6 - 15 July 2015)    
  [ 428 ] Annex 09 - English -  Word 2015-09-14 [16:58]  42'466  bytes List of output (TEMP) documents - (Documents 5C/TEMP/196 - 5C/TEMP/224)  
  [ 428 ]  - English -  Word 2015-09-14 [10:56]  70'139  bytes Report on the fifteenth meeting of Working Party 5C (Bucharest, Romania, 6 - 15 July 2015)  
  [ 428 ] Annex 08 - English -  Word 2015-08-26 [15:51]  60'088  bytes Liaison statement to ITU-T Study Groups 12, 13 and 15 - Activities on behalf of Question ITU-R 255/5 - Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems  
  [ 428 ] Annex 05 - English -  Word 2015-08-26 [15:49]  63'620  bytes Working document towards preliminary draft new Recommendation ITU-R F.[PERFORM] - Error performance and availability objectives and requirements for real point-to-point packet-based radio links  
  [ 428 ] Annex 03 - English -  Word 2015-08-26 [15:44]  130'046  bytes Framework for a working document toward a preliminary draft new Report on the use of high altitude platform stations for broadband in fixed service allocations  
  [ 428 ] Annex 02 - English -  Word 2015-08-26 [14:14]  2'063'376  bytes Supporting material for the development of working document towards a preliminary draft new Question ITU-R F.[HF ENVIRONMENT] - Investigations on HF environment impact factors in HF sky-wave communications  
  [ 428 ] Annex 07 - English -  Word 2015-08-26 [12:17]  7'356'648  bytes Working document towards a preliminary draft new Report ITU-R F.[FS/ RLS COMPATIBILITY IN 71-86 GHz] - Compatibility between P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-77.5 GHz and 78 81 GHz bands  
  [ 428 ] Annex 01 - English -  Word 2015-08-26 [10:11]  328'046  bytes Preliminary draft towards Chapter 1 of Handbook on adaptive HF systems tutorial  
  [ 428 ] Annex 06 - English -  Word 2015-08-25 [16:40]  394'749  bytes Preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for transport of traffic, including backhaul, for IMT and other terrestrial mobile broadband systems  
  [ 428 ] Annex 04 - English -  Word 2015-08-25 [16:06]  119'891  bytes Working document towards a preliminary draft revision of Report ITU-R F.2323-0 - Fixed service use and future trends  
 
[ 436 ]  2015-08-26 WP 5A   Liaison statement to Working Party 4A (copied for information Working Parties 5C and 5D) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]    
  [ 436 ]  - English -  Word 2015-08-27 [09:06]  64'186  bytes  
 
[ 435 ]  2015-08-26 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]    
  [ 435 ]  - English -  Word 2015-08-28 [10:44]  60'337  bytes  
 
[ 434 ]  2015-08-26 WP 5A   Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732    
  [ 434 ]  - English -  Word 2015-08-28 [10:34]  59'630  bytes  
 
[ 433 ]  2015-08-26 WP 5A   Reply liaison statement to Working Party 1A - Copy for information to Working Party 5C, Working Party 7C and Working Party 7D - The land mobile service in the frequency range 275-1 000 GHz    
  [ 433 ]  - English -  Word 2015-08-27 [16:08]  59'782  bytes  
 
[ 432 ]  2015-08-07 MEF   Liaison announcing second approved draft of MEF 22.2 Mobile Blackhaul (MBH) Implementation Agreement Phase 3    
  [ 432 ]  - English -  Word 2015-08-07 [10:44]  54'666  bytes  
 
[ 431 ]  2015-08-03 WP 6A   Liaison statement to ITU-T SG 5 (Copied to ITU-R WP 3L, WP 1A, 1B, 5A, 5B, 5C, 5D, ITU-D SG 2 for information) - Human exposure to RF fields from broadcast transmitters - Comments to WHO monograph - radio frequency fields; environmental health criteria    
  [ 431 ]  - English -  Word 2015-08-04 [15:55]  104'021  bytes  
Results: 17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06