International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 360 ]  
 
Update Report on CITEL PCC.II Activities     CITEL Rapporteur     2016-10-03
[ 359 ]  
 
Liaison statement to 3GPP, ETSI TC/SES, ITU-R Working Party 5D and ITU-T Study Group 13 - Invitation to consider integration of satellite -based solutions into IMT-2020 networks     WP 4B     2016-10-03
[ 358 ]  
 
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz     WP 4C     2016-09-30
[ 357 ]  
 
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band     WP 4C     2016-09-29
[ 356 ]  
 
Liaison statement to Working Party 5D - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries     WP 4C     2016-09-29
[ 355 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur     2016-09-29
[ 354 ]  
 
Activities related to IMT in Region 3     Region 3 Rapporteur     2016-09-29
[ 353 ]  
 
Preliminary results from initial study on propagation measurements for the development of channel models for IMT-2020 technology evaluation     Canada     2016-09-28
[ 352 ]  
 
Channel models for IMT-2020 evaluation     Nokia Solutions and Networks Oy     2016-09-28
[ 351 ]  
 
Harmonization of channel models for the evaluation of IMT-2020 technology proposals     Telefon AB - LM Ericsson , Samsung Electronics Co., Ltd. , Telstra Corporation Ltd.   229-4/5   2016-09-28
[ 350 ]  
 
Development and finalization of PDNR M.[IMT.MODEL]     Intel Corporation , Telefon AB - LM Ericsson     2016-09-28
[ 349 ]  
 
Proposed modification to the working document towards preliminary draft new Report ITU-R M.[IMT-2020.EVAL]     China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Huawei Technologies Co. Ltd. , Intel Corporation , InterDigital Communications Corp. , Nokia Solutions and Networks Oy , NTT DOCOMO Inc. , Orange , Qualcomm, Inc. , Samsung Electronics Co., Ltd. , Spark NZ Limited , Telefon AB - LM Ericsson , Telstra Corporation Ltd. , ZTE Corporation     2016-09-28
[ 348 ]  
 
Working document towards technology aspects on low mobility rural scenario for ITU-R M.[IMT-2020.EVAL]     India (Republic of)     2016-09-28
[ 347 ]  
 
Proposal related to the revision of Recommendation ITU-R M.1036-5     Orange , Telecom Italia S.p.A. , Telefónica, S.A. , Telia Company AB     2016-09-28
[ 346 ]  
 
Proposals for working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]     Telefon AB - LM Ericsson , AT&T, Inc. , China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Huawei Technologies Co. Ltd. , Intel Corporation , InterDigital Communications Corp. , Nokia Solutions and Networks Oy , NTT DOCOMO, Inc. , Orange , Qualcomm, Inc. , Spark NZ Limited , Telstra Corporation Ltd. , ZTE Corporation     2016-09-28
[ 345 ]  
 
Technical performance requirement and evaluation methodology for network energy efficiency     Telefon AB - LM Ericsson , Orange     2016-09-28
[ 344 ]  
 
Deployment-related parameters for IMT-2020 networks to be used in sharing and compatibility studies for WRC-19 agenda item     GSMA     2016-09-28
[ 343 ]  
 
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020. SUBMISSION]     Orange , Telecom Italia S.p.A. , Telefónica, S.A.     2016-09-28
[ 342 ]  
 
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]     Orange , Telecom Italia S.p.A. , Telefónica, S.A.     2016-09-28
[ 341 ]  
 
Proposed update to Document IMT-2020/2, "Submission, evaluation process and consensus building for IMT-2020"     Orange , Telecom Italia S.p.A. , Telefónica, S.A.     2016-09-28
[ 340 ]  
 
Proposed update of the working document towards a preliminary draft new Report M.[IMT.BY OTHER INDUSTRIES] - "The use of terrestrial component of International Mobile Telecommunication (IMT) by other industry sectors"     Telefon AB - LM Ericsson     2016-09-28
[ 339 ]  
 
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 1 427-1 518 MHz     Djibouti (Republic of) , Egypt (Arab Republic of) , Qatar (State of) , United Arab Emirates     2016-09-28
[ 338 ]  
 
Harmonized Spectrum in 700 MHz Band for IoT/M2M     Bahrain (Kingdom of) , Egypt (Arab Republic of) , Jordan (Hashemite Kingdom of) , Lebanon , Qatar (State of) , United Arab Emirates     2016-09-28
[ 337 ]  
 
Comments to preliminary draft new Recommendation ITU-R M.[IMT.MODEL]     European Broadcasting Union     2016-09-28
[ 336 ]  
 
Ground reflection modelling for IMT-2020 channel model     Samsung Electronics Co., Ltd.     2016-09-28
[ 335 ]  
 
Proposal on harmonized channel model for IMT-2020 evaluation     Samsung Electronics Co., Ltd. , Telefon AB - LM Ericsson     2016-09-28
[ 334 ]  
 
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCED SHARING]     Korea (Republic of)     2016-09-28
[ 333 ]  
 
Answers to Question on Spectrum Needs for IMT under WRC-19 agenda item 1.13     Korea (Republic of)   AI1.13   2016-09-28
[ 332 ]  
 
Proposal on channel model for IMT-2020 evaluation     Korea (Republic of)     2016-09-28
[ 331 ]  
 
Proposal of characteristic values of terrestrial IMT systems for frequency sharing/interference analyses in the frequency range between 24.25 GHz and 86 GHZ     Korea (Republic of)     2016-09-28
[ 330 ]  
 
Proposal for Report ITU-R M.[IMT-2020.SUBMISSION]     Korea (Republic of)     2016-09-28
[ 329 ]  
 
Proposal for Report ITU-R M.[IMT-2020.EVAL]     Korea (Republic of)     2016-09-28
[ 328 ]  
 
Proposal for Report ITU-R M.[IMT-2020.TECH PERF REQ]     Korea (Republic of)     2016-09-28
[ 327 ]  
 
Proposal for revision to Document IMT-2020/2 on submission, evaluation process and consensus building for IMT-2020     Korea (Republic of)     2016-09-28
[ 326 ]  
 
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13     Japan   AI1.13   2016-09-28
[ 325 ]  
 
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCE SHARING] under WRC-19 agenda item 9.1 (issue 9.1.1)     Japan   AI9.1   2016-09-28
[ 324 ]  
 
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)     Japan   AI9.1   2016-09-28
[ 323 ]  
 
Proposed modification to the preliminary draft new Recommendation ITU-R M.[IMT.MODEL]     Japan     2016-09-28
[ 322 ]  
 
Views on Recommendation ITU-R M.1036     Japan     2016-09-28
[ 321 ]  
 
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5     Japan     2016-09-28
[ 320 ]  
 
Proposal for revision on IMT-2020/2 "IMT-2020 Process" document     Japan     2016-09-28
[ 319 ]  
 
Optional items to be captured in preliminary draft new Report M.[IMT-2020 SUBMISSION]     Japan , China (People's Republic of) , Korea (Republic of)     2016-09-28
[ 318 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT-2020.SUBMISSION]     Japan     2016-09-28
[ 317 ]  
 
Development of channel models for test environments in Report ITU-R M.[IMT-2020.EVAL]     Japan     2016-09-28
[ 316 ]  
 
Extension module below 6 GHz on channel model for IMT-2020 evaluation     Japan     2016-09-28
[ 315 ]  
 
Additional test environments in Report ITU-R M.[IMT-2020-.EVAL]     Japan , China (People's Republic of)     2016-09-28
[ 314 ]  
 
Evaluation methodology and evaluation configuration for Report ITU-R M.[IMT-2020.EVAL]     Japan     2016-09-28
[ 313 ]  
 
Mapping of technical performance requirements and test environments under usage scenarios     Japan , China (People's Republic of) , Korea (Republic of)     2016-09-28
[ 312 ]  
 
Proposal on target values of technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]     Japan     2016-09-28
[ 311 ]  
 
Proposal on draft Addendum 2 to Circular Letter 5/LCCE/59 on IMT-2020 development     Japan , China (People's Republic of) , Korea (Republic of)     2016-09-28
Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-06-07