Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 236 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power
|
WP 1A
|
|
2024-06-21 |
|
[ 235 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 1A
|
|
2024-06-21 |
|
[ 234 ]
|
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Party 5D for information) - Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect
|
WP 1C
|
|
2024-06-21 |
|
[ 233 ]
|
Update on activities in Region 3
|
Rapporteur Region 3
|
|
2024-06-19 |
|
[ 232 ]
|
Liaison statement on draft Recommendation ITU-T K.DMEI - Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect
|
ITU-T SG5
|
|
2024-06-18 |
|
[ 231 ]
|
Required EMC emission levels in MM wave bands
|
Netherlands (Kingdom of the)
|
|
2024-06-13 |
|
[ 230 ]
|
Proposal to the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES] from Working Party 4A
|
Nokia Corporation
|
|
2024-06-13 |
|
[ 229 ]
|
Proposal to the preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] from Working Party 7D
|
Nokia Corporation
|
|
2024-06-13 |
|
[ 228 ]
|
Initial observations on the candidate technology towards revision-3 of IMT-2020
|
5G India Forum
|
|
2024-06-13 |
|
[ 227 ]
|
Inputs to Working Party 5D#46 (June 2024) on coverage, mobility, sustainability, AI related capabilities towards working Document 5D/77 on M.[TPR] for IMT-2030
|
Reliance Jio Infocomm Limited
|
|
2024-06-13 |
|
[ 226 ]
|
Inputs to Working Party 5D#46 (June 2024) on Annex 2 towards working Document 5D/77 on M.[TPR] for IMT-2030
|
Reliance Jio Infocomm Limited
|
|
2024-06-13 |
|
[ 225 ]
|
Proposed draft reply liaison statement to Working Party 4C on WRC-27 agenda item 1.13
|
Reliance Jio Infocomm Limited
,
Bharti Airtel Limited
|
AI1.13
|
2024-06-13 |
|
[ 224 ]
|
Proposal on working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)
|
India
|
|
2024-06-13 |
|
[ 223 ]
|
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2527-0 - Applications of the terrestrial component of International Mobile Telecommunications for specific societal, industrial and other usages
|
India
|
|
2024-06-13 |
|
[ 222 ]
|
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2480 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT
|
India
|
|
2024-06-13 |
|
[ 221 ]
|
Proposal towards sharing and compatibility studies of IMT systems for WRC-27 agenda item 1.7
|
India
|
AI1.7
|
2024-06-13 |
|
[ 220 ]
|
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Qualcomm, Inc.
|
|
2024-06-13 |
|
[ 219 ]
|
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL]
|
Qualcomm, Inc.
|
|
2024-06-13 |
|
[ 218 ]
|
Proposals for the working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Telefon AB - LM Ericsson
|
|
2024-06-13 |
|
[ 217 ]
|
Considerations of test environments for the evaluation of IMT-2030
|
Telefon AB - LM Ericsson
|
|
2024-06-13 |
|
[ 216 ]
|
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - Security and resilience
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2024-06-12 |
|
[ 215 ]
|
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond - AI-related capacity
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2024-06-12 |
|
[ 214 ]
|
This document has been withdrawn
|
N/A
|
|
2024-06-13 |
|
[ 213 ]
|
Proposed system characteristics to be considered for Earth exploration-satellite service (EESS) (space-to-Earth) in the band 8 025-8 400 MHz under WRC-27 agenda item 1.7
|
Egypt
|
AI1.7
|
2024-06-13 |
|
[ 212 ]
|
List of assignments that the administration of Arab Republic of Egypt had notified to the bureau and that are within the frequency band subject to WRC-27 agenda item 1.13
|
Egypt
|
AI1.13
|
2024-06-13 |
|
[ 211 ]
|
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 7 125-8 400 MHz
|
Egypt
|
AI1.7
|
2024-06-13 |
|
[ 210 ]
|
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz
|
Egypt
|
AI1.7
|
2024-06-13 |
|
[ 209 ]
|
Draft document on sharing and compatibility studies of IMT systems in the frequency band 14.8-15.35 GHz
|
Egypt
|
|
2024-06-13 |
|
[ 208 ]
|
Calculation of pfd limits for protection of terrestrial IMT under WRC-27 agenda item 1.13
|
Germany
|
AI1.13
|
2024-06-13 |
|
[ 207 ]
|
Proposed draft reply liaison statement to Working Party 4C concerning WRC-27 agenda item 1.13
|
Japan
|
AI1.13
|
2024-06-13 |
|
[ 206 ]
|
Proposed working document on frequency arrangements used for terrestrial IMT systems in the frequency ranges between 694/698 MHz and 2.7 GHz concerning WRC-27 agenda item 1.13
|
Japan
|
AI1.13
|
2024-06-13 |
|
[ 205 ]
|
Proposals on working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
Japan
|
|
2024-06-13 |
|
[ 204 ]
|
Proposal on a draft reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14, 1.15
|
Japan
|
AI1.15, AI1.14, AI1.13, AI1.12
|
2024-06-13 |
|
[ 203 ]
|
Proposal to finalize the work on draft revision of Recommendation ITU-R M.1036-7
|
Japan
|
|
2024-06-13 |
|
[ 202 ]
|
Proposals to working document of Document IMT-2030/2 - Process: submission, evaluation process and consensus building for IMT-2030
|
Japan
|
|
2024-06-13 |
|
[ 201 ]
|
Proposals to working document towards a preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS]
|
Japan
|
|
2024-06-13 |
|
[ 200 ]
|
Proposals to working document toward preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] on 4.10 Positioning
|
Japan
|
|
2024-06-13 |
|
[ 199 ]
|
Proposals to working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Japan
|
|
2024-06-13 |
|
[ 198 ]
|
IMT characteristics for use in WRC-27 studies
|
GSM Association
|
|
2024-06-13 |
|
[ 197 ]
|
Considerations for the active antenna array radiation pattern model for IMT base stations
|
Telefon AB - LM Ericsson
|
|
2024-06-13 |
|
[ 196 ]
|
Considerations on possible methodology to be used for sharing studies to assess protection of receiving space stations in the 7 125-8 400 MHz range (WRC-27 agenda item 1.7)
|
France
|
AI1.7
|
2024-06-13 |
|
[ 195 ]
|
Proposals on Recommendation ITU-R S.[MITIGATION MEASURES]
|
France
|
|
2024-06-13 |
|
[ 194 ]
|
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]
|
Mozambique
,
Nigeria
,
Papua New Guinea
|
|
2024-06-13 |
|
[ 193 ]
|
Proposed draft reply liaison statement to Working Party 4C - Work related to WRC-27 agenda item 1.13
|
Germany
|
AI1.13
|
2024-06-13 |
|
[ 192 ]
|
Reply-liaison statement to ITU-R Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond
|
Director, BR
|
|
2024-06-13 |
|
[ 191 ]
|
Further modifications to the working document of Document IMT-2030/1 - IMT-2030 background
|
IAFI
|
|
2024-06-13 |
|
[ 190 ]
|
Technical aspects of TDD technology for connectivity between space station and IMT user equipment for use in the proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.13
|
IAFI
|
AI1.13
|
2024-06-13 |
|
[ 189 ]
|
Propose updates to working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS]
|
IAFI
|
|
2024-06-13 |
|
[ 188 ]
|
Further updates to the working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS]
|
IAFI
|
|
2024-06-13 |
|
[ 187 ]
|
Proposal for IMT characteristics study
|
Korea (Rep. of)
|
|
2024-06-13 |
Results:986 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):