Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 362 ]
|
Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards
|
WP 5B
|
|
2014-11-10 |
|
[ 361 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5B
|
|
2014-11-10 |
|
[ 360 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems
|
WP 5A
|
|
2014-11-10 |
|
[ 359 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2014-11-05 |
|
[ 358 ]
+Ann.1-10 |
Report of the fourteenth meeting of Working Party 5C (Geneva, 27 October - 5 November 2014)
|
Chairman, WP 5C
|
|
2014-11-05 |
|
[ 357 ]
(Rev.2) |
Final list of participants - Working Party 5C (Geneva, 27 October - 5 November 2014)
|
Director, BR
|
|
2014-05-11 |
|
[ 356 ]
|
Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4
|
WP 5A
|
|
2014-11-04 |
|
[ 355 ]
|
Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5A
|
|
2014-10-31 |
|
[ 354 ]
|
List of documents issued (Documents 5C/298 - 5C/354)
|
BR Study Groups Department
|
|
2014-10-27 |
|
[ 353 ]
(Rev.1) |
Liaison statement on Radio-over-fiber (RoF) Technologies and definitions of mobile fronthaul/backhaul
|
ITU-T SG 15
|
|
2014-10-27 |
|
[ 352 ]
|
Liaison statement to Working Party 5C (copy to Working Party 5A) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5D
|
|
2014-10-23 |
|
[ 351 ]
|
Preliminary draft new Report ITU-R M.[WAIC_SHARING_22/23 GHZ] - Sharing studies between wireless avionics intra-communication systems and systems in the 22.5-22.55 GHz and 23.55-23.6 GHz frequency bands and compatibility studies with systems allocated to the passive services in the 22.21-22.5 GHz and 23.6-24.0 GHz frequency bands
|
United States of America
|
|
2014-10-17 |
|
[ 350 ]
|
Considerations on revisions of Recommendations ITU-R F.1247-3, F.1249-3 and F.1509-2
|
Japan
|
|
2014-10-20 |
|
[ 349 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems
|
Japan
|
|
2014-10-20 |
|
[ 348 ]
|
Updating of supporting material from administrations for the development of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLY] - Statistical information for point-to-point systems in the fixed service
|
Japan
|
252/5
|
2014-10-20 |
|
[ 347 ]
|
Proposed revision of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service
|
Japan
|
252/5
|
2014-10-20 |
|
[ 346 ]
|
Statistical information on point-to-point fixed service deployment in Poland
|
ORANGE POLSKA S.A.
|
|
2014-10-20 |
|
[ 345 ]
|
Error performance and availability issues in ITU: Background and current status
|
Huawei Technologies Co. Ltd.
|
|
2014-10-20 |
|
[ 344 ]
|
What are the key items related to the performance and availability objectives and requirements of microwave systems, including packed-bases systems
|
China (People's Republic of)
|
|
2014-10-20 |
|
[ 343 ]
|
Proposal for a new Question on frequency share and operation coordination for HF sky-wave communication stations with moderate/high emission power
|
China (People's Republic of)
|
|
2014-10-20 |
|
[ 342 ]
|
Proposed revision of working document towards preliminary draft new Recommendation ITU-R R.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service
|
Canada
|
|
2014-10-17 |
|
[ 341 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and automotive collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz
|
Canada
|
|
2014-10-17 |
|
[ 340 ]
|
Preliminary draft revision of Recommendation ITU-R F.1778 - Channel access requirements for HF adaptive systems in the fixed and land mobile services
|
Canada
|
|
2014-10-17 |
|
[ 339 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial [mobile] broadband systems
|
Canada
|
253/5, 247/5
|
2014-10-17 |
|
[ 338 ]
|
Proposed revisions to preliminary draft new Report ITU-R F.[FS USE-TRENDS], "Fixed service use and future trends"
|
United States of America
|
|
2014-10-17 |
|
[ 337 ]
|
Report on the Correspondence Group on fixed service use and future trends
|
Chairman, CG FS-tends
|
|
2014-10-17 |
|
[ 336 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Considerations on the G.9700 power spectral density (PSD) limit mask
|
WP 7D
|
|
2014-10-17 |
|
[ 335 ]
|
Editorial update to Recommendation ITU-R F.1703
|
Chairman, WP 5C
|
|
2014-10-17 |
|
[ 334 ]
|
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)
|
WP 7B
|
|
2014-10-16 |
|
[ 333 ]
|
Liaison statement to Working Party 5C - Sharing analyses of wideband EESS SAR transmissions with stations in the fixed, mobile, amateur and amateur-satellite services operating in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz - WRC-15 agenda item 1.12
|
WP 7C
|
|
2014-10-15 |
|
[ 332 ]
|
Draft revision Recommendation ITU-R F.758-5 "System parameters and consideration in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference"
|
Russian Federation
|
|
2014-10-15 |
|
[ 331 ]
|
Progress Report of Joint Correspondence Group activity
|
Chairman, JCG 5A/5C
|
|
2014-10-13 |
|
[ 330 ]
|
Liaison statement on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication
|
ITU-T SG 9
|
|
2014-10-09 |
|
[ 329 ]
|
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2
|
WP 7B
|
|
2014-10-06 |
|
[ 328 ]
|
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
|
ITU-T SG 9
|
|
2014-09-30 |
|
[ 327 ]
|
Liaison statement to Working Party 5C - The channel characteristics of HF propagation paths through the auroral region
|
WP 3L
|
|
2014-09-15 |
|
[ 326 ]
|
Liaison statement to Working Party 5C - Response to Working Party 5C regarding propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz
|
WPs 3J, 3K and 3M
|
|
2014-09-12 |
|
[ 325 ]
|
Liaison statement to Working Party 5C - WRC-15 agenda item 1.6
|
WP 4A
|
|
2014-09-10 |
|
[ 324 ]
|
Liaison statement to Working Party 5C - WRC-15 agenda item 1.9.1
|
WP 4A
|
|
2014-09-10 |
|
[ 323 ]
(Rev.1) |
Results of the 21th RAG meeting
|
Chairman, SG 5
|
|
2014-08-27 |
|
[ 322 ]
|
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement
|
Director, BR
|
|
2014-08-20 |
|
[ 321 ]
|
Reply liaison statement to Working Party 5C - WRC-15 agenda item 1.10
|
WP 4C
|
|
2014-07-17 |
|
[ 320 ]
|
Reply liaison statement to Working Party 5C - WRC-15 agenda item 1.9.2
|
WP 4C
|
|
2014-07-17 |
|
[ 319 ]
|
Reply liaison statement to Working Party 5C - Further development of the Recommendation/Report aimed at assisting coordination between RDSS/MSS and the fixed service in the 2 483.5-2 500 MHz band
|
WP 4C
|
|
2014-07-17 |
|
[ 318 ]
|
Liaison statement to Working Parties 4A and 5C - WRC-15 agenda item 1.8
|
WP 4C
|
|
2014-06-30 |
|
[ 317 ]
|
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
|
WP 1A
|
|
2014-06-20 |
|
[ 316 ]
|
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
|
WP 1A
|
|
2014-06-20 |
|
[ 315 ]
|
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
|
WP 1A
|
|
2014-06-20 |
|
[ 314 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
|
WP 1A
|
|
2014-06-20 |
|
[ 313 ]
|
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
|
WP 1A
|
|
2014-06-20 |
Results:437 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):