Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 448 ]
|
Proposal for the test environments in IMT-2030 evaluation
|
Korea (Rep. of)
|
|
2025-01-22 |
|
[ 447 ]
|
Proposal for update to a working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)
|
Korea (Rep. of)
|
|
2025-01-22 |
|
[ 446 ]
|
Proposal related to the protection criterion in the working document on characteristics of terrestrial component of IMT
|
Canada
|
|
2025-01-21 |
|
[ 445 ]
|
Reply liaison statement on minimum requirements related to technical performance for IMT-2030 radio interface(s)
|
Alliance for Telecommunications Industry Solutions
|
|
2025-01-21 |
|
[ 444 ]
|
Proposal for candidate items for TPR and update to a working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2025-01-20 |
|
[ 443 ]
|
Contribution to Working Party 5D on WRC-27 agenda item 1.7
|
Iran (Islamic Republic of)
|
AI1.7
|
2025-01-20 |
|
[ 442 ]
|
Text proposals for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)
|
India
|
|
2025-01-16 |
|
[ 441 ]
|
Text proposals for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL] - Guidelines for evaluation of radio interface technologies for IMT-2030
|
India
|
|
2025-01-16 |
|
[ 440 ]
|
Reply liaison statement to Working Party 4C on WRC-27 agenda item 1.13
|
India
|
AI1.13
|
2025-01-16 |
|
[ 439 ]
|
Proposal towards sharing and compatibility studies of IMT systems towards WRC-27 agenda item 1.7
|
India
|
AI1.7
|
2025-01-16 |
|
[ 438 ]
|
Liaison statement to Working Party 5D - Progress on the work on elements on a working document towards a new Report ITU-R S.[MITIGATION MEASURES]
|
WP 4A
|
|
2025-01-16 |
|
[ 437 ]
|
Proposal on text of working document towards the preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
ATIS Next G Alliance
|
|
2025-01-16 |
|
[ 436 ]
|
Update on activities in Region 2
|
Region 2 Rapporteur
|
|
2025-01-14 |
|
[ 435 ]
|
Background of edits contained in Documents 5/44 (Revision 3) and 5/45 (Revision 2)
|
Chair, WP 5D
|
|
2025-01-10 |
|
[ 434 ]
|
Working document towards a preliminary draft new Report [MITIGATION IMT] - Mitigation of interference for IMT network under tropospheric ducting effect
|
ATDI
|
|
2025-01-07 |
|
[ 433 ]
|
Documents from Study Group 5 to Working Party 5D
|
Chair, SG 5
|
|
2024-12-20 |
|
[ 432 ]
|
Reply liaison statement to ITU-R Working Party 5D (copy to RAG, TSAG, TDAG, ITU-T Study Groups 17 and 13 and ITU-R Working Party 4B) - Terms and definitions related to IMT-2020 (5G) technology
|
CCT
|
|
2024-12-20 |
|
[ 431 ]
|
Liaison statement to ITU-T Study Group 12 and to ITU-R Working Parties 1A and 5D - Clarifications on the term "conducted radio frequency connection" and its definition
|
CCT
|
|
2024-12-19 |
|
[ 430 ]
|
Reply liaison statement to Working Party 5D - Coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz
|
WP 5C
|
|
2024-12-13 |
|
[ 429 ]
(Rev.1) |
Liaison Note to ITU-R Working Party 5D
|
International Association of Marine Aids to Navigation and Lighthouse Authorities
|
|
2024-12-13 |
|
[ 428 ]
|
Reply liaison statement on parameters for 14 800 to 15 350 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
Director, BR
|
|
2024-12-05 |
|
[ 427 ]
|
Reply liaison statement to Working Party 5D - Additional technical information for sharing and compatibility studies under WRC-27 agenda item 1.7 for ARNS and AM(R)S systems in frequency band 4 200-4 400 MHz
|
WP 5B
|
AI1.7
|
2024-12-05 |
|
[ 426 ]
|
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Working Parties 5D and 1C on base station antenna OTA conformance testing - ITU-D Study Group 2 Question 4/2 - Telecommunication/ICT equipment - Conformance and interoperability, combating counterfeiting and theft of mobile devices
|
ITU-D SG2 - Q4/2
|
|
2024-12-04 |
|
[ 425 ]
|
Liaison statement to Working Party 5D - AMS and MMS systems characteristics in the frequency bands 4 400-4 800 MHz and 14.8-15.35 GHz under WRC-27 agenda item 1.7
|
WP 5B
|
AI1.7
|
2024-12-03 |
|
[ 424 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG1 - Q3/1
|
|
2024-11-27 |
|
[ 423 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-11-18 |
|
[ 422 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
|
WP 6A
|
AI1.17
|
2024-11-18 |
|
[ 421 ]
|
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-11-07 |
|
[ 420 ]
|
Public protection and disaster relief Rapporteur Report
|
PP Disaster Relief Liaison Rapporteur
|
|
2024-11-06 |
|
[ 419 ]
|
Reply liaison statement to Working Party 5D - WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 418 ]
|
Reply liaison statement to Working Party 5D - Relevant information to support studies under WRC-27 agenda item 1.7
|
WP 4C
|
AI1.7
|
2024-10-22 |
|
[ 417 ]
|
Liaison statement to Working Party 5D - Protection of receiving earth stations of the radionavigation satellite service operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz from spurious emissions of IMT stations in the frequency range below 3 GHz
|
WP 4C
|
|
2024-10-22 |
|
[ 416 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 415 ]
|
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 414 ]
|
Proposal towards development of a new Report on "technical feasibility towards providing wireless broadband using IMT technology"
|
Kenya
|
|
2024-09-21 |
|
[ 413 ]
+Ch.7(Rev.1) |
Report on the 47th meeting of Working Party 5D (Geneva, 3-11 October 2024)
|
Acting Chair, WP 5D
|
|
2024-10-11 |
|
[ 412 ]
|
Final list of participants - Working Party 5D (Geneva, 3-11 October 2024)
|
Director, BR
|
|
2024-10-11 |
|
[ 411 ]
|
Update Report on CITEL PCC.II activities
|
CITEL Rapporteur
|
|
2024-10-03 |
|
[ 410 ]
|
Update on recent activities within ATU
|
ITU Region 1 (ATU) Rapporteur
|
|
2024-10-01 |
|
[ 409 ]
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 408 ]
|
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14
|
WP 7C
|
AI1.14
|
2024-09-30 |
|
[ 407 ]
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 406 ]
|
Liaison statement to Working Party 5D regarding WRC-27 agenda item 1.7 - Technical information to support studies under WRC-27 agenda item 1.7 in relation to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.7, AI1.15
|
2024-09-30 |
|
[ 405 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 7D
|
|
2024-09-30 |
|
[ 404 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 7D
|
AI1.7
|
2024-09-30 |
|
[ 403 ]
|
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
|
WP 7B
|
AI1.7
|
2024-09-30 |
|
[ 402 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7D
|
AI1.15
|
2024-09-30 |
|
[ 401 ]
|
Liaison statement to Working Party 5D - WRC-27 agenda items 1.19 and 1.7
|
WP 7C
|
AI1.7, AI1.19
|
2024-09-27 |
|
[ 400 ]
|
Reply liaison statement to Working Party 5D - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
|
WP 7B
|
|
2024-09-27 |
|
[ 399 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
WP 7D
|
AI1.1
|
2024-09-27 |
Results:998 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):