Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 387 ]
|
Liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz
|
WP 1A
|
|
2015-06-16 |
|
[ 386 ]
|
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations
|
WP 1A
|
|
2015-06-12 |
|
[ 385 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 5D, 6A and 7D) - Developments concerning co-existence issues
|
WP 1A
|
|
2015-06-12 |
|
[ 384 ]
|
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
|
WP 1A
|
|
2015-06-12 |
|
[ 383 ]
|
Revision of Preliminary draft new Recommendation ITU-R F.[FS DEPLOY]
|
France
|
|
2015-06-12 |
|
[ 382 ]
|
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7B and 7D - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities
|
WP 1B
|
|
2015-06-11 |
|
[ 381 ]
|
Reply to liaison statements from Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 1A
|
|
2015-06-09 |
|
[ 380 ]
|
Liaison statement on the extension of coax baseband profiles of ITU-T G.hn to 200 MHz
|
ITU-T SG 15
|
|
2015-06-02 |
|
[ 379 ]
|
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2
|
WP 7B
|
|
2015-05-28 |
|
[ 378 ]
|
Liaison statement on development of draft new Question ITU-R [PERFORM]/5 - Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems
|
ITU-T SG 12
|
|
2015-05-20 |
|
[ 377 ]
|
Liaison statement on new Question "Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems"
|
ITU-T SG 13
|
|
2015-05-14 |
|
[ 376 ]
|
Results of the 22nd RAG meeting
|
Chairman, SG 5
|
|
2015-05-13 |
|
[ 375 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth
|
WP 3M
|
|
2015-05-08 |
|
[ 374 ]
(Rev.1) |
Progress of the studies requested by WRC Resolutions and Recommendations (except those directly related to WRC-15 agenda items)
|
Chairman, SG 5
|
|
2015-04-15 |
|
[ 373 ]
|
Liaison statement on time sensitive networking for fronthaul
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2015-03-25 |
|
[ 372 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters
|
WP 6A
|
|
2015-03-03 |
|
[ 371 ]
|
Liaison statement to Working Party 5C (copy to ITU-T Study Group 15 and MEF) - Architecture and topology of IMT networks
|
WP 5D
|
|
2015-02-11 |
|
[ 370 ]
|
Liaison statement to Working Party 1B (copy to WPs 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5D
|
|
2015-02-10 |
|
[ 369 ]
|
Liaison statement to ITU-T Study Group 13 and ITU-R Working Parties 4B and 5C (copy to ITU-D Study Groups 1 and 2) - Handbook on "Global trends in IMT"
|
WP 5D
|
|
2015-02-10 |
|
[ 368 ]
|
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 5D
|
|
2015-02-10 |
|
[ 367 ]
|
Liaison statement on Recommendations ITU-T K.60 - Coexistence of wired and wireless communication systems
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 366 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R SG5 WP 5C on scope of work of Question 2/1
|
ITU-D SG 1 Rapporteur
|
|
2015-01-07 |
|
[ 365 ]
|
Liaison statement on G.supp.Radio-over-Fiber
|
ITU-T SG 15
|
|
2014-12-12 |
|
[ 364 ]
|
Liaison statement to ITU-R Working Party 5C - WRC-15 agenda item 1.5
|
WP 5B
|
|
2014-12-10 |
|
[ 363 ]
|
Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz
|
WP 6A
|
|
2014-12-01 |
|
[ 362 ]
|
Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards
|
WP 5B
|
|
2014-11-10 |
|
[ 361 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5B
|
|
2014-11-10 |
|
[ 360 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems
|
WP 5A
|
|
2014-11-10 |
|
[ 359 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2014-11-05 |
|
[ 358 ]
+Ann.1-10 |
Report of the fourteenth meeting of Working Party 5C (Geneva, 27 October - 5 November 2014)
|
Chairman, WP 5C
|
|
2014-11-05 |
|
[ 357 ]
(Rev.2) |
Final list of participants - Working Party 5C (Geneva, 27 October - 5 November 2014)
|
Director, BR
|
|
2014-05-11 |
|
[ 356 ]
|
Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4
|
WP 5A
|
|
2014-11-04 |
|
[ 355 ]
|
Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5A
|
|
2014-10-31 |
|
[ 354 ]
|
List of documents issued (Documents 5C/298 - 5C/354)
|
BR Study Groups Department
|
|
2014-10-27 |
|
[ 353 ]
(Rev.1) |
Liaison statement on Radio-over-fiber (RoF) Technologies and definitions of mobile fronthaul/backhaul
|
ITU-T SG 15
|
|
2014-10-27 |
|
[ 352 ]
|
Liaison statement to Working Party 5C (copy to Working Party 5A) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5D
|
|
2014-10-23 |
|
[ 351 ]
|
Preliminary draft new Report ITU-R M.[WAIC_SHARING_22/23 GHZ] - Sharing studies between wireless avionics intra-communication systems and systems in the 22.5-22.55 GHz and 23.55-23.6 GHz frequency bands and compatibility studies with systems allocated to the passive services in the 22.21-22.5 GHz and 23.6-24.0 GHz frequency bands
|
United States of America
|
|
2014-10-17 |
|
[ 350 ]
|
Considerations on revisions of Recommendations ITU-R F.1247-3, F.1249-3 and F.1509-2
|
Japan
|
|
2014-10-20 |
|
[ 349 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems
|
Japan
|
|
2014-10-20 |
|
[ 348 ]
|
Updating of supporting material from administrations for the development of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLY] - Statistical information for point-to-point systems in the fixed service
|
Japan
|
252/5
|
2014-10-20 |
|
[ 347 ]
|
Proposed revision of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service
|
Japan
|
252/5
|
2014-10-20 |
|
[ 346 ]
|
Statistical information on point-to-point fixed service deployment in Poland
|
ORANGE POLSKA S.A.
|
|
2014-10-20 |
|
[ 345 ]
|
Error performance and availability issues in ITU: Background and current status
|
Huawei Technologies Co. Ltd.
|
|
2014-10-20 |
|
[ 344 ]
|
What are the key items related to the performance and availability objectives and requirements of microwave systems, including packed-bases systems
|
China (People's Republic of)
|
|
2014-10-20 |
|
[ 343 ]
|
Proposal for a new Question on frequency share and operation coordination for HF sky-wave communication stations with moderate/high emission power
|
China (People's Republic of)
|
|
2014-10-20 |
|
[ 342 ]
|
Proposed revision of working document towards preliminary draft new Recommendation ITU-R R.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service
|
Canada
|
|
2014-10-17 |
|
[ 341 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and automotive collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz
|
Canada
|
|
2014-10-17 |
|
[ 340 ]
|
Preliminary draft revision of Recommendation ITU-R F.1778 - Channel access requirements for HF adaptive systems in the fixed and land mobile services
|
Canada
|
|
2014-10-17 |
|
[ 339 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial [mobile] broadband systems
|
Canada
|
253/5, 247/5
|
2014-10-17 |
|
[ 338 ]
|
Proposed revisions to preliminary draft new Report ITU-R F.[FS USE-TRENDS], "Fixed service use and future trends"
|
United States of America
|
|
2014-10-17 |
Results:437 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):