International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  -  Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 12 ]  
 
Proposed draft liaison statement to Working Party 5A and Working Party 5B on vehicular collision avoidance radars and fixed services within the 71-86 GHz frequency range     Canada     2012-05-07
[ 11 ]  
 
Proposed modifications for the preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in HF fixed and land mobile radiocommunications systems     Canada     2012-05-07
[ 10 ]  
 
Proposed modifications to preliminary draft new Report ITU-R F.[HF-NETWORK RELIABILITY] - Reliability calculations for adaptive HF fixed service network     Canada     2012-05-07
[ 9 ]  
 
Liaison statement to ITU-T Study Groups 9 and 5 and to ITU-R Study Groups 1 and 5 for information - Coexistence of wired and wireless communications systems     WP 6A     2012-05-02
[ 8 ]  
 
Progress report on Joint Correspondence Group activity     Chairman, JCG 5A/5C     2012-04-27
[ 7 ]  
 
Recommendation ITU-R P.1817-1 to be brought to the attention of study groups 1 and 5     SG 3     2012-04-20
[ 6 ]  
 
WRC Resolutions and Recommendations related to the work of Study Group 5     Chairman, SG 5     2012-04-03
[ 5 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1     Chairman, JTG 4-5-6-7     2012-03-26
[ 4 ]  
 
Liaison statement to ITU-R Working Party 5C     ITU-D SG 2     2012-03-21
[ 3 ]  
(Rev.1) 
List of Questions - Completion dates of studies to be updated editorially     Chairman, SG 5     2012-03-21
[ 2 ]  
 
Liaison statement on draft Recommendation Y.energyMRM "Energy Measurement Reference Model"     ITU-T SG 13     2012-02-23
[ 1 ]  
 
Documents to be carried over from the 2007-2011 study period     WP 5C     2012-01-26
Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  -  Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06