International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5A  C 

ITU-R R23-WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:420 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 20 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 7C     2024-03-25
[ 19 ]  
 
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4     Acting Chair, WP 6B   AI1.4   2024-03-20
[ 18 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 17 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
[ 16 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking     WP 6A     2024-03-18
[ 15 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13     WP 6A   AI1.13   2024-03-18
[ 14 ]  
 
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11     WP 6A   AI1.11   2024-03-18
[ 13 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17     WP 6A   AI1.17   2024-03-18
[ 12 ]  
 
Preliminary position on WRC-27 agenda     WMO     2024-03-06
[ 11 ]  
 
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-02-13
[ 10 ]  
 
Reply liaison statement on draft Recommendation ITU-T Q.Req_Frame_RRDN - Requirements and framework for rapid response to sudden natural disasters in network     ITU-T SG11     2024-02-12
[ 9 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz     WP 5D     2024-02-12
[ 8 ]  
 
Reply liaison statement to ITU-D Study Group 1 Question 3/1 (copy to ITU-R Working Parties 5A and 6A) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management     WP 5D     2024-02-12
[ 7 ]  
 
Reply liaison statement to ITU-D Study Group 2 Question 2/2 copy to ITU-T Study Groups 16 and 20, ITU-R Working Party 5A - ITU-D Study Group 2 Question 2/2 - Enabling technologies for e-services and applications, including e-health and e-education     WP 5D     2024-02-09
[ 6 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 5 ]  
 
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairs, SGs 1, 5 & 7     2024-01-22
[ 4 ]  
 
Working Party 5A preparatory work for WRC-27 (copy for information to Working Parties 5B, 5C and 5D)     Chair, WP 5A     2024-01-11
[ 3 ]  
 
Results from the Twentieth Meeting of Study Group 5 (25-26 September 2023) of interest to Working Party 5A     Chair, WP 5A     2024-01-04
[ 2 ]  
 
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups 16 and 20, ITU-R Working Parties 5A and 5D - Enabling technologies for e-services and applications, including e-health and e-education     ITU-D SG2     2023-12-19
[ 1 ]  
 
Documents to be carried over from the 2019-2023 Study Period     WP 5A     2023-12-06
Results:420 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-10-02