Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
AI1.1
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.17
AI1.18
AI1.19
AI1.2
AI1.3
AI1.4
AI1.6
AI1.7
AI1.8
Q250-1/5
Q261/5
Q263/5
Q264/5
Q37-6/5
Borrar filtro
Fecha
[ 52 ]
Working document towards a preliminary draft new Report ITU-R M.[LMS.SPEC.ASPECT.ABOVE.275 GHz] - Spectrum aspect for land-mobile service applications in the frequency above 275 GHz
National Institute of Information and Communications Technology (NICT)
,
Waseda University (Japan)
2024-04-30
[ 51 ]
Finalisation of the revision of Recommendation ITU-R M.1450
Germany
2024-04-29
[ 50 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS] - [Status and trends regarding regional and global usage of audio applications of PMSE in the land mobile service]
Germany
2024-04-29
[ 49 ]
Working document towards a preliminary draft new Report on Milimeter Wave (MMW) communication & sensing - Studies related to new Question ITU-R 264/5
Korea (Rep. of)
Q264/5
2024-04-29
[ 48 ]
Proposal for work on the evolution of Intelligent Transport Systems
Japan
2024-04-26
[ 47 ]
Revision of Recommendation ITU-R M.1450-5
Japan
,
Korea (Rep. of)
,
Saudi Arabia
,
United States
2024-04-26
[ 46 ]
Proposed modifications to the working document towards the preliminary draft revision of Recommendation ITU-R M.1450-5 - Characteristics of broadband radio local area networks
Japan
2024-04-26
[ 45 ]
Disposition of in-force documents related to amateur radio under the responsibility of Working Party 5A
Canada
2024-04-25
[ 44 ]
Revision of Recommendation ITU-R M.1801-2
Canada
2024-04-25
[ 43 ]
Working document towards a preliminary draft revision of Recommendation ITU-R M.1450-5 - Characteristics of broadband radio local area networks
Canada
2024-04-25
[ 42 ]
Revision of Recommendation ITU-R M.1450-5
United Kingdom
2024-04-22
[ 41 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
Chair, CCV
2024-04-22
[ 40 ]
Proposed modification to Annex 6 to Document 5A/837
Institute of Electrical and Electronics Engineers, Inc. (IEEE) (United States)
2024-04-19
[ 39 ]
Working document towards a preliminary draft new Report ITU-R M.[V2X COORD] - V2X Radiocommunication Coordination
United States
2024-04-18
[ 38 ]
The role of intelligent transport systems (ITS) liaison rapporteur to Working Party 5A
United States
2024-04-18
[ 37 ]
Liaison statement on deliveables of FG-TBFXG
FG-TBFxG
2024-04-18
[ 36 ]
Liaison statement on results of the fifth meeting of the FG-MV
ITU-T FG-MV
2024-04-02
[ 35 ]
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18
WP 7D
AI1.18
2024-03-28
[ 34 ]
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16
WP 7D
AI1.16
2024-03-28
[ 33 ]
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18
WP 7D
AI1.18 , AI1.16
2024-03-28
[ 32 ]
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
WP 7B
AI1.15
2024-03-27
[ 31 ]
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
WP 7B
AI1.7
2024-03-27
[ 30 ]
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002
ETSI
2024-03-27
[ 29 ]
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8
WP 7C
AI1.8
2024-03-26
[ 28 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17
WP 7C
AI1.17
2024-03-25
[ 27 ]
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
WP 7C
AI1.19
2024-03-25
[ 26 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
WP 7C
AI1.7
2024-03-25
[ 25 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
WP 7C
AI1.18
2024-03-25
[ 24 ]
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18
WP 7C
AI1.18
2024-03-25
[ 23 ]
Liaison statement to Working Parties 4A, 4C, 5A and 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
WP 7C
AI1.18
2024-03-25
[ 22 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3
WP 7C
AI1.3
2024-03-25
[ 21 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1
WP 7C
AI1.1
2024-03-25
[ 20 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)
WP 7C
2024-03-25
[ 19 ]
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4
Acting Chair, WP 6B
AI1.4
2024-03-20
[ 18 ]
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6
WP 6A
AI1.6
2024-03-18
[ 17 ]
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10
WP 6A
AI1.10
2024-03-18
[ 16 ]
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking
WP 6A
2024-03-18
[ 15 ]
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B,
5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13
WP 6A
AI1.13
2024-03-18
[ 14 ]
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11
WP 6A
AI1.11
2024-03-18
[ 13 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
WP 6A
AI1.17
2024-03-18
[ 12 ]
Preliminary position on WRC-27 agenda
WMO
2024-03-06
[ 11 ]
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7
WP 5D
AI1.7
2024-02-13
[ 10 ]
Reply liaison statement on draft Recommendation ITU-T Q.Req_Frame_RRDN - Requirements and framework for rapid response to sudden natural disasters in network
ITU-T SG11
2024-02-12
[ 9 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
WP 5D
2024-02-12
[ 8 ]
Reply liaison statement to ITU-D Study Group 1 Question 3/1 (copy to ITU-R Working Parties 5A and 6A) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
WP 5D
2024-02-12
[ 7 ]
Reply liaison statement to ITU-D Study Group 2 Question 2/2 copy to ITU-T Study Groups 16 and 20, ITU-R Working Party 5A - ITU-D Study Group 2 Question 2/2 - Enabling technologies for e-services and applications, including e-health and e-education
WP 5D
2024-02-09
[ 6 ]
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
Director, BR
2024-01-30
[ 5 ]
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz
Chairs, SGs 1, 5 & 7
2024-01-22
[ 4 ]
Working Party 5A preparatory work for WRC-27 (copy for information to Working Parties 5B, 5C and 5D)
Chair, WP 5A
2024-01-11
[ 3 ]
Results from the Twentieth Meeting of Study Group 5 (25-26 September 2023) of interest to Working Party 5A
Chair, WP 5A
2024-01-04
Resultados :302 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):