Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 52 ]
|
Working document towards a preliminary draft new Report ITU-R M.[LMS.SPEC.ASPECT.ABOVE.275 GHz] - Spectrum aspect for land-mobile service applications in the frequency above 275 GHz
|
National Institute of Information and Communications Technology (NICT)
,
Waseda University (Japan)
|
|
2024-04-30 |
|
[ 51 ]
|
Finalisation of the revision of Recommendation ITU-R M.1450
|
Germany
|
|
2024-04-29 |
|
[ 50 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS] - [Status and trends regarding regional and global usage of audio applications of PMSE in the land mobile service]
|
Germany
|
|
2024-04-29 |
|
[ 49 ]
|
Working document towards a preliminary draft new Report on Milimeter Wave (MMW) communication & sensing - Studies related to new Question ITU-R 264/5
|
Korea (Rep. of)
|
Q264/5
|
2024-04-29 |
|
[ 48 ]
|
Proposal for work on the evolution of Intelligent Transport Systems
|
Japan
|
|
2024-04-26 |
|
[ 47 ]
|
Revision of Recommendation ITU-R M.1450-5
|
Japan
,
Korea (Rep. of)
,
Saudi Arabia
,
United States
|
|
2024-04-26 |
|
[ 46 ]
|
Proposed modifications to the working document towards the preliminary draft revision of Recommendation ITU-R M.1450-5 - Characteristics of broadband radio local area networks
|
Japan
|
|
2024-04-26 |
|
[ 45 ]
|
Disposition of in-force documents related to amateur radio under the responsibility of Working Party 5A
|
Canada
|
|
2024-04-25 |
|
[ 44 ]
|
Revision of Recommendation ITU-R M.1801-2
|
Canada
|
|
2024-04-25 |
|
[ 43 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1450-5 - Characteristics of broadband radio local area networks
|
Canada
|
|
2024-04-25 |
|
[ 42 ]
|
Revision of Recommendation ITU-R M.1450-5
|
United Kingdom
|
|
2024-04-22 |
|
[ 41 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 40 ]
|
Proposed modification to Annex 6 to Document 5A/837
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE) (United States)
|
|
2024-04-19 |
|
[ 39 ]
|
Working document towards a preliminary draft new Report ITU-R M.[V2X COORD] - V2X Radiocommunication Coordination
|
United States
|
|
2024-04-18 |
|
[ 38 ]
|
The role of intelligent transport systems (ITS) liaison rapporteur to Working Party 5A
|
United States
|
|
2024-04-18 |
|
[ 37 ]
|
Liaison statement on deliveables of FG-TBFXG
|
FG-TBFxG
|
|
2024-04-18 |
|
[ 36 ]
|
Liaison statement on results of the fifth meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-04-02 |
|
[ 35 ]
|
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18
|
WP 7D
|
AI1.18
|
2024-03-28 |
|
[ 34 ]
|
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16
|
WP 7D
|
AI1.16
|
2024-03-28 |
|
[ 33 ]
|
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18
|
WP 7D
|
AI1.18, AI1.16
|
2024-03-28 |
|
[ 32 ]
|
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-03-27 |
|
[ 31 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
|
WP 7B
|
AI1.7
|
2024-03-27 |
|
[ 30 ]
|
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002
|
ETSI
|
|
2024-03-27 |
|
[ 29 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8
|
WP 7C
|
AI1.8
|
2024-03-26 |
|
[ 28 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WP 7C
|
AI1.17
|
2024-03-25 |
|
[ 27 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2024-03-25 |
|
[ 26 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
|
WP 7C
|
AI1.7
|
2024-03-25 |
|
[ 25 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 24 ]
|
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 23 ]
|
Liaison statement to Working Parties 4A, 4C, 5A and 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 22 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3
|
WP 7C
|
AI1.3
|
2024-03-25 |
|
[ 21 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1
|
WP 7C
|
AI1.1
|
2024-03-25 |
|
[ 20 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)
|
WP 7C
|
|
2024-03-25 |
|
[ 19 ]
|
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4
|
Acting Chair, WP 6B
|
AI1.4
|
2024-03-20 |
|
[ 18 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-03-18 |
|
[ 17 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10
|
WP 6A
|
AI1.10
|
2024-03-18 |
|
[ 16 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking
|
WP 6A
|
|
2024-03-18 |
|
[ 15 ]
|
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B,
5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13
|
WP 6A
|
AI1.13
|
2024-03-18 |
|
[ 14 ]
|
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11
|
WP 6A
|
AI1.11
|
2024-03-18 |
|
[ 13 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
|
WP 6A
|
AI1.17
|
2024-03-18 |
|
[ 12 ]
|
Preliminary position on WRC-27 agenda
|
WMO
|
|
2024-03-06 |
|
[ 11 ]
|
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 5D
|
AI1.7
|
2024-02-13 |
|
[ 10 ]
|
Reply liaison statement on draft Recommendation ITU-T Q.Req_Frame_RRDN - Requirements and framework for rapid response to sudden natural disasters in network
|
ITU-T SG11
|
|
2024-02-12 |
|
[ 9 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
|
WP 5D
|
|
2024-02-12 |
|
[ 8 ]
|
Reply liaison statement to ITU-D Study Group 1 Question 3/1 (copy to ITU-R Working Parties 5A and 6A) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
|
WP 5D
|
|
2024-02-12 |
|
[ 7 ]
|
Reply liaison statement to ITU-D Study Group 2 Question 2/2 copy to ITU-T Study Groups 16 and 20, ITU-R Working Party 5A - ITU-D Study Group 2 Question 2/2 - Enabling technologies for e-services and applications, including e-health and e-education
|
WP 5D
|
|
2024-02-09 |
|
[ 6 ]
|
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
|
Director, BR
|
|
2024-01-30 |
|
[ 5 ]
|
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz
|
Chairs, SGs 1, 5 & 7
|
|
2024-01-22 |
|
[ 4 ]
|
Working Party 5A preparatory work for WRC-27 (copy for information to Working Parties 5B, 5C and 5D)
|
Chair, WP 5A
|
|
2024-01-11 |
|
[ 3 ]
|
Results from the Twentieth Meeting of Study Group 5 (25-26 September 2023) of interest to Working Party 5A
|
Chair, WP 5A
|
|
2024-01-04 |
Results:302 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):