Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 373 ]
|
Proposal to include IMT terrestrial and satellite radio interfaces in WRC-27 agenda item 1.13
|
Qualcomm, Inc.
|
AI1.13
|
2024-09-21 |
|
[ 372 ]
|
Proposed methodology to model multi-user beamforming in IMT systems for assessment of its impact on sharing and compatibility studies
|
Telefon AB - LM Ericsson
,
Nokia Corporation
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
|
|
2024-09-20 |
|
[ 371 ]
|
Further considerations for the active antenna array radiation pattern model for IMT base stations
|
Telefon AB - LM Ericsson
|
|
2024-09-20 |
|
[ 370 ]
|
EPFD limits for protection of terrestrial IMT under WRC-27 agenda item 1.13
|
Telefon AB - LM Ericsson
|
AI1.13
|
2024-09-20 |
|
[ 369 ]
|
On sustainable data rate as a technical performance requirement for Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Apple Inc.
|
|
2024-09-20 |
|
[ 368 ]
|
Proposals on the sensing TPR for draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Apple Inc.
|
|
2024-09-20 |
|
[ 367 ]
|
Proposal towards working document towards a preliminary draft revision of Report ITU-R M.2480-1
|
India
|
|
2024-09-20 |
|
[ 366 ]
|
Proposal towards development of the Report on requirements, evaluation criteria and submission templates for the development IMT-2030
|
India
|
|
2024-09-20 |
|
[ 365 ]
|
Proposal on text of working document towards the preliminary draft new Report ITU-R M.[IMT-2030. TECH PERF REQ]
|
India
|
|
2024-09-20 |
|
[ 364 ]
|
Proposal on text for draft document IMT-2030/2 "Process"
|
India
|
|
2024-09-20 |
|
[ 363 ]
|
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL]
|
India
|
|
2024-09-20 |
|
[ 362 ]
|
Proposal for sharing and compatibility studies of IMT SYSTEMS TOWARDS WRC-27 agenda item 1.7
|
India
|
AI1.7
|
2024-09-20 |
|
[ 361 ]
|
Large area aggregation factor of IMT base stations
|
Canada
|
|
2024-09-20 |
|
[ 360 ]
|
Proposal related to the protection criterion in the working document on characteristics of terrestrial component of IMT
|
Canada
|
|
2024-09-20 |
|
[ 359 ]
|
Agenda item 1.13 - sharing and compatibility studies
|
Galaxy Space (Beijing) Communication Technology Co., Ltd
|
AI1.13
|
2024-09-20 |
|
[ 358 ]
|
Proposed draft liaison statement to Working Party 4C on the protection of terrestrial IMT systems concerning WRC-27 agenda item 1.13
|
Japan
|
AI1.13
|
2024-09-20 |
|
[ 357 ]
|
Proposals on working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
Japan
|
|
2024-09-20 |
|
[ 356 ]
|
Proposed text describing the frequency allocations related to preparatory studies for WRC-27 agenda item 1.7
|
Japan
|
AI1.7
|
2024-09-20 |
|
[ 355 ]
|
Proposals to preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS]
|
Japan
|
|
2024-09-20 |
|
[ 354 ]
|
Proposals to working document toward preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - On "4.10 Positioning"
|
Japan
|
|
2024-09-20 |
|
[ 353 ]
|
Proposals to working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Japan
|
|
2024-09-20 |
|
[ 352 ]
|
Interim evaluation Report from ARIB IMT-2020 evaluation group on the IMT-2020 proposal in document IMT-2020/89 by "Nufront" in the IMT-2020 evaluation process
|
Director, BR
|
|
2024-09-20 |
|
[ 351 ]
|
Considerations on the detailed workplan for Report ITU-R M.[IMT-2030.EVAL]
|
China
,
Japan
,
Korea (Rep. of)
|
|
2024-09-20 |
|
[ 350 ]
|
Proposed revision of working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
China
|
|
2024-09-20 |
|
[ 349 ]
|
Proposal for a new Report ITU-R on usage of IMT for object detection and tracking
|
China
|
|
2024-09-20 |
|
[ 348 ]
|
Consideration on TDD frequency bands for agenda item 1.13
|
China
|
AI1.13
|
2024-09-20 |
|
[ 347 ]
|
Considerations on WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2024-09-20 |
|
[ 346 ]
|
Proposal on the IMT parameters towards WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2024-09-20 |
|
[ 345 ]
|
Considerations on the sharing and compatibility studies for the frequency band 14.8-15.35 GHz towards WRC-27 agenda item 1.7
|
China
|
AI1.7
|
2024-09-20 |
|
[ 344 ]
|
Proposed revision of the working document towards sharing and compatibility studies of IMT system in the frequency bands 7 125-8 400 MHz
|
China
|
|
2024-09-20 |
|
[ 343 ]
|
Preliminary sharing and compatibility studies of the fixed service and IMT operating in the frequency band 4 400-4 800 MHz
|
China
|
|
2024-09-20 |
|
[ 342 ]
|
Information on 5G NR MBS standards and practices
|
China
|
|
2024-09-20 |
|
[ 341 ]
|
Proposals on preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and ITU-R M.[IMT-2020.UNWANT.MS]
|
China
|
|
2024-09-20 |
|
[ 340 ]
|
Proposals on IMT-2030/2 "Process"
|
China
|
|
2024-09-20 |
|
[ 339 ]
|
Considerations on the timing for IEG registration and detailed workplan for ITU-R M.[IMT-2030.EVAL]
|
China
|
|
2024-09-20 |
|
[ 338 ]
|
Proposals on guidelines for evaluation of radio interface technologies for IMT-2030
|
China
|
|
2024-09-20 |
|
[ 337 ]
|
Proposal on the draft text of IMT-2030 circular letter
|
China
,
Japan
|
|
2024-09-20 |
|
[ 336 ]
|
Proposal on the draft text of liaison statement to external organizations on new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
China
,
Japan
,
Korea (Rep. of)
|
|
2024-09-20 |
|
[ 335 ]
|
Proposals on the draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
China
|
|
2024-09-20 |
|
[ 334 ]
|
Proposal for working document towards a preliminary draft a new Report ITU-R M.[IMT.A2G]
|
China
|
|
2024-09-20 |
|
[ 333 ]
|
Proposal on RLAN-IMT
|
China
|
|
2024-09-20 |
|
[ 332 ]
|
Proposal on modifications to working document towards a preliminary draft new Report ITU-R M.[FS-IMT COORDINATION]
|
China
|
|
2024-09-20 |
|
[ 331 ]
|
Proposal on new study to address methods for the determination of the protection area around a non-GSO earth station in the frequency band 6 700-7 075MHz from an IMT base station
|
China
|
|
2024-09-20 |
|
[ 330 ]
|
An example of calculation of coordination areas for space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
|
China
|
|
2024-09-20 |
|
[ 329 ]
|
IMT base station deployment density estimation method for capacity deployments in a large area, based on population, for sharing and compatibility studies
|
France
,
Germany
,
United Kingdom
|
|
2024-09-20 |
|
[ 328 ]
|
Proposals to the studies in the 14.8-15.35 GHz frequency band
|
Russian Federation
|
|
2024-09-20 |
|
[ 327 ]
|
Proposal to merge Sections 3 and 4 of working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
Russian Federation
|
|
2024-09-20 |
|
[ 326 ]
|
Proposals to the working document of preliminary draft new Report ITU-R M.[FS-IMT COORDINATION]
|
Russian Federation
|
|
2024-09-20 |
|
[ 325 ]
|
Considerations on roles and responsibilities of Working Parties 4C and 5D under the WRC-27 agenda item 1.13
|
Russian Federation
|
AI1.13
|
2024-09-20 |
|
[ 324 ]
|
Determining coordination areas between space research service (deep space) stations in the frequency band 7 145-7 190 MHz and IMT base stations in the frequency band 6 425-7 125 MHz
|
Russian Federation
|
|
2024-09-20 |
Results:1473 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):