International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 260 ]  
 
Proposals towards revision of Recommendations ITU-R M.2070 and M.2071 regarding unwanted emissions of IMT-Advanced systems     Russian Federation     2016-09-26
[ 259 ]  
 
Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz     France     2016-09-22
[ 258 ]  
 
Technical measures to ensure coexistence between MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz     France     2016-09-22
[ 257 ]  
 
Technical parameters related to IMT-2020 for the compatibility and sharing studies under agenda item 1.13     France   AI1.13   2016-09-22
[ 256 ]  
 
Liaison statement on characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz (3GPP)     Director, BR     2016-09-22
[ 255 ]  
 
Response liaison statement on modelling and simulation of IMT networks for use in sharing and compatibility studies (3GPP)     Director, BR     2016-09-22
[ 254 ]  
 
Proposal to keep alignment between Table 1 of this Report with Tables A4 and A5 of Report ITU-R M.2377     Qatar (State of)     2016-09-19
[ 253 ]  
 
Liaison statement on network security requirements for Public Protection and Disaster Relief (PPDR) and emergency communications     ITU-T SG 17     2016-09-19
[ 252 ]  
 
Correspondence received regarding the update of Recommendation ITU-R M.1457 to Revision 13 ("Certification C")     Director, BR     2016-09-19
[ 251 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-19     Chairman, CPM-19     2016-09-19
[ 250 ]  
 
Liaison statement to ITU-R Working Party 5D - Draft revision of Report ITU-R M.2291     Asia-Pacific Telecommunity     2016-09-16
[ 249 ]  
 
Transposition references for draft Revision 13 of Recommendation ITU-R M.1457 (CCSA)     Director, BR     2016-09-13
[ 248 ]  
 
Transposition references for draft revision 13 of Recommendation ITU-R M.1457 (TTA)     Director, BR     2016-08-30
[ 247 ]  
(Rev.1) 
Transposition references for draft revision 13 of Recommendation ITU-R M.1457 (ARIB)     Director, BR     2016-08-23
[ 246 ]  
 
Transposition references for draft revision 13 of Recommendation ITU-R M.1457 (TIA)     Director, BR     2016-08-17
[ 245 ]  
 
Reply liaison statement on new ITU-T Study Group 20     ITU-T SG 20     2016-08-18
[ 244 ]  
 
Transposition references for draft revision 13 of Recommendation ITU-R M.1457     Alliance for Telecommunications Industry Solutions     2016-08-10
[ 243 ]  
 
Proposed revision of IMT-2020/2 "Submission, evaluation process and consensus building for IMT-2020"     Alliance for Telecommunications Industry Solutions     2016-08-10
[ 242 ]  
 
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WPs 3K and 3M   AI1.15   2016-07-06
[ 241 ]  
 
Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)     ITU-T SG 15   -   2016-07-06
[ 240 ]  
(Rev.1) 
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz     WPs 3K and 3M     2016-07-04
[ 239 ]  
 
Reply liaison statement to Working Party 4C (copied for information to Working Party 5D) - Studies related to coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz     WP 3M     2016-07-04
[ 238 ]  
 
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)     WP 3M     2016-07-04
[ 237 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Party 4C) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band     WPs 3K and 3M     2016-07-01
[ 236 ]  
 
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios     WPs 3K and 3M     2016-07-01
[ 235 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WPs 3J and 3M     2016-07-01
[ 234 ]  
+Ch.1-7 
Report on the twenty-fourth meeting of Working Party 5D (Geneva, 14-22 June 2016)     Chairman, WP 5D     2016-06-22
[ 233 ]  
 
Final List of Participants - Working Party 5D (Geneva, 14-22 June 2016)     Director, BR     2016-06-22
[ 232 ]  
 
Update on recent activities within ATU     ITU Region 1 (ATU) Rapporteur     2016-06-20
[ 231 ]  
 
Correspondence received regarding the update of Recommendation ITU-R M.1457 to Revision 13 ("Certification B")     Director, BR     2016-06-16
[ 230 ]  
 
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 3     Director, BR     2016-06-16
[ 229 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 1A     2016-06-13
[ 228 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 227 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans     WP 1A     2016-06-13
[ 226 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 225 ]  
 
Update on standards activities     Region 2 Rapporteur     2016-06-13
[ 224 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO:fundamental safety principles for protection against non-ionizing radiation     SG 1     2016-06-13
[ 223 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 222 ]  
 
Liaison statement to Working Parties 5A and 5C on infrastrucutre sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum     WP 1B   208-1/1   2016-06-13
[ 221 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
[ 220 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur     2016-06-09
[ 219 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A     2016-06-08
[ 218 ]  
 
Proposals for test environments and deployment scenarios for IMT-2020 radio interface technologies     Telefon AB - LM Ericsson , DOCOMO, Inc. , Qualcomm, Inc.     2016-06-07
[ 217 ]  
 
Proposals for working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]     AT&T, Inc. , China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Huawei Technologies Co. Ltd. , Intel Corporation , NTT DOCOMO, Inc., , Qualcomm, Inc. , Telefon AB - LM Ericsson , Telstra Corporation Ltd. , ZTE Corporation     2016-06-07
[ 216 ]  
 
Considerations on targets for IMT-2020 technical performance requirements     Telefon AB - LM Ericsson , Qualcomm, Inc.     2016-06-07
[ 215 ]  
 
Consideration on Report ITU-R M.[IMT-2020.SUBMISSION]     Huawei Technologies Co. Ltd. , Intel Corporation , Nokia Solutions and Networks Oy , Qualcomm, Inc. , Telefon AB - LM Ericsson , Telstra Corporation Ltd. , ZTE Corporation     2016-06-07
[ 214 ]  
 
Consideration on channel model for IMT-2020 Evaluation     Nokia Solutions and Networks Oy     2016-06-07
[ 213 ]  
 
Proposal for Document IMT-2020/001, "IMT-2020 Background"     Orange , Telecom Italia S.p.A.     2016-06-07
[ 212 ]  
 
Proposed modifications to "IMT-2020 Process" document     Orange , Telecom Italia S.p.A.     2016-06-07
[ 211 ]  
 
Proposals for a new Report on technical and operational aspects of Machine-Type Communications     Thales SA     2016-06-07
Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-06-07