International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1A  C 

ITU-R R23-WP1A

Spectrum Engineering Techniques

Results:112 total items.
Result page:  Previous -  1 - 2 - 3
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 12 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
[ 11 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking     WP 6A     2024-03-18
[ 10 ]  
 
Liaison statement on terms contained in ITU-T Study Group 5 draft recommendations     SCV/CCT     2024-02-19
[ 9 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz     WP 5D     2024-02-12
[ 8 ]  
(Rev.1) 
Summary of the main results of RA-23 and CPM27-1 related to Study Group 1     Chair, SG 1     2024-02-05
[ 7 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 6 ]  
 
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairs, SGs 1, 5 & 7     2024-01-22
[ 5 ]  
 
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan     ITU-T SG15     2023-12-21
[ 4 ]  
 
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan     ITU-T SG15     2023-12-21
[ 3 ]  
 
Liaison statement on the role of powerline communications in home-networking     ITU-T SG15     2023-12-20
[ 2 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Working Party 1/5, ITU-R Working Parties 1A, 1C and 6A on strategies and policies concerning human exposure to RF-EMF     ITU-D SG2     2023-12-20
[ 1 ]  
 
Documents to be carried over from the 2019-2023 Study Period     WP 1A     2023-11-29
Results:112 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-10-03