International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 RG-AFR Recently posted -  Search Meeting Documents
   
ITU-T SG05 RG-AFR Meeting Documents
  Max # of documents displayed/page:
Results: 24 total items.
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ TD 16-PLEN ]  2026-02-26 TSB   Nomination of Vice Chair for ITU-T SG5 Regional Group for Africa (SG5RG-AFR) from Egypt     QALL/5  
  [ TD 16-PLEN ]  - English -  Word 2026-03-02 [09:20]  50'015  bytes  
 
[ TD 14-PLEN ]  2026-02-20 TSB   Executive summary of the second meeting of ITU-T Study Group 5 (Geneva, 29 October - 6 November 2025)     QALL/5  
  [ TD 14-PLEN ]  - English -  Word 2026-03-02 [09:19]  142'471  bytes  
 
[ TD 15-PLEN ]  2026-02-20 TSB   SG5RG-AFR priorities     QALL/5  
  [ TD 15-PLEN ]  - English -  Word 2026-02-20 [15:11]  47'891  bytes  
 
[ TD 13-PLEN ]  2026-02-20 TSB   Report of the meeting of ITU-T SG5RG-AFR (Ouagadougou, 7-9 May 2024)     QALL/5  
  [ TD 13-PLEN ]  - English -  Word 2026-02-20 [15:09]  59'015  bytes  
 
[ TD 12-PLEN ]  2026-02-20 TSB   Bridging the standardization gap and Regional Groups     QALL/5  
  [ TD 12-PLEN ]  - English -  Zip (Document) 2026-02-20 [15:07]  454'827  bytes  
 
[ TD 11-PLEN ]  2026-02-20 TSB   List of SG5RG-AFR Member states     QALL/5  
  [ TD 11-PLEN ]  - English -  Word 2026-02-20 [15:06]  49'129  bytes  
 
[ TD 10-PLEN ]  2026-02-20 TSB   Terms of Reference of SG5RG-AFR     QALL/5  
  [ TD 10-PLEN ]  - English -  Word 2026-02-20 [15:05]  52'758  bytes  
 
[ TD 9-PLEN ]  2026-02-20 TSB   Management team of SG5RG-AFR     QALL/5  
  [ TD 9-PLEN ]  - English -  Word 2026-02-20 [15:02]  48'003  bytes  
 
[ TD 8-PLEN ]  2026-02-20 TSB   List of Study Group 5 Management team, Rapporteurs and Associate Rapporteurs     QALL/5  
  [ TD 8-PLEN ]  - English -  Word 2026-02-20 [15:02]  65'792  bytes  
 
[ TD 7-PLEN ]  2026-02-20 TSB   Guidelines for the preparation of Contributions to ITU-T: Relevant ITU A-series Recommendation     QALL/5  
  [ TD 7-PLEN ]  - English -  Word 2026-02-20 [14:58]  53'342  bytes  
 
[ TD 6-PLEN ]  2026-02-20 TSB   Resolution 2 (Rev. New Delhi, 2024) "Scope and mandate of the ITU Telecommunication Standardization Sector study groups"- Related to ITU-T Study Group 5     QALL/5  
  [ TD 6-PLEN ]  - English -  Word 2026-02-20 [14:56]  52'992  bytes  
 
[ TD 4-PLEN ]  2026-02-20 TSB   Action plans for implementation of WTSA-24 Resolutions 72, 73 and 79 (Rev. New Delhi, 2024) (human exposure to EMF, environment, climate change and circular economy; and e-waste)     QALL/5  
  [ TD 4-PLEN ]  - English -  Word 2026-02-20 [14:46]  72'498  bytes  
 
[ C 5 ]  2026-02-19 Uganda   ICT E-Waste Collection Pilot Project in Uganda (Information Document)     Q3/5  
  [ C 5 ]  - English -  Word 2026-02-19 [16:05]  43'421  bytes  
 
[ C 4 ]  2026-02-19 Uganda   Guideline for the "Assessment of Radio Frequency Electromagnetic Fields (RF-EMF) exposure from Communications Infrastructure and Services"     Q3/5  
  [ C 4 ]  - English -  Zip (Document) 2026-02-19 [16:03]  874'525  bytes  
 
[ C 3 ]  2026-02-19 Uganda   Baseline text for Draft Recommendation ITU-T L.HRES_PD&_HA "Hybrid Renewable Energy System from solar based for ICT Portable Devices and Low-Power Home Appliance"     Q6/5, Q7/5  
  [ C 3 ]  - English -  Word 2026-02-19 [15:58]  41'017  bytes  
 
[ C 2 ]  2026-02-19 Egypt, Uganda   Draft Recommendation ITU-T L.UPCSW "Universal power adapter and charger solution for smart watches and smart bands"     Q7/5  
  [ C 2 ]  - English -  Word 2026-02-19 [15:56]  40'907  bytes  
 
[ C 1 ]  2026-01-12 Ministere de l'Economie Numerique des Postes et Telecommunications (RCA)   Central African Republic e-waste strategies     Q7/5  
  [ C 1 ] Revision 1 - Español -  Word 2026-02-19 [15:44]  31'966  bytes  
  [ C 1 ] Revision 1 - Français -  Word 2026-02-19 [15:44]  47'894  bytes  
  [ C 1 ] Revision 1 - English -  Word 2026-02-19 [15:44]  32'085  bytes  
  [ C 1 ]  - Español -  Word 2026-01-22 [14:35]  31'855  bytes  
  [ C 1 ]  - English -  Word 2026-01-22 [14:35]  32'043  bytes  
  [ C 1 ]  - Français -  Word 2026-01-12 [16:54]  47'816  bytes  
 
[ COL 1 ]  2025-11-27 TSB   Meeting of the ITU-T Study Group 5 Regional Group for Africa (SG5RG-AFR), Malabo, Republic of Equatorial Guinea, 10-13 February 2026     N/A  
  [ COL 1 ] Addendum 2 - Français -  Word 2026-02-02 [09:55]  51'687  bytes  
  [ COL 1 ] Addendum 2 - English -  Word 2026-01-27 [17:04]  65'779  bytes  
Results: 24 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2026-03-02