International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2004-03-01 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG11  TD-WP2 (2004-03-01) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2001

Meeting  from 2004-03-01 to 2004-03-12

held in Switzerland [Geneva]

Other Meetings : [ 2004-03-01 ]  2003-09-01  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Results:26 total items.
Temporary Documents  (WP2)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 26-WP2 ]  
 
Draft discussion summary of Q8/11 meetings on 4-5 March 2004     WP 2/11 Chairman (G. Ratta)   Q8/11   2004-03-05
[ 25-WP2 ]  
 
BICC CS3 Overall Requirements (Restructured)     Editor (D. Knight)   Q9/11   2004-03-04
[ 24-WP2 ]  
 
Draft BICC CS3 Requirement Flows (Draft TRQ.BICC.CS3.flows)     Editor (I. Rytina)   Q9/11   2004-03-03
[ 23-WP2 ]  
 
BICC CS3 overall Requirements (output)     Editor (D. Knight)   Q9/11   2004-03-03
[ 22-WP2 ]  
 
Q9/11 meeting report     Rapporteur (L. Graf)   Q9/11   2004-03-02
[ 21-WP2 ]  
(Rev.1) 
Draft Signalling Requirements to support IP telephony (INPUT)     Rapporteur (K. Kenyoshi)   Q7/11   2004-03-01
[ 20-WP2 ]  
 
Proposed Agenda of Q.7/11 (SWP2-2)     Rapporteur (K. Kenyoshi)   Q7/11   2004-03-01
[ 19-WP2 ]  
 
Proposed Agenda for Q8/11 Discussions     WP2/11 Chairman (G. Ratta)   Q8/11   2004-02-29
[ 18-WP2 ]  
(Rev.1) 
Meeting agenda, document allocation and schedule.     Rapporteur (L. Graf)   Q9/11   2004-02-26
[ 17-WP2 ]  
(Rev.1) 
Q6/11 Agenda     Q6/11 Rapporteur (K. Mainwaring)   Q6/11   2004-02-25
[ 16-WP2 ]  
(Rev.1-2) 
Technical Report TRQ.NSIP Syntax Requirements For Carrying Narrowband Signalling Information Within IP-Based Signalling Systems     Editor (T. Fu)   Q6/11   2004-02-24
[ 15-WP2 ]  
 
Reply to Proposal on control plane interworking between FR and MPLS     SG 17 (GVA, 10-19 Sept. 2003)   Q5/17, Q8/11   2003-10-07
[ 14-WP2 ]  
(Rev.1) 
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS     Editor pro tem (G. Ratta)   Q9/11, Q8/11, Q7/11   2004-02-23
[ 13-WP2 ]  
(Rev.1) 
WP 2/11 Work Programme     WP2/11 Vice-Chairman (D. Knight)   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-21
[ 12-WP2 ]  
 
BICC CS3 Overall Requirements (input)     Editor, TRQ.BICC.CS3.GEN (D. Knight)   Q9/11   2004-02-19
[ 11-WP2 ]  
 
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Editor (R. Jesske)   Q9/11, Q6/11   2004-02-18
[ 10-WP2 ]  
 
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Editor (R. Jesske)   Q9/11, Q6/11   2004-02-18
[ 9-WP2 ]  
(Rev.1) 
Draft new Recommendation Y.e2eqos on an end-to-end QoS architecture for IP networks evolving into the NGN  
R1 submitted by SG13 on 20.02.04 in replacement of TD 9-2/11
 
SG13 (GVA 3-12 February 2004)   Q16/13, Q8/11   2004-02-17
[ 8-WP2 ]  
 
Liaison Statement - QoS signalling requirements pertaining to the draft new Recommendation Y.123.qos on a Qos architecture for Ethernet-based access networks     SG13 (GVA 3-12 February 2004)   Q16/13, Q8/11   2004-02-17
[ 7-WP2 ]  
 
Reply LS to SG 11 on Signalling Requirements for IP-QoS     SG 16 ( GVA 20-30 January 2004)   QF/16, Q8/11   2004-02-05
[ 6-WP2 ]  
 
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony     SG 9 (Honolulu, 15-21 January 2004)   Q13/9, Q12/9, Q10/9, Q7/11   2004-02-04
[ 5-WP2 ]  
 
Liaison Statement - Update on QoS Lead Study Group activities     SG12 (GVA 30.09.03)   Q15/12, Q8/11   2003-10-10
[ 4-WP2 ]  
 
Liaison Statement - Response to liaison on Draft Signalling Requirements to Support "IP Telephony"     ETSI TISPAN (TIPHON) 1-5 Dec. 2003   Q7/11   2003-12-11
[ 3-WP2 ]  
 
Liaison Statement - Revised Recommendation G.114     SG12 (GVA 30.09.03)   Q10/12, Q8/11   2003-10-10
[ 2-WP2 ]  
 
List of WP2/11 Series Temporary Documents     TSB   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-27
[ 1-WP2 ]  
 
Agenda - WP2/11 Plenary Sessions  
To be provided
 
N/A     N/A
Results:26 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-5-25