Temporary Documents
(WP2)
 |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 26-WP2 ]
|
Draft discussion summary of Q8/11 meetings on 4-5 March 2004
|
WP 2/11 Chairman (G. Ratta)
|
Q8/11
|
2004-03-05 |
|
[ 25-WP2 ]
|
BICC CS3 Overall Requirements (Restructured)
|
Editor (D. Knight)
|
Q9/11
|
2004-03-04 |
|
[ 24-WP2 ]
|
Draft BICC CS3 Requirement Flows (Draft TRQ.BICC.CS3.flows)
|
Editor (I. Rytina)
|
Q9/11
|
2004-03-03 |
|
[ 23-WP2 ]
|
BICC CS3 overall Requirements (output)
|
Editor (D. Knight)
|
Q9/11
|
2004-03-03 |
|
[ 22-WP2 ]
|
Q9/11 meeting report
|
Rapporteur (L. Graf)
|
Q9/11
|
2004-03-02 |
|
[ 21-WP2 ]
(Rev.1) |
Draft Signalling Requirements to support IP telephony (INPUT)
|
Rapporteur (K. Kenyoshi)
|
Q7/11
|
2004-03-01 |
|
[ 20-WP2 ]
|
Proposed Agenda of Q.7/11 (SWP2-2)
|
Rapporteur (K. Kenyoshi)
|
Q7/11
|
2004-03-01 |
|
[ 19-WP2 ]
|
Proposed Agenda for Q8/11 Discussions
|
WP2/11 Chairman (G. Ratta)
|
Q8/11
|
2004-02-29 |
|
[ 18-WP2 ]
(Rev.1) |
Meeting agenda, document allocation and schedule.
|
Rapporteur (L. Graf)
|
Q9/11
|
2004-02-26 |
|
[ 17-WP2 ]
(Rev.1) |
Q6/11 Agenda
|
Q6/11 Rapporteur (K. Mainwaring)
|
Q6/11
|
2004-02-25 |
|
[ 16-WP2 ]
(Rev.1-2) |
Technical Report TRQ.NSIP Syntax Requirements For Carrying Narrowband Signalling Information Within IP-Based Signalling Systems
|
Editor (T. Fu)
|
Q6/11
|
2004-02-24 |
|
[ 15-WP2 ]
|
Reply to Proposal on control plane interworking between FR and MPLS
|
SG 17 (GVA, 10-19 Sept. 2003)
|
Q5/17, Q8/11
|
2003-10-07 |
|
[ 14-WP2 ]
(Rev.1) |
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS
|
Editor pro tem (G. Ratta)
|
Q9/11, Q8/11, Q7/11
|
2004-02-23 |
|
[ 13-WP2 ]
(Rev.1) |
WP 2/11 Work Programme
|
WP2/11 Vice-Chairman (D. Knight)
|
Q9/11, Q8/11, Q7/11, Q6/11
|
2004-02-21 |
|
[ 12-WP2 ]
|
BICC CS3 Overall Requirements (input)
|
Editor, TRQ.BICC.CS3.GEN (D. Knight)
|
Q9/11
|
2004-02-19 |
|
[ 11-WP2 ]
|
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol
|
Editor (R. Jesske)
|
Q9/11, Q6/11
|
2004-02-18 |
|
[ 10-WP2 ]
|
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol
|
Editor (R. Jesske)
|
Q9/11, Q6/11
|
2004-02-18 |
|
[ 9-WP2 ]
(Rev.1) |
Draft new Recommendation Y.e2eqos on an end-to-end QoS architecture for IP networks evolving into the NGN
R1 submitted by SG13 on 20.02.04 in replacement of TD 9-2/11
|
SG13 (GVA 3-12 February 2004)
|
Q16/13, Q8/11
|
2004-02-17 |
|
[ 8-WP2 ]
|
Liaison Statement - QoS signalling requirements pertaining to the draft new Recommendation Y.123.qos on a Qos architecture for Ethernet-based access networks
|
SG13 (GVA 3-12 February 2004)
|
Q16/13, Q8/11
|
2004-02-17 |
|
[ 7-WP2 ]
|
Reply LS to SG 11 on Signalling Requirements for IP-QoS
|
SG 16 ( GVA 20-30 January 2004)
|
QF/16, Q8/11
|
2004-02-05 |
|
[ 6-WP2 ]
|
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony
|
SG 9 (Honolulu, 15-21 January 2004)
|
Q13/9, Q12/9, Q10/9, Q7/11
|
2004-02-04 |
|
[ 5-WP2 ]
|
Liaison Statement - Update on QoS Lead Study Group activities
|
SG12 (GVA 30.09.03)
|
Q15/12, Q8/11
|
2003-10-10 |
|
[ 4-WP2 ]
|
Liaison Statement - Response to liaison on Draft Signalling Requirements to Support "IP Telephony"
|
ETSI TISPAN (TIPHON) 1-5 Dec. 2003
|
Q7/11
|
2003-12-11 |
|
[ 3-WP2 ]
|
Liaison Statement - Revised Recommendation G.114
|
SG12 (GVA 30.09.03)
|
Q10/12, Q8/11
|
2003-10-10 |
|
[ 2-WP2 ]
|
List of WP2/11 Series Temporary Documents
|
TSB
|
Q9/11, Q8/11, Q7/11, Q6/11
|
2004-02-27 |
|
[ 1-WP2 ]
|
Agenda - WP2/11 Plenary Sessions
To be provided
|
N/A
|
|
N/A |
Results:26 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):