Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP7D Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP7D Documents de réunions
  Nb max de documents affichés/page:
Résultats: 74 documents
Result Page:  1 - 2  - Suivant
Numéro  Date Source Titre Questions 
  Numéro  Mise à disposition Taille    
 
[ 286 ]  2026-03-12 Chair, WP 7D   Report of the meeting of Working Party 7D (Geneva, 2-12 March 2026)     N/A  
  [ 286 ]  - English - Word 2026-04-15 [08:22]  107'887  octets Report on the March 2026 meeting of Working Party 7D (Geneva, with online participation, 2-12 March 2026)  
  [ 286 ] Annex 23 - English - Word 2026-04-01 [11:00]  40'886  octets List of documents issued - (Documents 7D/TEMP/112 - 7D/TEMP/139)  
  [ 286 ] Annex 20 - English - Word 2026-03-26 [13:32]  108'381  octets Preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of radio astronomy receivers  
  [ 286 ] Annex 22 - English - Word 2026-03-26 [12:00]  9'219'035  octets Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Radiation from spaceborne electrical equipment into RAS frequency bands  
  [ 286 ] Annex 21 - English - Word 2026-03-26 [11:57]  53'250  octets Preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers  
  [ 286 ] Annex 19 - English - Word 2026-03-26 [11:51]  78'447  octets Working document towards a preliminary draft new [Recommendation/Report] on threshold levels above 275 GHz - [Threshold levels for Radio Astronomy Observations above 275 GHz/Protection criteria used for Radio Astronomy Measurements above 275 GHz] - Development of protection criteria used for Radio Astronomy Measurements above 275 GHz  
  [ 286 ] Annex 18 Part 1 - English -  Excel 2007 2026-03-26 [11:48]  28'372  octets  
  [ 286 ] Annex 18 - English - Word 2026-03-26 [11:48]  305'620  octets Radio astronomy station antenna characteristics  
  [ 286 ] Annex 17 - English - Word 2026-03-26 [11:43]  67'191  octets Working document towards a preliminary draft new Report ITU-R RA.[SPACEVLBI] - Technical and operational characteristics of space-based very long baseline interferometry for radio astronomy  
  [ 286 ] Annex 16 - English - Word 2026-03-26 [11:39]  7'070'143  octets Proposed updates to some elements for working document towards a preliminary draft new Report ITU-R RA.[SATCON-AGG] - Determining the interference levels and data loss to the radio astronomy service caused by single and multiple satellite systems  
  [ 286 ] Annex 15 - English - Word 2026-03-26 [11:37]  59'064  octets Working document towards a preliminary draft new Report ITU-R RA.[BSA] - Evaluation of radio telescope boresight avoidance and its impact on reduction of unwanted emissions from non-GSO satellite systems  
  [ 286 ] Annex 14 - English - Word 2026-03-26 [11:35]  2'055'557  octets Preliminary draft new Report ITU-R RA.[SZM-FAC] - Radio astronomy facilities on the Moon  
  [ 286 ] Annex 13 - English - Word 2026-03-26 [11:32]  164'442  octets Working document towards a preliminary draft new Recommendation [SZM_THRESHOLDS] - Threshold levels of [permissible/harmful] interference to radio astronomy in the shielded zone of the Moon  
  [ 286 ] Annex 12 - English - Word 2026-03-26 [11:30]  48'426  octets Working document towards a preliminary draft new Report ITU-R RA.[SZM-DARK_SECTOR] - Spectrum management practices and experience gained from RAS operations in Antarctica and similarly remote environments  
  [ 286 ] Annex 11 - English - Word 2026-03-26 [11:03]  72'378  octets Working document towards a preliminary draft new Report ITU-R RA.[SZM_THRESHOLDS] - Threshold levels of interference to radio astronomy in the shielded zone of the Moon  
  [ 286 ] Annex 10 - English - Word 2026-03-26 [10:58]  60'205  octets Working document towards a preliminary draft new Recommendation ITU-R RA.[ANTREF-45GHz] - Reference Radio astronomy antenna patterns to be used for certain frequencies above 45 GHz for epfd analyses  
  [ 286 ] Annex 2 - English - Word 2026-03-26 [09:07]  3'718'399  octets Working document towards a preliminary draft new Report ITU-R RA.[NGSO-RAS-RQZ] - Studies on new coexistence measures between non-GSO satellite systems and RAS stations in the Radio Quiet Zones supporting the Square Kilometre Array Observatory (SKAO) and the Atacama Large Millimeter/submillimeter Array (ALMA)]  
  [ 286 ] Annex 1 - English - Word 2026-03-25 [15:47]  97'146  octets Working document towards draft CPM text for WRC-27 agenda item 1.16  
  [ 286 ] Annex 3 - English - Word 2026-03-25 [14:23]  4'071'488  octets Working document towards preliminary draft new Report ITU-R RA.[AGG-NGSO-ABOVE-10 GHZ] - Aggregated interference from non-GSO satellite systems into radio astronomy service in primary bands 10.6-10.7, 42.5-43.5, 76-77.5 94.1-95, 100 102 and 130-134 GHz  
  [ 286 ] Annex 5 - English - Word 2026-03-25 [12:05]  61'037  octets Working document towards a preliminary draft new Recommendation ITU-R RA.[RAS-NGSO] - Minimizing interference from non-GSO satellites at RAS stations  
  [ 286 ] Annex 4 - English - Word 2026-03-25 [10:35]  7'011'699  octets Document ITU-R RA.[AI] - Elements towards WRC-27 agenda item 1.16  
  [ 286 ] Annex 7 - English - Word 2026-03-24 [17:07]  95'653  octets Considerations on draft CPM text for WRC-27 agenda item 1.18  
  [ 286 ] Annex 6 - English - Word 2026-03-24 [13:55]  58'476  octets Work plan proposal for WRC-27 agenda item 1.18 on resolves 2 of Resolution 712 (WRC-23)  
  [ 286 ] Annex 8 - English - Word 2026-03-24 [11:16]  3'739'526  octets Preliminary draft new Report ITU-R RA.[RAS-SAT 71-235 GHZ] - Compatibility between RAS operating in the 76-81, 130-134, 164-167 and 226-231.5 GHz and adjacent active satellite services  
  [ 286 ] Annex 9 - English - Word 2026-03-23 [16:09]  60'075  octets Preliminary draft revision of Recommendation ITU-R RA.1631 - Reference radio astronomy antenna pattern to be used for compatibility analyses between non-GSO systems and radio astronomy service stations based on the epfd concept  
 
[ 288 ]  2026-03-26 WP 7C   Liaison statement to working parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D regarding progress of work - WRC-27 agenda item 1.17     AI1.17  
  [ 288 ]  - English - Word 2026-03-26 [15:07]  34'289  octets  
 
[ 287 ]  2026-03-26 WP 7B   Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15     AI1.15  
  [ 287 ]  - English - Word 2026-03-26 [14:44]  38'209  octets  
 
[ 285 ]  2026-03-12 Director, BR   Final list of participants - Working Party 7D (Geneva, 2-12 March 2026)     N/A  
  [ 285 ]  - English -  PDF (acrobat) 2026-03-12 [15:06]  143'586  octets  
 
[ ADM 27 ]  2026-03-12 Chair, WP 7D   Draft agenda for the Plenary meeting of Working Party 7D - Thursday, 12 March 2026, at 0900 hours (Geneva time) (Room K, Montbrillant)     N/A  
  [ ADM 27 ]  - English - Word 2026-03-12 [08:15]  34'639  octets  
 
[ ADM 26 ]  2026-03-10 Chair, WP 7D   Draft Agenda for Working Party 7D Plenary Session - Tuesday, 10 March 2026, at 1730 hours (Room K, Montbrillant)     N/A  
  [ ADM 26 ]  - English - Word 2026-03-10 [10:20]  49'149  octets  
 
[ ADM 25 ]  2026-03-09 Chairs, WPs 7B & 7D   Draft agenda for the Joint meeting of Working Parties 7B and 7D - Monday, 9 March 2026, 0900 - 1015 hours (Geneva time) (Room C1, ITU Tower)     N/A  
  [ ADM 25 ]  - English - Word 2026-03-09 [08:19]  37'352  octets  
 
[ ADM 24 ]  2026-03-06 Chair, WP 7D   Draft agenda for the second Plenary meeting of Working Party 7D - Friday, 6 March 2026, at 1615 hours (Geneva time) (Room K, Montbrillant)     N/A  
  [ ADM 24 ] Revision 1 - English - Word 2026-03-06 [15:49]  35'227  octets  
 
[ ADM 23 ]  2026-03-05 Chairs, WP 7C & WG 7D-2   Draft agenda for the Joint Session of Working Groups 7D-2 and 7C-3 on WRC-27 agenda item 1.18 - Friday, 6 March 2026, from 0900 to 1015 hours (Geneva time) (Room C2, ITU Tower)     N/A  
  [ ADM 23 ]  - English - Word 2026-03-06 [15:43]  35'891  octets  
 
[ ADM 20 ]  2026-02-26 Chair, WP 7D   Draft agenda for the opening Plenary meeting of Working Party 7D - Monday, 2 March 2026, at 1115-1230 hours (Geneva time) (Room K, Montbrillant)     N/A  
  [ ADM 20 ] Revision 1 - English - Word 2026-03-02 [09:37]  33'593  octets  
 
[ ADM 21 ]  2026-02-26 Chair, WP 7D   Structure and input document assignment of Working Party 7D     N/A  
  [ ADM 21 ] Revision 1 - English - Word 2026-03-02 [08:54]  62'515  octets  
 
[ 284 ]  2026-03-02 BR, Study Groups Department   List of documents issued (Documents 7D/235 - 7D/284)     N/A  
  [ 284 ]  - English - Word 2026-03-02 [08:05]  46'268  octets  
 
[ ADM 22 ]  2026-02-26 Chair, SG 7 and Chairs, WPs 7A, 7B, 7C, 7D   Draft meeting schedule (Geneva, 2-13 March 2026)     N/A  
  [ ADM 22 ]  - English - Word 2026-02-26 [16:49]  50'908  octets  
 
[ INF 6 ]  2026-02-25 BR, Study Groups Department   Meetings of Study Group 7 and Working Parties 7A, 7B, 7C and 7D (Geneva, 2-13 March 2026)     N/A  
  [ INF 6 ] Part 1 - English -  PowerPoint 2007 2026-02-25 [14:23]  4'255'355  octets  
  [ INF 6 ]  - English - Word 2026-02-25 [14:23]  5'175'521  octets  
 
[ 276 ]  2026-02-18 United States   Preliminary draft new Report ITU-R RA.[IMT-6 GHZ] - Methods to address the determination of the coordination area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz     N/A  
  [ 276 ]  - English - Word 2026-02-20 [08:56]  14'919'213  octets  
 
[ 243 ]  2026-02-12 China   Proposals on modifications to preliminary draft new Report ITU-R RA.[IMT-6 GHZ] - Methods to address the determination of the coordination area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz     N/A  
  [ 243 ] Part 1 - English - Word 2026-02-13 [10:13]  14'908'319  octets  
  [ 243 ]  - English - Word 2026-02-13 [10:13]  14'694'581  octets  
 
[ 242 ]  2026-02-06 Committee on Radio Astronomy Frequencies   Preliminary draft new Report ITU-R RA.[IMT-6 GHZ] - Methods to address the determination of the coordination area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz     N/A  
  [ 242 ]  - English - Word 2026-02-06 [14:22]  16'616'364  octets  
 
[ 271 ]  2026-02-18 United States   Working document towards a preliminary draft new Report ITU-R RA.[SZM_THRESHOLDS] - Threshold levels of permissible interference to radio astronomy in the shielded zone of the Moon     N/A  
  [ 271 ]  - English - Word 2026-02-19 [16:59]  160'842  octets  
 
[ 250 ]  2026-02-17 South Africa   Studies on the new coexistence measures between non-GSO satellite systems and RAS stations in the specific Radio Quiet Zones supporting the Square Kilometre Array Observatory (SKAO) and the Atacama Large Millimeter/submillimeter Array (ALMA)     N/A  
  [ 250 ]  - English - Word 2026-02-18 [11:25]  3'435'489  octets  
 
[ 259 ]  2026-02-18 Committee on Radio Astronomy Frequencies , Square Kilometre Array Observatory (SKAO)   Working document towards a preliminary draft new Report ITU-R RA.[SZM-FAC] - Radio astronomy facilities on the Moon     N/A  
  [ 259 ]  - English - Word 2026-02-19 [11:58]  2'055'755  octets  
 
[ 260 ]  2026-02-18 Committee on Radio Astronomy Frequencies , Square Kilometre Array Observatory (SKAO)   Proposal for CPM Report based on compatibility studies under WRC-27 agenda item 1.16     AI1.16  
  [ 260 ]  - English - Word 2026-02-19 [11:51]  53'013  octets  
 
[ 261 ]  2026-02-18 Committee on Radio Astronomy Frequencies , Square Kilometre Array Observatory (SKAO)   Compatibility studies under WRC-27 agenda item 1.16     AI1.16  
  [ 261 ]  - English - Word 2026-02-19 [14:08]  4'529'503  octets  
 
[ 262 ]  2026-02-18 Committee on Radio Astronomy Frequencies , Square Kilometre Array Observatory (SKAO)   Compatibility studies under WRC-27 agenda item 1.18     AI1.18  
  [ 262 ]  - English - Word 2026-02-19 [12:29]  1'526'050  octets  
 
[ 263 ]  2026-02-18 Committee on Radio Astronomy Frequencies , Square Kilometre Array Observatory (SKAO)   Proposal for CPM Report based on compatibility studies under WRC-27 agenda item 1.18     AI1.18  
  [ 263 ]  - English - Word 2026-02-19 [12:37]  44'874  octets  
Résultats: 74 documents
Result Page:  1 - 2  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2026-04-15