International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7B : Meeting 2025-09-16 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7B  TD (2025-09-16) 

ITU-R R23-WP7B

Space Radiocommunication Applications

Meeting  from 2025-09-16 to 2025-09-25

held in Switzerland [Geneva]

Results:19 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 84 ]  
 
Proposal for update on the draft revision of the Handbook on Space research communication     WP 7B     2025-09-23
[ 83 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5B and 5C - Relevant technical information to support studies under WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2025-09-23
[ 82 ]  
 
Draft liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2025-09-23
[ 81 ]  
 
Annex XX to Working Party 7B Chair's Report - Working document towards preliminary draft CPM text for WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2025-09-23
[ 80 ]  
 
Annex x to Working Party 7B Chairman's Report - Review of Recommendations under the purview of Working Party 7B     WP 7B     2025-09-23
[ 79 ]  
 
Annex XX to Working Party 7B Chair's Report - Revised work plan for WRC-27 agenda item 1.15 and Resolution 680 (WRC-23)     SWG 7B-2   AI1.15   2025-09-23
[ 78 ]  
 
Annex XX to Working Party 7B Chair's Report - [Working document towards a]preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15     SWG 7B-2   AI1.15   2025-09-23
[ 77 ]  
 
Preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service and Earth exploration-satellite service systems in the 2 025-2 120 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies     SWG 7B-1     2025-09-22
[ 76 ]  
 
Working document toward preliminary draft new Report ITU-R SA.[FUTURE LUNAR COMMUNICATION AND SYSTEMS STUDY] - Radiocommunication needs for future lunar vicinity activities beyond space research and consideration of associated radiocommunication services and sufficiency of existing regulatory provisions     SWG 7B-2     2025-09-22
[ 75 ]  
 
Terms of Reference for Correspondence Group on the derivation of EESS link budgets to be used for the revision of Recommendation ITU-R SA.514     SWG 7B-3     2025-09-19
[ 74 ]  
 
[Working document towards a] preliminary draft new Report ITU-R SA.[EESS NGS 7-8GHZ] - Evolution of Earth exploration-satellite service systems in the frequency range 7 190 to 8 400 MHz     SWG 7B-3     2025-09-19
[ 73 ]  
 
Working document toward a preliminary draft revision of Recommendation ITU-R SA.514-3 - Interference and sharing criteria for command and data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services     SWB 7B-3     2025-09-18
[ 72 ]  
 
Working document in support of possible ITU-R SA.[EESS-DOWNLINKS-37.5 TO 52.4 GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz]     SWG 7B-3     2025-09-18
[ 71 ]  
 
Working document in support of possible report ITU-R SA.[EESS UPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band     SWG 7B-3     2025-09-18
[ 70 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing and compatibility studies     SWG 7B-3     2025-09-18
[ 69 ]  
 
Draft reply liaison statement to ITU-R Working Party 4C regarding calculations on overlaps between WRC-27 agenda items 1.11/1.13 and 1.15     WP 7B   AI1.15, AI1.13, AI1.11   2025-09-18
[ 68 ]  
 
Liaison statement to Working Party 4C - Amendment to technical information and request for clarification concerning studies on WRC-27 agenda item 1.13     SWG 7B-1   AI1.13   2025-09-17
[ 67 ]  
 
Draft reply liaison statement to Working Party 5D - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz     SWG 7B-1     2025-09-17
[ 66 ]  
 
Draft reply liaison statement to Working Party 4A - WRC-27 agenda item 1.2: Characteristics of space research service systems operating in the 13.75-14.0 GHz band     SWG 7B-1   AI1.2   2025-09-17
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-09-23