Numéro |
Date
|
Source
|
Titre
|
Questions
|
|
Numéro |
Mise à disposition |
Taille
|
|
|
|
[ 191 ]
|
2025-10-03 |
CCT
|
Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
|
N/A
|
|
[ 191 ] - English - Word |
2025-10-03 [16:03]
|
40'720 octets |
|
|
[ 189 ]
|
2025-09-11 |
Chair, WP 6A
|
Report of the meeting of Working Party 6A (Geneva, 2-10 September 2025)
|
N/A
|
|
[ 189 ] - English - Word |
2025-10-06 [11:04]
|
49'874 octets |
Chair's Report of the meeting of Working Party 6A (2 - 10 September 2025)
|
|
[ 189 ] Chapter 5 - English - Word |
2025-09-30 [08:49]
|
51'350 octets |
Meeting Report from Sub-Working Group 6A-5 (Other issues)
|
|
[ 189 ] Chapter 4 - English - Word |
2025-09-30 [08:44]
|
56'365 octets |
Meeting Report from Sub-Working Group 6A-3 (Protection)
|
|
[ 189 ] Chapter 3 - English - Word |
2025-09-30 [08:34]
|
55'433 octets |
Meeting Report from Sub-Working Group 6A-3 (WRC-27 agenda items and sharing)
|
|
[ 189 ] Chapter 2 - English - Word |
2025-09-30 [08:29]
|
52'579 octets |
Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)
|
|
[ 189 ] Chapter 1 - English - Word |
2025-09-30 [08:19]
|
75'538 octets |
Meeting Report from Sub-Working Group 6A-1 (Television)
|
|
[ 189 ] Chapter 1 - Annex 3 - English - Word |
2025-09-24 [08:09]
|
30'119'794 octets |
Preliminary draft revision of Report ITU-R BT.2140-14 - Transition from analogue to digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 1 - Annex 2 - English - Word |
2025-09-23 [16:48]
|
876'888 octets |
Preliminary draft revision of Report ITU-R BT.2485-3 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 3 - Annex 17 - English - Word |
2025-09-23 [16:35]
|
42'169 octets |
Note to the Director, Radiocommunication Bureau - Information on the frequency assignments to stations of terrestrial services other than broadcasting, recorded in the MIFR or in the process of being recorded, in the frequency bands between 470 MHz and 960 MHz
|
|
[ 189 ] Chapter 5 Annex 18 Part 1 - English - Excel 2007 |
2025-09-23 [16:31]
|
102'113 octets |
|
|
[ 189 ] Chapter 5 - Annex 18 - English - Word |
2025-09-23 [16:31]
|
142'612 octets |
Note from Working Party 6A to Radiocommunication Bureau (BR) - ITU ENG/PMSE database
|
|
[ 189 ] Chapter 1 - Annex 7 - English - Word |
2025-09-23 [16:09]
|
53'269 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.1306-8 - Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting
|
|
[ 189 ] Chapter 2 - Annex 14 - English - Word |
2025-09-23 [15:57]
|
21'301'796 octets |
Preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
|
|
[ 189 ] Chapter 1 - Annex 4 - English - Word |
2025-09-23 [15:41]
|
47'525 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.1368-13 - Planning criteria, including protection ratios, for digital terrestrial television
services in the VHF/UHF bands
|
|
[ 189 ] Chapter 3 - Annex 16 - English - Word |
2025-09-23 [15:32]
|
114'356 octets |
WRC-23 Resolutions related to broadcasting services and other services - Updated information of Document 6A/181, from Radiocommunication Bureau
|
|
[ 189 ] Chapter 3 - Annex 15 - English - Word |
2025-09-23 [14:34]
|
47'138 octets |
Annex to the Chair's Report - Continuation of Rapporteur Group to undertake WRC-27 studies related to Working Party 6A
|
|
[ 189 ] Chapter 2 - Annex 11 - Part 1 - English - Word |
2025-09-23 [14:18]
|
14'401'536 octets |
|
|
[ 189 ] Chapter 1 - Annex 9 - English - Word |
2025-09-23 [14:17]
|
43'563 octets |
Proposed revision to the Terms of Reference for the Working Party 6A Rapporteur Group to review Study Group 6 documentation on digital terrestrial broadcasting systems
|
|
[ 189 ] Chapter 1 - Annex 8 - English - Word |
2025-09-23 [14:16]
|
47'928 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R BT.2016-4 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
|
|
[ 189 ] Chapter 2 - Annex 11 - English - Word |
2025-09-23 [14:16]
|
12'533'805 octets |
Working document towards a preliminary draft revision of ITU-R Handbook - HF broadcasting system design
|
|
[ 189 ] Chapter 1 - Annex 10 - English - Word |
2025-09-23 [14:14]
|
43'324 octets |
Proposed continuation of the "Rapporteur Group on revision of ITU-R texts to include ATSC 3.0"
|
|
[ 189 ] Chapter 2 - Annex 13 - English - Word |
2025-09-23 [14:13]
|
61'246 octets |
Working document towards a preliminary revision of Recommendation ITU-R BS.774-4 - Service requirements for digital sound broadcasting to vehicular, portable and fixed receivers using terrestrial transmitters in the VHF/UHF bands
|
|
[ 189 ] Chapter 2 - Annex 12 - English - Word |
2025-09-23 [13:46]
|
42'519 octets |
Terms of Reference for Rapporteur Group on the revision of the Handbook "HF Broadcasting System Design"
|
|
[ 189 ] Chapter 1 - Annex 6 - English - Word |
2025-09-23 [13:22]
|
103'679 octets |
Preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems
|
|
[ 189 ] Chapter 1 - Annex 5 - English - Word |
2025-09-23 [11:57]
|
1'855'643 octets |
Preliminary draft revision of Report ITU-R BT.2343-10 - Collection of field trials of ultra high definition television over digital terrestrial television broadcasting networks
|
|
[ 189 ] Chapter 1 - Annex 1 - English - Word |
2025-09-23 [10:41]
|
47'782 octets |
Preliminary draft revision of Report ITU-R BT.2386-5 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)
|
|
[ INF 2 ]
|
2024-07-05 |
Interim Chair, SG 6
|
Functions of the Study Group 6 Vice-Chairs and Working Parties Chairs
|
N/A
|
|
[ INF 2 ] Revision 4 - English - Word |
2025-09-26 [11:22]
|
60'164 octets |
|
|
[ 190 ]
|
2025-09-25 |
WP 6B
|
Reply liaison statement to Working Party 6A - Review of DTB documentation within the remit of Working Party 6B
|
N/A
|
|
[ 190 ] - English - Word |
2025-09-26 [11:26]
|
46'383 octets |
|
|
[ ADM 29 ]
|
2025-09-10 |
SG 6 & Wps 6A, 6B & 6C
|
Provisional schedules of 2026/2027 meetings of
Study Group 6 and its Working Parties
|
N/A
|
|
[ ADM 29 ] Revision 1 - English - Word |
2025-09-11 [10:55]
|
34'364 octets |
|
|
[ 188 ]
|
2025-09-11 |
Director, BR
|
Final list of participants - Working Party 6A (Geneva, 2-10 September 2025)
|
N/A
|
|
[ 188 ] - English - PDF (acrobat) |
2025-09-11 [08:16]
|
150'648 octets |
|
|
[ ADM 30 ]
|
2025-09-10 |
Chair, WP 6A
|
Draft agenda for the closing Plenary meeting of Working Party 6A - Wednesday, 10 September 2025, from 1400 to 1515 and from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation)
(Room Popov, Tower)
|
N/A
|
|
[ ADM 30 ] Revision 1 - English - Word |
2025-09-10 [13:23]
|
42'042 octets |
|
|
[ ADM 28 ]
|
2025-09-09 |
Chair, WP 6A
|
Draft Agenda for the Third Plenary Meeting of Working Party 6A - Tuesday, 9 September 2025, from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation)
(Room Popov, Tower)
|
N/A
|
|
[ ADM 28 ] - English - Word |
2025-09-09 [13:43]
|
39'542 octets |
|
|
[ ADM 23 ]
|
2025-08-28 |
SG 6, WPs 6A, 6B & 6C
|
Tentative schedule for Working Parties 6A, 6B and 6C, and Study Group 6
|
N/A
|
|
[ ADM 23 ] Revision 4 - English - Word |
2025-09-08 [10:36]
|
47'499 octets |
|
|
[ ADM 25 ]
|
2025-08-29 |
Chair, WP 6A
|
Work structure and assignment of documents
|
N/A
|
|
[ ADM 25 ] Revision 3 - English - Word |
2025-09-05 [12:00]
|
37'064 octets |
|
|
[ ADM 27 ]
|
2025-09-05 |
Chair, WP 6A
|
Draft agenda for the second Plenary meeting of Working Party 6A Friday, 5 September 2025, 1045-1110 hours (Geneva time)
(Room H, Montbrillant)
|
N/A
|
|
[ ADM 27 ] - English - Word |
2025-09-05 [10:00]
|
33'765 octets |
|
|
[ 187 ]
|
2025-09-01 |
BR, Study Groups Department
|
List of documents issued (Documents 6A/140 - 6A/187)
|
N/A
|
|
[ 187 ] - English - Word |
2025-09-01 [09:04]
|
43'691 octets |
|
|
[ 186 ]
|
2025-09-01 |
RG on SAB/SAP Issues
|
Report for Working Party 6A block meeting of September 2025
|
N/A
|
|
[ 186 ] Part 1 - English - Excel 2007 |
2025-09-01 [09:08]
|
102'076 octets |
|
|
[ 186 ] - English - Word |
2025-09-01 [09:08]
|
139'734 octets |
|
|
[ ADM 26 ]
|
2025-08-29 |
Chair, WP 6A
|
Draft agenda for the first Plenary meeting of Working Party 6A - Tuesday, 2 September 2025, 0930 to 1045 hours (Geneva time) (Physical meeting with remote participation) (Room H, Montbrillant)
|
N/A
|
|
[ ADM 26 ] Revision 1 - English - Word |
2025-09-01 [08:52]
|
40'766 octets |
|
|
[ ADM 24 ]
|
2025-08-29 |
Interim Chair, SG 6
|
Proposed treatment of contributions submitted to multiple Working Parties
|
N/A
|
|
[ ADM 24 ] - English - Word |
2025-08-29 [15:41]
|
37'664 octets |
|
|
[ 185 ]
|
2025-08-29 |
Interim Chair, SG 6
|
Compiled Reports of the Study Group 6 Liaison Rapporteurs
|
N/A
|
|
[ 185 ] Part 4 - English - Word |
2025-08-29 [10:49]
|
58'418 octets |
|
|
[ 185 ] Part 3 - English - Word |
2025-08-29 [10:49]
|
48'600 octets |
|
|
[ 185 ] Part 2 - English - Word |
2025-08-29 [10:48]
|
45'075 octets |
|
|
[ 185 ] Part 1 - English - Word |
2025-08-29 [10:48]
|
469'977 octets |
|
|
[ 185 ] - English - Word |
2025-08-29 [10:48]
|
655'615 octets |
|
|
[ INF 6 ]
|
2025-08-26 |
BR, Study Groups Department
|
Guidelines on the management of fully virtual meetings and
physical meetings with remote participation
|
N/A
|
|
[ INF 6 ] - English - Word |
2025-08-27 [09:36]
|
43'683 octets |
|
|
[ INF 5 ]
|
2025-08-26 |
BR Study Groups Department
|
Meetings of Working Parties 6A, 6B and 6C, and Study Group 6 (Geneva, 1-12 September 2025)
|
N/A
|
|
[ INF 5 ] Part 1 - English - PowerPoint 2007 |
2025-08-26 [16:05]
|
4'450'148 octets |
|
|
[ INF 5 ] - English - Word |
2025-08-26 [16:05]
|
5'178'714 octets |
|
|
[ 184 ]
|
2025-08-25 |
RG-FOB
|
Rapporteur Group - Future of Broadcasting Progress Report March to August 2025 (copy to Working Parties 6A, 6B and 6C)
|
N/A
|
|
[ 184 ] - English - Word |
2025-08-25 [17:07]
|
39'582 octets |
|
Résultats: 91 documents
Result Page:
1 -
2
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):