|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
3666132 bytes |
2026-07-02 |
[1394] Chapter 7
- General matters |
| |
Word
|
37363 bytes |
2026-06-26 |
[1394] Chapter 6
- Meeting Report of Ad Hoc Work plan |
| |
Word
|
41264 bytes |
2026-06-29 |
[1394] Chapter 5
- Meeting Report of Working Group Technology Aspects |
| |
Word
|
39064 bytes |
2026-06-25 |
[1394] Chapter 5 - Annex 5.1
- Meeting Report of Sub-Working Group Evaluation |
| |
Word
|
40068 bytes |
2026-06-25 |
[1394] Chapter 5 - Annex 5.2
- Meeting Report of Sub-Working Group IMT Specifications |
| |
Word
|
38295 bytes |
2026-06-26 |
[1394] Chapter 5 - Annex 5.3
- Meeting Report of Sub-Working Group Coordination |
| |
Word
|
179406 bytes |
2026-06-26 |
[1394] Chapter 5 - Annex 5.4
- Working document towards a preliminary draft revision of document IMT-2030/2 "Process" - Submission, evaluation process and consensus building for IMT-2030 |
| |
Word
|
190928 bytes |
2026-06-26 |
[1394] Chapter 5 - Annex 5.5
- Preliminary draft new Report ITU-R M.[IMT-2030.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT-2030 |
| |
Word
|
105008 bytes |
2026-06-29 |
[1394] Chapter 5 - Annex 5.6
- Information on ITU-R Working Party 5D Workshop on IMT-2030 |
| |
Word
|
55267 bytes |
2026-06-26 |
[1394] Chapter 4
- Meeting Report of Working Group Spectrum Aspects and WRC preparations |
| |
Word
|
165492 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.1
- Meeting Report of Sub-Working Group WRC-27 agenda item 1.7 |
| |
Word
|
164077 bytes |
2026-07-01 |
[1394] Chapter 4 - Annex 4.2
- Elements of a working document towards preliminary draft CPM text for WRC-27 agenda item 1.7 |
| |
Word
|
115996 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.3
- Sharing and compatibility studies under WRC-27 agenda item 1.7 - Main Part |
| |
Word
|
43165 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.4
- Annex 1 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 4 400-4 800 MHz under WRC-27 agenda item 1.7 |
| |
Word
|
12499159 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.5
- Annex 1 - Attachment 1 - Sharing between the fixed service and IMT operating in the frequency band 4 400-4 800 MHz |
| |
Word
|
14766027 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.6
- Annex 1 - Attachment 2 - Sharing between the aeronautical mobile service and IMT operating in the frequency band 4 400-4 800 MHz
|
| |
Word
|
247052 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.7
- Annex 1 - Attachment 3 - Sharing between the maritime mobile service and IMT operating in the frequency band 4 400-4 800 MHz |
| |
Word
|
9982882 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.8
- Annex 1 - Attachment 4 - Sharing between the fixed satellite service (space-to-Earth) (RR No. 5.441) in allotments in the RR Appendix 30B Plan, assignments in the RR Appendix 30B List, conversions of an allotment into an assignment, Article 7 requests transferred to Article 6 of RR Appendix 30B, submissions in accordance with Resolution 170 (Rev.WRC-23) and ... |
| |
Word
|
44224 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.9
- Annex 1 - Attachment 5 - Compatibility of the aeronautical mobile (R) service (RR No. 5.436) operating in the frequency band 4 200-4 400 MHz and IMT operating in the frequency band 4 400-4 800 MHz |
| |
Word
|
37210740 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.10
- Annex 1 - Attachment 6 - Compatibility of the aeronautical radionavigation service (RR No. 5.438) operating in the frequency band 4 200-4 400 MHz and IMT operating in the frequency band 4 400-4 800 MHz |
| |
Word
|
1775908 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.11
- Annex 2 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 7 125-8 400 MHz under WRC-27 agenda item 1.7 |
| |
Word
|
27025124 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.12
- Annex 2 - Attachment 1 - Sharing between the fixed service and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
10435875 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.13
- Annex 2 - Attachment 2 - Sharing between the space research service (Earth-to-space) in the frequency band 7 145-7 235 MHz and IMT operating in the frequency band 7 125-8 400 MHZ |
| |
Word
|
4168142 bytes |
2026-06-25 |
[1394] Chapter 4 - Annex 4.14
- Annex 2 - Attachment 3 - Sharing between the space operation service (Earth-to-space) (see No. 5.459) in the frequency bands 7 100-7 155 MHz and 7 190-7 250 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
41960593 bytes |
2026-07-02 |
[1394] Chapter 4 - Annex 4.15
- Annex 2 - Attachment 4 - Sharing between the fixed satellite service (space-to-Earth) in the frequency band 7 250-7 750 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
49686602 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.16
- Annex 2 - Attachment 5 - Sharing between the fixed satellite service (Earth-to-space) in the frequency band 7 900-8 400 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
20240771 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.17
- Annex 2 - Attachment 6 - Sharing between the mobile satellite service (space-to-Earth) (see No. 5.461) in the frequency band 7 250-7 375 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
31039403 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.18
- Annex 2 - Attachment 7 - Sharing between the mobile satellite service (Earth-to-space) in the frequency band 7 900-8 025 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
28081834 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.19
- Annex 2 - Attachment 8 - Sharing between the meteorological satellite service (space-to-Earth) in the frequency bands 7 450-7 550 MHz and 7 750-7 900 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
2855134 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.20
- Annex 2 - Attachment 9 - Sharing between the meteorological satellite service (Earth-to-space) in the frequency band 8 175-8 215 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
43221156 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.21
- Annex 2 - Attachment 10 - Sharing between the Earth exploration satellite service (space-to-Earth) in the frequency band 8 025-8 400 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
17685358 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.22
- Annex 2 - Attachment 11 - Compatibility of the space research service (space-to-Earth) operating in the frequency band 8 400-8 500 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
6166675 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.23
- Annex 2 - Attachment 12 - Compatibility of the Earth exploration satellite service (Earth-to-space) operating in the frequency band 7 190-7 250 MHz and IMT operating in the frequency band 7 125-8 400 MHz |
| |
Word
|
4581934 bytes |
2026-07-02 |
[1394] Chapter 4 - Annex 4.24
- Annex 2 - Attachment 13 - Sharing between the maritime mobile satellite service (space-to-Earth) in the
frequency band 7 375-7 750 MHz and IMT operating in the
frequency band 7 125-8 400 MHz
|
| |
Word
|
58087888 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.25
- Annex 2 - Attachment 14 - Sharing and compatibility studies on potential interference from incumbent services into IMT in the frequency range 7 125-8 400 MHz |
| |
Word
|
44998 bytes |
2026-06-26 |
[1394] Chapter 4 - Annex 4.26
- Annex 3 - Sharing and compatibility studies between services to which the band is currently allocated and IMT
systems in the frequency band 14.8-15.35 GHZ
under WRC-27 agenda item 1.7
|
| |
Word
|
6649854 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.27
- Annex 3 - Attachment 1 - Sharing between the fixed service and IMT operating in the
frequency band 14.8-15.35 GHz
|
| |
Word
|
6734093 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.28
- Annex 3 - Attachment 2 - Sharing between the aeronautical mobile service and IMT operating in the frequency band 14.8-15.35 GHz |
| |
Word
|
3873908 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.29
- Annex 3 - Attachment 3 - Sharing between the space research service (see RR No. 5.510A) and IMT
operating in the frequency band 14.8-15.35 GHz
|
| |
Word
|
3269970 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.30
- Annex 3 - Attachment 4 - Compatibility of the radio astronomy service in the frequency band 15.35-15.4 GHz and IMT operating in the frequency band 14.8-15.35 GHz |
| |
Word
|
1985398 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.31
- Annex 4 - Sharing and compatibility studies under WRC-27 agenda item 1.7 |
| |
Word
|
38869 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.32
- Meeting Report of Sub-Working Group IMT-MSS |
| |
Excel 2007
|
73416 bytes |
2026-06-29 |
[1394] Chapter 4 Annex 4.33 Part 2
|
| |
Excel 2007
|
20271 bytes |
2026-06-29 |
[1394] Chapter 4 Annex 4.33 Part 1
|
| |
Word
|
55128902 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.33
- Working document on studies for the regulatory considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13 |
| |
Excel 2007
|
80086 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.34 - Part 2
|
| |
Excel 2007
|
26816 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.34 - Part 1
|
| |
Word
|
159170 bytes |
2026-06-29 |
[1394] Chapter 4 - Annex 4.34
- Elements for future liaison statement from Working Party 5D to Working Party 4C on WRC-27 agenda item 1.13 |
| |
Word
|
173573 bytes |
2026-06-25 |
[1394] Chapter 3
- Meeting Report of Working Group General Aspects |
| |
Word
|
62415 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.1
- Meeting Report of Sub-Working Group Specific Applications |
| |
Word
|
2686078 bytes |
2026-06-24 |
[1394] Chapter 3 - Annex 3.2
- Working document towards a preliminary draft revision of Report ITU-R M.2291-2 - The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications |
| |
Word
|
4927384 bytes |
2026-06-24 |
[1394] Chapter 3 - Annex 3.3
- Working document towards a preliminary draft revision of Report ITU-R M.2528-0 - Capabilities of the terrestrial component of IMT-2020
for multimedia communications
|
| |
Word
|
1805761 bytes |
2026-06-24 |
[1394] Chapter 3 - Annex 3.4
- Working document towards a preliminary draft new Report ITU-R M.[IMT.ATG] - Systems for non-safety air-ground communications (excluding UAS) using terrestrial IMT and other land mobile technologies |
| |
Word
|
17202305 bytes |
2026-06-26 |
[1394] Chapter 3 - Annex 3.5
- Preliminary draft revision of Report ITU-R M.2527-0 - Applications of the terrestrial component of International Mobile Telecommunications for specific societal, industrial and other usages |
| |
Word
|
56061 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.6
- Meeting Report of Sub-Working Group National Experiences |
| |
Word
|
4375968 bytes |
2026-06-26 |
[1394] Chapter 3 - Annex 3.7
- Preliminary draft revision of Report ITU-R M.2480-1 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT |
| |
Word
|
54958 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.8
- Working document towards a preliminary draft new Report ITU-R M.[IMT-FWA] [Technical and operational aspects of providing broadband by fixed wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT] or [Technical and operational aspects of fixed broadband wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT] |
| |
Word
|
54781 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.9
- Meeting Report of Sub-Working Group Circular |
| |
Word
|
49443 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.10
- Meeting Report of Sub-Working Group RA-27 Preparations |
| |
Word
|
61718 bytes |
2026-06-25 |
[1394] Chapter 3 - Annex 3.11
- Scope of Sub-Working Group RA-27 Preparations |
| |
Word
|
482285 bytes |
2026-06-24 |
[1394] Chapter 2
- Working Party 5D structure and work plan |
| |
Word
|
47292 bytes |
2026-07-02 |
[1394] Chapter 2 - Annex 2.9.1
- Work plan for revision of Report ITU-R M.2291-2 - The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications |
| |
Word
|
36894 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.2
- Work plan for revision of Report ITU-R M.2528-0 - Capabilities of the terrestrial component of IMT-2020 for multimedia communications |
| |
Word
|
37995 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.3
- Work plan for the development of preliminary draft new Report ITU-R M.[IMT.ATG] - Systems for non-safety air-ground communications (excluding UAS) using terrestrial IMT and other land mobile technologies |
| |
Word
|
38335 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.4
- Work plan for revision of Report ITU-R M.2527-0 - Applications of the terrestrial component of IMT for specific societal, industrial and other usages |
| |
Word
|
54156 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.5
- Work plan for the development of preliminary draft new Report ITU-R M.[IMT-FWA] - [Technical and operational aspects of providing broadband by fixed wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT] or [Technical and operational aspects of fixed broadband wireless access using IMT technology (IMT-FWA) in the frequency bands identified for IMT] |
| |
Word
|
56652 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.6
- Work plan for the revision of Report ITU-R M.2480-1 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT |
| |
Word
|
40577 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.7
- Work plan for IMT-2030 Circular Letter and its Addenda |
| |
Word
|
53936 bytes |
2026-06-25 |
[1394] Chapter 2 - Annex 2.9.8
- Work plan for the review of existing ITU-R Resolutions, Questions and Opinion |
| |
Word
|
157163 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.9
- Work plan for WRC-27 agenda item 1.7 |
| |
Word
|
39392 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.10
- Work plan for a draft revision of Recommendation ITU-R M.2012-7 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced) |
| |
Word
|
40598 bytes |
2026-06-23 |
[1394] Chapter 2 - Annex 2.9.11
- Work plan for a draft revision of Recommendation ITU-R M.2150-3 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020) |
| |
Word
|
54970 bytes |
2026-06-24 |
[1394] Chapter 2 - Annex 2.9.12
- Work plan for the development of Document IMT-2030/2 "Process" - Submission, evaluation process and consensus building for IMT-2030 |
| |
Word
|
37151 bytes |
2026-06-24 |
[1394] Chapter 2 - Annex 2.9.13
- Work plan for development of the draft new Report ITU-R M.[IMT-2030.SUBMISSION] - Requirements, evaluation criteria and submission templates for the development of IMT 2030 |
| |
Word
|
178690 bytes |
2026-06-29 |
[1394] Chapter 1
- Report on the 52nd meeting of Working Party 5D (Geneva, 27 May - 5 June 2026) |
| |
Excel 2007
|
16457 bytes |
2026-07-02 |
[1394] Chapter 1 - Annex 1.1
- Index of Chapters and Annexes of the Report of Working Party 5D Meeting No. 52 |
|
|