Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP5C Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP5C Documentos de la reunión
  Número máximo de documentos/página:
Resultados: 32 documentos
Número  Fecha Origen Título
  Número  Puesta a disposición Tamaño  
 
[ 277 ]  2026-01-27 Director, BR   Further information on the use of the Conference Proposal Interface (CPI) for the preparation of examples of regulatory texts for the draft CPM Report to WRC-27    
  [ 277 ] Part 2 - English -  PDF (acrobat) 2026-01-27 [10:44]  660'340  octetos  
  [ 277 ] Part 1 - English -  PDF (acrobat) 2026-01-27 [10:44]  1'646'802  octetos  
  [ 277 ]  - English -  Word 2026-01-27 [10:44]  5'181'472  octetos  
 
[ 276 ]  2026-01-20 CCT   Reply liaison statement to ITU-R Working Party 5A (copy to ITU-R Working Parties 5C and 6A for information) - Validation of terms and definitions contained in Report ITU-R M.2563-0    
  [ 276 ]  - English -  Word 2026-01-20 [14:45]  35'682  octetos  
 
[ 275 ]  2026-01-20 CCT   Reply liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15) - Validation of the terms "mesh network" and "multiple-input and multiple-output (MIMO)"    
  [ 275 ]  - English -  Word 2026-01-20 [15:05]  42'158  octetos  
 
[ 274 ]  2026-01-15 Sweden   Typical FS link values for inclusion in the preliminary draft revision of Recommendation ITU-R F.2086-0 - Deployment scenarios for point-to-point systems in the fixed service    
  [ 274 ]  - English -  Word 2026-01-16 [09:18]  46'450  octetos  
 
[ 271 ]  2025-11-28 Chair, WP 5C   Report on the thirty third meeting of Working Party 5C (Geneva, 17-28 November 2025)    
  [ 271 ] Annex 1.7 - English -  Word 2026-01-06 [09:38]  153'687  octetos Working document towards preliminary draft new Report ITU-R F.[OPPORTUNISTIC_WEATHER_MONITORING] - Fixed wireless link performance data collection for opportunistic weather monitoring  
  [ 271 ]  - English -  Word 2025-12-23 [16:04]  130'630  octetos Report of the thirty third meeting of Working Party 5C - (Geneva, Switzerland, 17-28 November 2025)  
  [ 271 ] Annex 5 - English -  Word 2025-12-16 [15:49]  72'047  octetos General matters - Summary of documents addressed  
  [ 271 ] Annex 2.4 - Part 4 - English -  Word 2025-12-05 [15:43]  27'003  octetos  
  [ 271 ] Annex 2.4 - Part 3 - English -  Word 2025-12-05 [15:42]  95'272  octetos  
  [ 271 ] Annex 2.4 - Part 2 - English -  Word 2025-12-05 [15:41]  3'945'551  octetos  
  [ 271 ] Annex 2.4 - Part 1 - English -  Word 2025-12-05 [15:40]  4'693'429  octetos  
  [ 271 ] Annex 2.4 - English -  Word 2025-12-05 [15:33]  19'139'758  octetos Working document on sharing studies under WRC-27 agenda item 1.10  
  [ 271 ] Annex 2 - English -  Word 2025-12-05 [12:15]  47'050  octetos Meeting report of Working Group 5C-2 - Sharing, compatibility aspects and WRCs issues  
  [ 271 ] Annex 2.2 - English -  Word 2025-12-04 [16:44]  3'266'783  octetos Working document towards a preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz  
  [ 271 ] Annex 3 - English -  Word 2025-12-04 [13:17]  44'472  octetos Meeting Report of Working Group 5C-3 - WG General Aspects and HF Systems  
  [ 271 ] Annex 3.3 - English -  Word 2025-12-04 [11:45]  40'875  octetos Working Party 5C activities and studies on sustainable digital transformation  
  [ 271 ] Annex 3.2 - English -  Word 2025-12-04 [11:06]  34'684  octetos Report on ITU-R Workshop on Fixed Wireless Systems  
  [ 271 ] Annex 3.1 - English -  Word 2025-12-04 [11:00]  35'904  octetos Terms of Reference of the Working Party 5C - Correspondence Group on developing new draft ITU Handbook on Fixed Wireless Systems  
  [ 271 ] Annex 4 - English -  Word 2025-12-04 [10:50]  61'545  octetos Detailed work plans for individual deliverables  
  [ 271 ] Annex 2.3 - English -  Word 2025-12-04 [10:31]  65'432  octetos Working document towards draft CPM text on WRC-27 agenda item 1.10  
  [ 271 ] Annex 2.1 - English -  Word 2025-12-04 [09:57]  7'436'984  octetos Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz  
  [ 271 ] Annex 1 - English -  Word 2025-12-03 [11:50]  64'189  octetos Meeting Report of Working Group 5C-1 - Spectrum, applications and technology aspects  
  [ 271 ] Annex 1.6 - English -  Word 2025-12-03 [11:48]  260'248  octetos Working document towards a preliminary draft revision of Recommendation ITU-R F.746-11 - Radio-frequency arrangements for fixed service systems  
  [ 271 ] Annex 1.1 - English -  Word 2025-12-03 [11:31]  4'073'558  octetos Preliminary draft revision of Report ITU-R F.2416-1 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz  
  [ 271 ] Annex 1.5 - English -  Word 2025-12-03 [09:57]  90'342  octetos Preliminary draft revision of Recommendation ITU-R F.2086-0 - Deployment scenarios for point-to-point systems in the fixed service  
  [ 271 ] Annex 1.3 - English -  Word 2025-12-03 [09:52]  11'637'697  octetos Preliminary draft revision of Report ITU-R F.2323-2 - Fixed service use and future trends  
  [ 271 ] Annex 1.2 - English -  Word 2025-12-03 [09:50]  1'557'050  octetos Working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-700 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-700 GHz  
  [ 271 ] Annex 1.4 - English -  Word 2025-12-03 [09:32]  34'459  octetos Draft proposed suppression of Recommendation ITU-R F.2004 - Radio-frequency channel arrangements for fixed service systems operating in the 92-95 GHz range  
 
[ 273 ]  2025-12-08 WP 5A   Reply liaison statement to CCT (copy to ITU-T Study Groups 5, 13 and 15 and ITU-R Working Parties 4A, 4B, 4C, 5C, 5D, and 6A for information) - Terminology "multiple-input and multiple-output (MIMO)" and "mesh networks"    
  [ 273 ]  - English -  Word 2025-12-08 [14:39]  50'944  octetos  
 
[ 272 ]  2025-12-05 WP 5A   Reply liaison statement to Coordination Committee for Technology (CCT) (copy to ITU-R Working Parties 5C and 6A for information) - Editorial comments on terms and definitions submitted by ITU-R Working Party 5A and included in preliminary draft new Report ITU-R M.[Audio-PMSE_LMS]    
  [ 272 ]  - English -  Word 2025-12-05 [15:16]  48'935  octetos  
Resultados: 32 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML Si  
Formatos doc pdf zip  + Otros formatos
Idiomas (máximo 2) E F S A C R  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2026-02-04