Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 197 ]
|
Draft liaison statement to ITU-R Working Parties 5A and 5C - Technical and operational characteristics in the frequency range 275 GHz to 450 GHz
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
|
|
2025-04-29 |
|
[ 196 ]
|
Draft liaison statement to ITU-R Working Party 5C - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-1 000 GHz
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
|
|
2025-04-29 |
|
[ 195 ]
|
Short-term protection criteria of the fixed service in WRC-27 agenda item 1.10
|
Japan
|
AI1.10
|
2025-04-30 |
|
[ 194 ]
|
Proposed modifications to a working document towards a preliminary draft revision of Report ITU-R F.2323-2 - Fixed service use and future trends
|
Japan
|
|
2025-04-30 |
|
[ 193 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-1 000 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-1 000 GHz
|
Japan
|
Q257-2/5
|
2025-04-30 |
|
[ 192 ]
|
Proposal of a draft liaison statement to APT wireless group (AWG) - Working document in the frequency range 450-700 GHz
|
Japan
|
|
2025-04-30 |
|
[ 191 ]
|
Activity report of Correspondence Group on developing a new version of the ITU Handbook on digital radio-relay systems
|
CG on developing new version ITU Handbook on digital radio-relay systems
|
|
2025-04-30 |
|
[ 190 ]
|
Liaison statement to ITU-R Working Party 5C - Technical and operational characteristics of fixed service applications operating in the frequency range 450-1 000 GHz
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
|
|
2025-04-30 |
|
[ 189 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C - Technical and operational characteristics in the frequency range 275-450 GHz
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
|
|
2025-04-30 |
|
[ 188 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10
|
United States
|
AI1.10
|
2025-04-29 |
|
[ 187 ]
|
Preliminary draft revision to Recommendation ITU-R F.1821 - Characteristics of advanced digital high frequency (HF) radiocommunication systems
|
United States
|
|
2025-04-29 |
|
[ 186 ]
|
Preliminary draft revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems
|
United States
|
|
2025-04-29 |
|
[ 185 ]
|
Preliminary draft new Report ITU-R F.[EESS-PROTECTION] - Relevant technical information for sharing studies under WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2025-04-29 |
|
[ 184 ]
|
Elevation of preliminary draft new Recommendations ITU-R F.[D-BAND] and F.[W-BAND]
|
United States
|
|
2025-04-29 |
|
[ 183 ]
|
Methodology and preliminary study on non-GSO downlink sharing with FS in WRC-27 agenda item 1.10
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Deutsche Telekom AG
,
Huawei Technologies Co., Ltd.
,
Nokia Corporation
,
Vodafone Group Services Ltd
|
AI1.10
|
2025-04-29 |
|
[ 182 ]
|
Working document towards preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
|
France
|
|
2025-04-28 |
|
[ 181 ]
|
Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
|
France
|
|
2025-04-28 |
|
[ 180 ]
|
Various deliverables on frequency bands D and W
|
France
|
|
2025-04-28 |
|
[ 179 ]
|
Working document on sharing studies under WRC-27 agenda item 1.10 - Studies on potential pfd mask to be applied to GSO and non-GSO FSS constellations operating in the 71-76 GHz band and the importance of considering atmospheric attenuation at these high frequency bands
|
Tonga
|
AI1.10
|
2025-04-29 |
|
[ 178 ]
|
Working document towards a preliminary draft new Recommendation ITU-R F.[OPPORTUNISTIC_WEATHER_MONITORING] - Microwave link performance data sharing and collection for opportunistic weather monitoring
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria
|
|
2025-04-28 |
|
[ 177 ]
|
Short-term protection criteria of FS in WRC-27 agenda item 1.10
|
China
|
AI1.10
|
2025-04-28 |
|
[ 176 ]
|
Proposal to update Report ITU-R F.2323-2 with full duplex field test
|
China
|
|
2025-04-28 |
|
[ 175 ]
|
Reply-liaison statement from ETSI ISG THZ to ITU-R Working Party 5C
|
ETSI ISG THz
|
|
2025-04-25 |
|
[ 174 ]
|
Revision to Recommendation ITU-R F.1821 - Characteristics of advanced digital high frequency (HF) radiocommunication systems
|
ATDI
|
Q257/5, Q110/5
|
2025-04-28 |
|
[ 173 ]
|
Revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems
|
ATDI
|
Q258/5, Q246/5
|
2025-04-28 |
|
[ 172 ]
|
Preliminary draft revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems
|
France
|
|
2025-04-27 |
|
[ 171 ]
|
Preliminary draft revision to Recommendation ITU-R F.1821 - Characteristics of advanced digital high frequency (HF) radiocommunication systems
|
France
|
|
2025-04-27 |
|
[ 170 ]
|
Proposed modifications to working document on sharing studies under WRC-27 agenda item 1.10
|
Canada
|
AI1.10
|
2025-04-25 |
|
[ 169 ]
|
Revision of Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
|
ATDI
|
Q257-2/5, Q110-3/5
|
2025-04-23 |
|
[ 168 ]
|
Proposals on working document on sharing studies under WRC-27 agenda item 1.10
|
Russian Federation
|
AI1.10
|
2025-04-15 |
|
[ 167 ]
|
Short-term protection criterion for stations in the fixed service in the bands 71-76 GHz and 81-86 GHz
|
United Kingdom
|
AI1.10
|
2025-04-11 |
|
[ 166 ]
|
Assessment of candidate pfd masks in studies under WRC-27 agenda item 1.10
|
United Kingdom
|
AI1.10
|
2025-04-11 |
|
[ 165 ]
|
Liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
|
2025-04-11 |
|
[ 164 ]
|
Reply liaison statement to ITU-R Working Party 5C regarding APT Report on THz fixed wireless systems operating in 450-700 GHz
|
Asia-Pacific Telecommunity
|
|
2025-04-09 |
|
[ 163 ]
|
Liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
ITU-T SG15
|
|
2025-04-08 |
|
[ 162 ]
|
Liaison statement to Working Party 5C on WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2025-04-08 |
|
[ 161 ]
|
Preliminary position on WRC-27 agenda - Preliminary WMO position on the World Radiocommunication Conference 2027 (WRC-27) agenda
|
World Meteorological Organization
|
|
2025-04-07 |
|
[ 160 ]
|
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2025-04-01 |
|
[ 159 ]
|
Reply liaison statement to ITU-R Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 7B answers to questions related to WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2025-02-25 |
|
[ 158 ]
|
Reply liaison statement to Working Party 5C - Coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz
|
WP 5D
|
|
2025-02-20 |
|
[ 157 ]
|
PMSE (SAB/SAP) spectrum allocations in the United Kingdom
|
United Kingdom
|
|
2025-02-10 |
|
[ 156 ]
|
Additional information on the preparation of texts for the draft CPM Report to WRC-27
|
Director, BR
|
|
2025-01-30 |
|
[ 155 ]
|
Liaison statement to key SDOs on the publication of GR THz 003 and GR THz 004
|
ETSI ISG THz
|
|
2025-01-23 |
|
[ 154 ]
|
Liaison statement to Working Party 5C - Studies under WRC-27 agenda item 1.10
|
WP 5A
|
AI1.10
|
2024-12-11 |
|
[ 153 ]
|
Liaison statement to Working Parties 1B, 5C and 6A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
|
WP 5A
|
|
2024-12-11 |
|
[ 152 ]
+Ann.1-5 |
Report on the thirty first meeting of Working Party 5C (Geneva, 19-28 November 2024)
|
Chair, WP 5C
|
|
2024-11-28 |
|
[ 151 ]
|
Final list of participants - Working Party 5C (Geneva, 19-28 November 2024)
|
Director, BR
|
|
2024-11-28 |
|
[ 150 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG1 - Q3/1
|
|
2024-11-27 |
|
[ 149 ]
|
Liaison statement to Working Party 5C - Studies under WRC-27 agenda item 1.10
|
WP 5B
|
AI1.10
|
2024-11-27 |
|
[ 148 ]
|
Information on characteristics of FSS and MSS networks or systems as currently contained in BR IFIC required for studies under WRC-27 agenda item 1.10
|
Director, BR
|
AI1.10
|
2024-11-26 |
Results:197 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):