Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 317 ]
|
Proposed modification to Report ITU-R M.2377-2 - Radiocommunication objectives and requirements for public protection and disaster relief
|
Korea (Rep. of)
|
|
2025-11-05 |
|
[ 316 ]
|
Proposed working document towards a preliminary draft new Report ITU-R M.[JCAS] - Joint communication and sensing for ITS, CAV and future applications
|
Korea (Rep. of)
|
Q264/5
|
2025-11-05 |
|
[ 315 ]
|
Proposed working document towards a preliminary draft new Report ITU-R M.[FUTURE-ITS] - Studies related to Question ITU-R 264/5
|
Korea (Rep. of)
|
Q264/5
|
2025-11-05 |
|
[ 314 ]
|
Working document towards a preliminary new draft report on experimental activities in the millimetric wave bands by stations of the amateur service
|
International Amateur Radio Union (IARU)
|
|
2025-11-04 |
|
[ 313 ]
|
Proposal for working document towards a preliminary draft revision of Report ITU-R M.2417-1 - Technical and operational characteristics of land mobile service applications in the frequency range 275-450 GHz
|
Japan
|
Q256-2/5
|
2025-11-04 |
|
[ 312 ]
|
Proposed modifications to working document towards a preliminary draft revision of Report ITU-R M.2442-1 - Current and future usage of railway radiocommunication systems between train and trackside
|
Japan
|
Q263/5
|
2025-11-04 |
|
[ 311 ]
|
Proposed updates to working document towards a preliminary draft new Report ITU-R M.[FUTURE-ITS] - [Capabilities and evolution of future ITS]
|
Japan
|
Q264/5
|
2025-11-04 |
|
[ 310 ]
|
Proposal for a reply liaison statement to Coordination Committee for Technology (CCT) - Editorial adjustments identified by CCT to some of the proposed definitions included in preliminary draft new Report ITU-R M.[Audio-PMSE_LMS]
|
Germany
|
|
2025-11-04 |
|
[ 309 ]
|
Proposal to conclude the work on PDNR ITU-R M.[AUDIO-PMSE_LMS] to be sent to Study Group 5 as draft new Report - Overview of regional and global usage of audio PMSE as applications in the land mobile service
|
Germany
|
|
2025-11-04 |
|
[ 308 ]
|
Working document towards a preliminary new draft Report on experimental activities in the millimetric wave bands by stations of the amateur service
|
Canada
|
|
2025-10-29 |
|
[ 307 ]
|
Preliminary draft revision of the amateur and amateur satellite service Handbook
|
Canada
|
|
2025-10-29 |
|
[ 306 ]
|
Contribution to Annex 6 of the preliminary draft revision of Report ITU-R M.2533-0 - Utility radiocommunications operating in the land-mobile service
|
Netherlands (Kingdom of the)
|
Q37-6/5
|
2025-10-23 |
|
[ 305 ]
|
Amateur and Amateur-Satellite Services Handbook
|
International Amateur Radio Union (IARU)
|
|
2025-10-17 |
|
[ 304 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C - Editorial comments on terms and definitions submitted by ITU-R Working Party 5A and included in preliminary draft new Report ITU-R M.[Audio-PMSE_LMS]
|
CCT
|
|
2025-10-16 |
|
[ 303 ]
|
Liaison statement on the initiation of a new work item on draft Recommendation ITU-T Y.SEC-RTPS - Security requirements and framework for IOT infrastructures in roadside traffic perception for intelligent transportation systems
|
ITU-T SG20
|
|
2025-10-14 |
|
[ 302 ]
|
Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
|
CCT
|
|
2025-10-03 |
|
[ 301 ]
|
Liaison statement to ITU-R Working Parties 4A, 5A and 5D - Request for feedback on the term "mesh network" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation
|
CCT
|
|
2025-10-03 |
|
[ 300 ]
|
Contribution to the preliminary draft revision of Report ITU-R M.2533-0 - Utility radiocommunications operating in the land-mobile service
|
Spain
|
|
2025-09-26 |
|
[ 299 ]
|
Liaison statement to Working Parties 4A, 5A, 5C, 5D and 7B - EESS (passive) studies in the 6 425-7 250 MHz range
|
WP 7C
|
|
2025-09-26 |
|
[ 298 ]
|
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2025-09-26 |
|
[ 297 ]
|
Reply liaison statement to Working Party 5A (copy to Working Party 5C for information) - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
|
WP 6A
|
|
2025-09-16 |
|
[ 296 ]
|
Note to the Chair of ITU-R Working Parties 5A, 5B, 5C and 5D copy to ITU-R Study Group 5 - Consideration of received liaison statement from TSAG on the activities and studies on sustainable digital transformation
|
Chair, SG 5
|
|
2025-09-12 |
|
[ 295 ]
|
Liaison statement on the consent of draft new Recommendation ITU-T M.3393 (M.rsmca) - Requirements for smart maintenance of cell antenna
|
ITU-T SG2
|
|
2025-09-11 |
|
[ 294 ]
|
Reply liaison statement to ITU-R Working Party 5A - Validation of the term "radiocommunication system between train and trackside (RSTT)" and its definition and inclusion in the ITU Terms and Definitions database
|
CCT
|
|
2025-08-19 |
|
[ 293 ]
|
Reply liaison statement to Working Party 7D (copy to Working Party 5A) - Determination of the coordination area around "existing" RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz
|
WP 5D
|
|
2025-07-07 |
|
[ 292 ]
|
Reply liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
|
WP 1B
|
|
2025-06-25 |
|
[ 291 ]
|
Reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461
|
WP 1A
|
|
2025-06-19 |
|
[ 290 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 1A
|
|
2025-06-19 |
|
[ 289 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.3
|
WP 3M
|
AI1.3
|
2025-06-10 |
|
[ 288 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.4
|
WP 3M
|
AI1.4
|
2025-06-10 |
|
[ 287 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.7
|
WPs 3K and 3M
|
AI1.7
|
2025-06-10 |
|
[ 286 ]
|
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D for information) - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2025-06-10 |
|
[ 285 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.10
|
WP 3M
|
AI1.10
|
2025-06-10 |
|
[ 284 ]
|
Liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
WP 3M
|
AI1.14, AI1.13, AI1.12, AI1.11
|
2025-06-10 |
|
[ 283 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.1
|
WPs 3K and 3M
|
AI1.1
|
2025-06-09 |
|
[ 282 ]
|
Liaison statement to Working Parties 4A and 5B (copy to Working Parties 5A, 5C, 7A, 7B and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.2
|
WP 3M
|
AI1.2
|
2025-06-09 |
|
[ 281 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Guidance on usage of Recommendations ITU-R P.2108 and ITU-R P.2109 to support studies under WRC-27 agenda item 1.8
|
WPs 3J, 3K and 3M
|
AI1.8
|
2025-06-09 |
|
[ 280 ]
|
Liaison statement to Working Party 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5D for information) - Update on propagation modelling for WRC-27 agenda item 1.16
|
WP 3M
|
AI1.16
|
2025-06-09 |
|
[ 279 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.17
|
WP 3M
|
AI1.17
|
2025-06-09 |
|
[ 278 ]
|
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Update on propagation modelling for WRC-27 agenda item 1.18
|
WP 3M
|
AI1.18
|
2025-06-09 |
|
[ 277 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - Update on propagation modelling for WRC-27 agenda item 1.19
|
WP 3M
|
AI1.19
|
2025-06-09 |
|
[ 276 ]
|
Reply liaison statement to Working Party 7C on WRC-27 agenda item 1.19 (copy to Working Parties 5A and 5B for information) - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19
|
WP 4A
|
AI1.19
|
2025-06-02 |
|
[ 275 ]
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
Director, BR
|
|
2025-05-23 |
|
[ 274 ]
+Ann.06(Rev.1) |
Report on the thirty-third meeting of Working Party 5A (Geneva, 12-22 May 2025)
|
Chair, WP 5A
|
|
2025-05-21 |
|
[ 273 ]
|
Final list of participants - Working Party 5A (Geneva, 12-22 May 2025)
|
Director, BR
|
|
2025-05-21 |
|
[ 272 ]
|
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)
|
WP 4A
|
|
2025-05-20 |
|
[ 271 ]
|
Reply liaison statement to Working Parties 5A, 5B, 5C and 7C - WRC-27 agenda item 1.4
|
WP 4A
|
AI1.4
|
2025-05-20 |
|
[ 270 ]
|
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education
|
ITU-D SG2
|
|
2025-05-16 |
|
[ 269 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG1
|
|
2025-05-16 |
|
[ 268 ]
|
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 5A 5B, 5C, 5D and 6A on the Question 7/2 2025 final Report - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields
|
ITU-D SG2
|
|
2025-05-16 |
Results:317 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):