International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Meeting 2026-06-03 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B  TD (2026-06-03) 

ITU-R R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Meeting  from 2026-06-03 to 2026-06-10

held in Switzerland [Geneva]

Results:13 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source Date
[ 48 ]  
 
Report of the meeting of Working Group 1B-2     WG 1B2   2026-06-09
[ 47 ]  
 
Meeting Report of Working Group 1B1     Chair, WG 1B1   2026-06-09
[ 46 ]  
 
Assignment of texts to the Study Group 1 sub-groups     WG 1B2   2026-06-05
[ 45 ]  
 
[Draft] reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Study Groups 3, 4, 5, 6, 7) - Proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization     WG 1B2   2026-06-05
[ 44 ]  
(Rev.1) 
[Draft] reply liaison statement from ITU-R Working Party 1B to ITU-T Study Group 3 - On work items dealing with cost and economic aspects of satellite internet connectivity     WG 1B2   2026-06-05
[ 43 ]  
 
[Preliminary] draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     WG 1B2   2026-06-05
[ 42 ]  
(Rev.2) 
Preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     WG 1B2   2026-06-05
[ 41 ]  
 
[Working document towards a] Preliminary draft revision of Report ITU-R SM.2405-1 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WG 1B2   2026-06-05
[ 40 ]  
 
[Working document towards a] preliminary draft revision of Report ITU-R SM.2404-0 - Regulatory tools to support enhanced shared use of the spectrum     WG 1B2   2026-06-05
[ 39 ]  
 
[Draft] Reply liaison statement to the Coordination Committee for Terminology (CCT) and ITU-T Study Group 5 (Copy to ITU-T Study Groups 15 and 20, for information) - Comments on terms developed by ITU-T Study Group 5     WG 1B1   2026-06-05
[ 38 ]  
(Rev.1) 
Preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     WG 1B1   2026-06-05
[ 37 ]  
(Rev.1) 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     WG 1B1   2026-06-05
[ 36 ]  
 
Draft revision of Recommendation ITU-R SM.1896-1     WG 1B1   2026-06-05
Results:13 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-06-09