Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP1A Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP1A Documents de réunions
  Nb max de documents affichés/page:
Résultats: 58 documents
Result Page:  1 - 2  - Suivant
Numéro  Date Source Titre
  Numéro  Mise à disposition Taille  
 
[ 145 ]  2026-06-11 Chair, WP 1A   Report on the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)    
  [ 145 ] Annex 9 - English - Word 2026-06-25 [10:21]  1'748'805  octets Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies  
  [ 145 ] Annex 8 - English - Word 2026-06-25 [10:18]  156'246  octets Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations  
  [ 145 ] Annex 7 - English - Word 2026-06-25 [10:16]  776'473  octets Working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility of THz imaging and sensing systems [for industrial, scientific and medical applications]  
  [ 145 ] Annex 6 - English - Word 2026-06-25 [10:13]  262'716  octets Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz  
  [ 145 ] Annex 2 - English - Word 2026-06-25 [10:06]  41'564'954  octets Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] - Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz  
  [ 145 ] Annex 4 - English - Word 2026-06-25 [10:05]  19'800'132  octets Working document towards a preliminary draft revision of Report ITU-R SM.2449-1 - Impact analyses of non-beam magnetic inductive and magnetic resonant wireless power transmission for mobile and portable devices on radiocommunication services  
  [ 145 ] Annex 3 - English - Word 2026-06-25 [10:02]  50'495  octets Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - Guidance on frequency ranges for the operation of non-beam wireless power transmission for mobile and portable devices  
  [ 145 ] Annex 5 - English - Word 2026-06-25 [10:00]  8'447'308  octets Working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz  
  [ 145 ] Annex 1 - English - Word 2026-06-24 [11:51]  155'873  octets Draft CPM text on item 2.2 of the WRC-31 preliminary agenda, for Section A1/2.2 of the draft CPM Report to WRC-27  
 
[ 146 ]  2026-06-22 ITU-T SG5   Liaison statement on Comments on the definition for "out-of-band"    
  [ 146 ]  - English - Word 2026-06-22 [14:04]  31'648  octets  
 
[ 144 ]  2026-06-11 Director, BR   Final list of participants - Working Party 1A (Geneva, 3-10 June 2026)    
  [ 144 ]  - English -  PDF (acrobat) 2026-06-11 [10:42]  148'208  octets  
 
[ ADM 64 ]  2026-06-10 Chair, WP 1A   Agenda for the third (final) Plenary session of the third 2023-2027 meeting of Working Party 1A - Wednesday, 10 June 2026, at 1430 hours (Geneva time) - (Room C, ITU Tower)    
  [ ADM 64 ] Revision 2 - English - Word 2026-06-11 [08:00]  48'709  octets  
 
[ TD 70 ]  2026-06-10 WG 1A3   Working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility of THz imaging and sensing systems [for industrial, scientific and medical applications]    
  [ TD 70 ] Revision 1 - English - Word 2026-06-10 [16:41]  774'388  octets  
 
[ TD 72 ]  2026-06-10 WG 1A3   Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations    
  [ TD 72 ] Revision 1 - English - Word 2026-06-10 [16:12]  154'250  octets  
 
[ TD 73 ]  2026-06-10 WG 1A3   Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies    
  [ TD 73 ] Revision 1 - English - Word 2026-06-10 [14:35]  1'745'965  octets  
  [ TD 73 ]  - English - Word 2026-06-10 [09:20]  1'776'429  octets  
 
[ TD 75 ]  2026-06-10 WG 1A-3   Chair's Report of Working Group 1A-3 - (WRC-31 preliminary agenda item 2.1, WRC-27 agenda items, and other issues)    
  [ TD 75 ]  - English - Word 2026-06-10 [14:58]  59'485  octets  
 
[ TD 65 ]  2026-06-09 WG 1A2   Preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam    
  [ TD 65 ] Revision 2 - English - Word 2026-06-10 [14:05]  11'277'213  octets  
 
[ TD 67 ]  2026-06-09 WP 1A   Draft liaison statement to Working Parties 4C, 5D, 7C, and 7D - Beam wireless power transmission (WPT)    
  [ TD 67 ] Revision 1 - English - Word 2026-06-10 [13:31]  40'440  octets  
 
[ TD 74 ]  2026-06-10 WG 1A2   Meeting Report of Working Group 1A2    
  [ TD 74 ]  - English - Word 2026-06-10 [14:41]  53'142  octets  
 
[ TD 54 ]  2026-06-04 WG 1A2   Preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz    
  [ TD 54 ] Revision 2 - English - Word 2026-06-10 [12:25]  41'554'153  octets  
 
[ TD 55 ]  2026-06-04 WG 1A2   [Preliminary] draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam    
  [ TD 55 ] Revision 2 - English - Word 2026-06-10 [11:52]  4'770'427  octets  
 
[ TD 56 ]  2026-06-04 WG 1A2   [Preliminary] draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks    
  [ TD 56 ] Revision 2 - English - Word 2026-06-10 [11:23]  44'723  octets  
 
[ TD 60 ]  2026-06-08 DG THz   For information only: Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz    
  [ TD 60 ] Revision 1 - English - Word 2026-06-10 [09:13]  261'164  octets  
 
[ ADM 59 ]  2026-06-08 Chair, WG 1A-3   Draft agenda for the fifth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Wednesday, 10 June 2026, P2 at 1040-1200 hours (Geneva time) (Room A, ITU Tower)    
  [ ADM 59 ] Revision 1 - English - Word 2026-06-10 [09:12]  36'808  octets  
 
[ TD 59 ]  2026-06-08 WG 1A3   Draft liaison statement to the IEC ACEC, TC 77 and CISPR - On consistent use of the term high frequency (HF)    
  [ TD 59 ] Revision 1 - English - Word 2026-06-10 [08:50]  42'090  octets  
 
[ TD 71 ]  2026-06-10 WG 1A3   [Draft] liaison statement to external organizations (copy for information to Working Parties 5A and 5C)    
  [ TD 71 ]  - English - Word 2026-06-10 [09:13]  36'995  octets  
 
[ TD 61 ]  2026-06-08 WG 1A3   Working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz    
  [ TD 61 ] Revision 1 - English - Word 2026-06-10 [08:45]  8'448'145  octets  
 
[ TD 69 ]  2026-06-10 Acting Chair, WG 1A-1   Chair's Report of Working Group 1A-1    
  [ TD 69 ]  - English - Word 2026-06-10 [09:04]  56'513  octets  
 
[ ADM 42 ]  2026-05-29 Chairs, WPs 1A, 1B & 1C   Provisional schedule for the sessions of the Third 2023-2027 Meetings of Working Parties 1A and 1C and Fourth Meeting of Working Party 1B (Geneva, 3-10 June 2026)    
  [ ADM 42 ] Revision 5 - English - Word 2026-06-09 [17:42]  55'016  octets  
 
[ TD 68 ]  2026-06-09 WP 1A   Draft reply liaison statement to CCT (copy for information to ITU-R Working Party 5D and to ITU-T Study Group 12) - Clarifications on the term "conducted radio frequency connection" and its definition    
  [ TD 68 ]  - English - Word 2026-06-10 [08:32]  41'686  octets  
 
[ ADM 63 ]  2026-06-09 WG 1A-2   Draft agenda for the eight meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 10 June 2025 at 0900 hours (Geneva time) (Room A, Tower)    
  [ ADM 63 ]  - English - Word 2026-06-09 [14:44]  46'911  octets  
 
[ TD 64 ]  2026-06-09 WG 1A2   Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - Guidance on frequency ranges for the operation of non-beam wireless power transmission for mobile and portable devices    
  [ TD 64 ] Revision 1 - English - Word 2026-06-09 [11:12]  50'797  octets  
 
[ TD 66 ]  2026-06-09 WG 1A2   Working document towards a preliminary draft revision of Report ITU-R SM.2449-1 - Impact analyses of non-beam magnetic inductive and magnetic resonant wireless power transmission for mobile and portable devices on radiocommunication services    
  [ TD 66 ] Revision 1 - English - Word 2026-06-09 [11:07]  19'799'870  octets  
 
[ TD 63 ]  2026-06-09 WP 1A   Draft reply liaison statement to IEC CISPR/H (copy to ITU-R Study Group 3) - Radio Noise Types and Methods of Measurement    
  [ TD 63 ]  - English - Word 2026-06-09 [09:52]  41'798  octets  
 
[ TD 57 ]  2026-06-05 WG 1A1   Draft liaison statement to IEC CISPR/H (copy to ITU-R Working Party 7D for information) - CISPR work relating to 'Unintentional Radio Frequency Energy (URFE)'    
  [ TD 57 ]  - English - Word 2026-06-08 [08:05]  35'378  octets  
 
[ TD 58 ]  2026-06-05 WG 1A1   Draft reply liaison statement to Working Party 7D (copy to IEC CISPR/H for information) - Unintentional electromagnetic radiation from space stations    
  [ TD 58 ]  - English - Word 2026-06-05 [17:38]  38'612  octets  
 
[ ADM 62 ]  2026-06-09 Acting Chair, WG 1A-1   Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 9 June 2026, at 1400 hours (Geneva time) (Room A, Tower)    
  [ ADM 62 ]  - English - Word 2026-06-09 [08:14]  33'678  octets  
 
[ TD 62 ]  2026-06-09 WG 1A1   [Preliminary] draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications    
  [ TD 62 ]  - English - Word 2026-06-09 [08:21]  17'696'173  octets  
 
[ ADM 57 ]  2026-06-08 Chair, WG 1A-3   Draft agenda for the third session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, during P2 at 1040 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 57 ] Revision 1 - English - Word 2026-06-08 [13:55]  39'625  octets  
 
[ ADM 61 ]  2026-06-08 Chair, WG 1A-2   Draft agenda for the seventh meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 9 June 2025 at 0900 hours (Geneva time) (Room A, Tower)    
  [ ADM 61 ]  - English - Word 2026-06-08 [13:49]  46'339  octets  
 
[ TD 53 ]  2026-06-04 WG 1A2   Draft CPM text on item 2.2 of the WRC-31 preliminary agenda, for section A1/2.2 of the draft CPM Report to WRC-27    
  [ TD 53 ] Revision 1 - English - Word 2026-06-08 [10:24]  156'136  octets  
 
[ ADM 56 ]  2026-06-05 Chair, WP 1A   Agenda for the second (interim) Plenary session of the third 2023-2027 meeting of Working Party 1A - Monday, 8 June 2026, at 1040 hours (Geneva time) - (Room C, ITU Tower)    
  [ ADM 56 ] Revision 1 - English - Word 2026-06-08 [10:18]  37'625  octets  
 
[ ADM 60 ]  2026-06-08 Acting Chair, WG 1A-1   Draft agenda for the fourth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Monday, 8 June 2026, at 1540 hours (Geneva time) (Room L, Montbrillant)    
  [ ADM 60 ]  - English - Word 2026-06-08 [08:51]  43'181  octets  
 
[ ADM 58 ]  2026-06-08 Chair, WG 1A-3   Draft agenda for the fourth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, P3 at 1400 hours (Geneva time) (Room A, ITU Tower)    
  [ ADM 58 ]  - English - Word 2026-06-08 [08:41]  38'608  octets  
 
[ ADM 55 ]  2026-06-05 Chair, WG 1A-2   Draft agenda for the sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 8 June 2025 at 0900 hours (Geneva time) (Room A, Tower)    
  [ ADM 55 ] Revision 1 - English - Word 2026-06-08 [08:32]  43'937  octets  
 
[ ADM 54 ]  2026-06-05 Acting Chair, WG 1A-1   Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) Friday, 5 June 2026, at 1430 hours (Geneva time) (Room A, ITU Tower)    
  [ ADM 54 ]  - English - Word 2026-06-05 [13:26]  45'139  octets  
 
[ ADM 53 ]  2026-06-04 Acting Chair, WG 1A-1   Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Thursday, 4 June 2026, at 1400 hours (Geneva time) (Room A, ITU Tower) -    
  [ ADM 53 ]  - English - Word 2026-06-05 [14:01]  42'156  octets  
 
[ ADM 52 ]  2026-06-04 Chair, WG 1A-2   Draft agenda for the fifth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 1610 hours (Geneva time) (Room A, Tower)    
  [ ADM 52 ]  - English - Word 2026-06-04 [09:44]  36'118  octets  
 
[ ADM 51 ]  2026-06-04 Chair, WG 1A-2   Draft agenda for the fourth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 0900 hours (Geneva time) (Room A, Tower)    
  [ ADM 51 ]  - English - Word 2026-06-04 [09:41]  36'300  octets  
Résultats: 58 documents
Result Page:  1 - 2  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2026-06-25