|
Numéro |
Date
|
Source
|
Titre
|
Questions
|
| |
Numéro |
Mise à disposition |
Taille
|
|
|
| |
|
[ 147 ]
|
2026-07-20 |
ITU-T SG15
|
Liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
N/A
|
|
[ 147 ] - English - Word |
2026-07-20 [16:38]
|
34'800 octets |
|
| |
|
[ 145 ]
|
2026-06-11 |
Chair, WP 1A
|
Report on the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)
|
N/A
|
|
[ 145 ] - English - Word |
2026-07-08 [14:01]
|
137'057 octets |
Report of the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)
|
|
[ 145 ] Annex 9 - English - Word |
2026-06-25 [10:21]
|
1'748'805 octets |
Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
|
[ 145 ] Annex 8 - English - Word |
2026-06-25 [10:18]
|
156'246 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations
|
|
[ 145 ] Annex 7 - English - Word |
2026-06-25 [10:16]
|
776'473 octets |
Working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility of THz imaging and sensing systems [for industrial, scientific and medical applications]
|
|
[ 145 ] Annex 6 - English - Word |
2026-06-25 [10:13]
|
262'716 octets |
Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz
|
|
[ 145 ] Annex 2 - English - Word |
2026-06-25 [10:06]
|
41'564'954 octets |
Preliminary draft revision of REPORT ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz
|
|
[ 145 ] Annex 4 - English - Word |
2026-06-25 [10:05]
|
19'800'132 octets |
Working document towards a preliminary draft revision of Report ITU-R SM.2449-1 - Impact analyses of non-beam magnetic inductive and magnetic resonant wireless power transmission for mobile and portable devices on radiocommunication services
|
|
[ 145 ] Annex 3 - English - Word |
2026-06-25 [10:02]
|
50'495 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - Guidance on frequency ranges for the operation of non-beam wireless power transmission for mobile and portable devices
|
|
[ 145 ] Annex 5 - English - Word |
2026-06-25 [10:00]
|
8'447'308 octets |
Working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz
|
|
[ 145 ] Annex 1 - English - Word |
2026-06-24 [11:51]
|
155'873 octets |
Draft CPM text on item 2.2 of the WRC-31 preliminary agenda, for Section A1/2.2 of the draft CPM Report to WRC-27
|
| |
|
[ 146 ]
|
2026-06-22 |
ITU-T SG5
|
Liaison statement on Comments on the definition for "out-of-band"
|
N/A
|
|
[ 146 ] - English - Word |
2026-06-22 [14:04]
|
31'648 octets |
|
| |
|
[ 144 ]
|
2026-06-11 |
Director, BR
|
Final list of participants - Working Party 1A (Geneva, 3-10 June 2026)
|
N/A
|
|
[ 144 ] - English - PDF (acrobat) |
2026-06-11 [10:42]
|
148'208 octets |
|
| |
|
[ ADM 64 ]
|
2026-06-10 |
Chair, WP 1A
|
Agenda for the third (final) Plenary session of the third 2023-2027 meeting of Working Party 1A - Wednesday, 10 June 2026, at 1430 hours (Geneva time) - (Room C, ITU Tower)
|
N/A
|
|
[ ADM 64 ] Revision 2 - English - Word |
2026-06-11 [08:00]
|
48'709 octets |
|
| |
|
[ ADM 59 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the fifth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Wednesday, 10 June 2026, P2 at 1040-1200 hours (Geneva time) (Room A, ITU Tower)
|
N/A
|
|
[ ADM 59 ] Revision 1 - English - Word |
2026-06-10 [09:12]
|
36'808 octets |
|
| |
|
[ ADM 42 ]
|
2026-05-29 |
Chairs, WPs 1A, 1B & 1C
|
Provisional schedule for the sessions of the Third 2023-2027 Meetings of Working Parties 1A and 1C and Fourth Meeting of Working Party 1B (Geneva, 3-10 June 2026)
|
N/A
|
|
[ ADM 42 ] Revision 5 - English - Word |
2026-06-09 [17:42]
|
55'016 octets |
|
| |
|
[ ADM 63 ]
|
2026-06-09 |
WG 1A-2
|
Draft agenda for the eight meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 10 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 63 ] - English - Word |
2026-06-09 [14:44]
|
46'911 octets |
|
| |
|
[ ADM 62 ]
|
2026-06-09 |
Acting Chair, WG 1A-1
|
Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 9 June 2026, at 1400 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 62 ] - English - Word |
2026-06-09 [08:14]
|
33'678 octets |
|
| |
|
[ ADM 57 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the third session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, during P2 at 1040 hours (Geneva time) (Room C, ITU Tower)
|
N/A
|
|
[ ADM 57 ] Revision 1 - English - Word |
2026-06-08 [13:55]
|
39'625 octets |
|
| |
|
[ ADM 61 ]
|
2026-06-08 |
Chair, WG 1A-2
|
Draft agenda for the seventh meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 9 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 61 ] - English - Word |
2026-06-08 [13:49]
|
46'339 octets |
|
| |
|
[ ADM 56 ]
|
2026-06-05 |
Chair, WP 1A
|
Agenda for the second (interim) Plenary session of the third 2023-2027 meeting of Working Party 1A - Monday, 8 June 2026, at 1040 hours (Geneva time) - (Room C, ITU Tower)
|
N/A
|
|
[ ADM 56 ] Revision 1 - English - Word |
2026-06-08 [10:18]
|
37'625 octets |
|
| |
|
[ ADM 60 ]
|
2026-06-08 |
Acting Chair, WG 1A-1
|
Draft agenda for the fourth meeting of Working Group 1A-1
(EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Monday, 8 June 2026, at 1540 hours (Geneva time) (Room L, Montbrillant)
|
N/A
|
|
[ ADM 60 ] - English - Word |
2026-06-08 [08:51]
|
43'181 octets |
|
| |
|
[ ADM 58 ]
|
2026-06-08 |
Chair, WG 1A-3
|
Draft agenda for the fourth session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Monday, 8 June 2026, P3 at 1400 hours (Geneva time) (Room A, ITU Tower)
|
N/A
|
|
[ ADM 58 ] - English - Word |
2026-06-08 [08:41]
|
38'608 octets |
|
| |
|
[ ADM 55 ]
|
2026-06-05 |
Chair, WG 1A-2
|
Draft agenda for the sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 8 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 55 ] Revision 1 - English - Word |
2026-06-08 [08:32]
|
43'937 octets |
|
| |
|
[ ADM 54 ]
|
2026-06-05 |
Acting Chair, WG 1A-1
|
Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) Friday, 5 June 2026, at 1430 hours (Geneva time) (Room A, ITU Tower)
|
N/A
|
|
[ ADM 54 ] - English - Word |
2026-06-05 [13:26]
|
45'139 octets |
|
| |
|
[ ADM 53 ]
|
2026-06-04 |
Acting Chair, WG 1A-1
|
Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Thursday, 4 June 2026, at 1400 hours (Geneva time) (Room A, ITU Tower)
-
|
N/A
|
|
[ ADM 53 ] - English - Word |
2026-06-05 [14:01]
|
42'156 octets |
|
| |
|
[ ADM 52 ]
|
2026-06-04 |
Chair, WG 1A-2
|
Draft agenda for the fifth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 1610 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 52 ] - English - Word |
2026-06-04 [09:44]
|
36'118 octets |
|
| |
|
[ ADM 51 ]
|
2026-06-04 |
Chair, WG 1A-2
|
Draft agenda for the fourth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday, 5 June 2025 at 0900 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 51 ] - English - Word |
2026-06-04 [09:41]
|
36'300 octets |
|
| |
|
[ ADM 50 ]
|
2026-06-04 |
Chair, WG 1A-3
|
Draft agenda for the second session of Working Group 1A-3
(WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Thursday, 4 June 2026, at 0900 hours (Geneva time) (Room A, ITU Tower)
|
N/A
|
|
[ ADM 50 ] - English - Word |
2026-06-04 [08:20]
|
41'455 octets |
|
| |
|
[ ADM 44 ]
|
2026-05-29 |
Chair, WP 1A
|
Structure of Sub-Groups and assignment of input documents for the third 2023-2027 Meeting of Working Party 1A (Geneva, 3-10 June 2026)
|
N/A
|
|
[ ADM 44 ] Revision 1 - English - Word |
2026-06-03 [11:42]
|
60'004 octets |
|
| |
|
[ ADM 41 ]
|
2026-05-29 |
Chairs, WPs 1A, 1B & 1C
|
Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 3 June 2026, at 0930 hours (Geneva time) - (ITU Room C)
|
N/A
|
|
[ ADM 41 ] Revision 1 - English - Word |
2026-06-03 [11:37]
|
54'475 octets |
|
| |
|
[ ADM 48 ]
|
2026-06-03 |
Chair, WG 1A-2
|
Draft agenda for the second meeting of Working Group 1A-2
Wireless power transmission (WPT) and related issues - Thursday, 4 June 2026 at 1040 hours (Geneva time) (Room A, ITU Tower)
|
N/A
|
|
[ ADM 48 ] - English - Word |
2026-06-03 [10:21]
|
35'259 octets |
|
| |
|
[ ADM 49 ]
|
2026-06-03 |
Chair, WG 1A-2
|
Draft agenda for the third meeting of Working Group 1A-2
Wireless power transmission (WPT) and related issues - Thursday, 4 June 2025 at 1540 hours (Geneva time) (Room A, Tower)
|
N/A
|
|
[ ADM 49 ] - English - Word |
2026-06-03 [10:38]
|
36'002 octets |
|
| |
|
[ 143 ]
|
2026-06-03 |
WP 5A
|
Reply liaison statement to ETSI ISG THz (copy for information to ITU-R Working Party 1A) - THz use cases
|
N/A
|
|
[ 143 ] - English - Word |
2026-06-03 [08:25]
|
42'729 octets |
|
| |
|
[ ADM 47 ]
|
2026-06-03 |
Chair, WG 1A-3
|
Draft agenda for the first session of Working Group 1A-3
(WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Wednesday, 3 June, 2026 P2 (1040-1200 hours) (Geneva time) (Room C, ITU Tower)
|
N/A
|
|
[ ADM 47 ] - English - Word |
2026-06-03 [08:27]
|
42'043 octets |
|
| |
|
[ ADM 46 ]
|
2026-06-02 |
Acting Chair, WG 1A-1
|
Draft agenda for the first meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Wednesday, 3 June 2026, at 1540 hours (Geneva time) (Room L, Montbrillant)
|
N/A
|
|
[ ADM 46 ] - English - Word |
2026-06-02 [17:55]
|
41'911 octets |
|
| |
|
[ 142 ]
|
2026-06-02 |
BR, Study Groups Department
|
List of documents issued (Documents 1A/104 - 1A/142)
|
N/A
|
|
[ 142 ] - English - Word |
2026-06-02 [11:57]
|
42'122 octets |
|
| |
|
[ ADM 45 ]
|
2026-06-02 |
Chair, WG 1A-2
|
Draft agenda for the 1st meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 3 June 2026 at 1400 hours (Geneva time) Room A (ITU - Tower)
|
N/A
|
|
[ ADM 45 ] - English - Word |
2026-06-02 [08:45]
|
40'532 octets |
|
| |
|
[ 141 ]
|
2026-06-01 |
SG 1 Rapp. to CISPR on WPT issues
|
Report on CISPR activities from June 2025 to May 2026
|
N/A
|
|
[ 141 ] - English - Word |
2026-06-01 [15:03]
|
44'200 octets |
|
| |
|
[ ADM 43 ]
|
2026-05-29 |
Chair, WP 1A
|
Agenda for the opening (first) Plenary session of the third 2023-2027 meeting of Working Party 1A - Wednesday, 3 June 2026, at 1040 hours (Geneva time) - (ITU Room C)
|
N/A
|
|
[ ADM 43 ] - English - Word |
2026-06-02 [18:02]
|
38'125 octets |
|
| |
|
[ 138 ]
|
2026-05-22 |
United States
|
Preliminary draft revision of Recommendation ITU-R SM.2151-0 - US proposal for elevation
|
N/A
|
|
[ 138 ] - English - Word |
2026-05-25 [13:58]
|
39'316 octets |
|
| |
|
[ 137 ]
|
2026-05-22 |
United States
|
Preliminary draft revision of Report ITU-R SM.2505-0 - US proposal for elevation
|
N/A
|
|
[ 137 ] - English - Word |
2026-05-25 [13:46]
|
4'699'759 octets |
|
| |
|
[ 140 ]
|
2026-05-22 |
United States
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - US Proposal for revision of Recommendation
|
N/A
|
|
[ 140 ] - English - Word |
2026-05-25 [14:00]
|
46'908 octets |
|
| |
|
[ 139 ]
|
2026-05-22 |
United States
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
N/A
|
|
[ 139 ] - English - Word |
2026-05-25 [14:04]
|
1'755'079 octets |
|
| |
|
[ 136 ]
|
2026-05-22 |
United States
|
Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - Proposal to progress the work
|
N/A
|
|
[ 136 ] - English - Word |
2026-05-25 [16:05]
|
53'386 octets |
|
| |
|
[ 129 ]
|
2026-05-21 |
British Broadcasting Corporation (BBC)
|
Draft reply liaison statement to Working Party 7D - Unintentional electromagnetic radiation from space stations
|
N/A
|
|
[ 129 ] - English - Word |
2026-05-21 [14:23]
|
35'845 octets |
|
| |
|
[ 135 ]
|
2026-05-22 |
Brazil
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations
|
N/A
|
|
[ 135 ] - English - Word |
2026-05-22 [14:44]
|
175'399 octets |
|
| |
|
[ 132 ]
|
2026-05-22 |
Japan
|
Proposal for a working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz
|
Q237/1
|
|
[ 132 ] - English - Word |
2026-05-22 [12:13]
|
8'439'657 octets |
|
| |
|
[ 134 ]
|
2026-05-22 |
Japan
|
Proposal on studies on wireless power transmission (WPT) invited by Resolution 910 (WRC-23)
|
N/A
|
|
[ 134 ] - English - Word |
2026-05-22 [11:57]
|
53'012 octets |
|
| |
|
[ 133 ]
|
2026-05-22 |
Japan
|
Proposal on working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility for THz narrow-band industrial, scientific and medical applications
|
Q237/1
|
|
[ 133 ] - English - Word |
2026-05-22 [11:39]
|
534'421 octets |
|
Résultats: 58 documents
Result Page:
1 -
2
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):