Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP1A Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP1A Documentos de la reunión
  Número máximo de documentos/página:
Resultados: 59 documentos
Result Page:  1 - 2  - Siguiente
Número  Fecha Origen Título Cuestiones 
  Número  Puesta a disposición Tamaño    
 
[ 104 ]  2025-06-18 Chair, WP 1A   Report on the second 2023-2027 meeting of Working Party 1A (Geneva, 11-18 June 2025)     N/A (no se aplica)  
  [ 104 ] Part 2 - English -  Word 2025-07-18 [16:12]  45'082  octetos  
  [ 104 ] Part 1 - English -  Word 2025-07-18 [16:12]  45'718  octetos  
  [ 104 ]  - English -  Word 2025-07-18 [16:12]  186'673  octetos Report of the second 2023-2027 meeting of Working Party 1A (Geneva, 11-18 June 2025)  
  [ 104 ] Annex 9 - English -  Word 2025-07-02 [12:15]  1'749'128  octetos Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies  
  [ 104 ] Annex 6 - English -  Word 2025-07-02 [12:02]  45'501'354  octetos Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz  
  [ 104 ] Annex 7 - English -  Word 2025-07-02 [11:24]  2'656'891  octetos For information only: Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] - Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz  
  [ 104 ] Annex 8 - English -  Word 2025-07-02 [10:53]  11'903'783  octetos Working document towards a preliminary draft revision of Report ITU-R SM.2057 - Studies related to the impact of devices using ultra-wideband technology on radiocommunication services  
  [ 104 ] Annex 5 - English -  Word 2025-07-01 [16:52]  11'280'088  octetos Preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam  
  [ 104 ] Annex 2 - English -  Word 2025-07-01 [16:49]  6'796'117  octetos Preliminary draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications  
  [ 104 ] Annex 1 - English -  Word 2025-07-01 [14:17]  41'231  octetos Terms of Reference for the Correspondence Group on EMC Related Interference and Coexistence of Wired Telecommunications Systems with Radiocommunication Systems  
  [ 104 ] Annex 4 - English -  Word 2025-06-19 [10:40]  4'667'480  octetos Preliminary draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam  
  [ 104 ] Annex 3 - English -  Word 2025-06-19 [08:14]  41'765  octetos Preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks  
 
[ 105 ]  2025-06-23 WP 1B   Reply liaison statement to the Coordination Committee For Terminology (CCT) (Copy to ITU-T Study Groups 11, 17 and 20 and for information to ITU-R Working Party 1A) - UWB definition for addition to the ITU Terms and Definitions database     N/A (no se aplica)  
  [ 105 ]  - English -  Word 2025-06-23 [10:32]  41'605  octetos  
 
[ 103 ]  2025-06-18 Director, BR   Final list of participants - Working Party 1A (Geneva, 11-18 June 2025)     N/A (no se aplica)  
  [ 103 ]  - English -  PDF (acrobat) 2025-06-18 [17:17]  149'556  octetos  
 
[ 101 ]  2025-06-10 BR, Study Groups Department   List of documents issued (Documents 1A/43 - 1A/102)     N/A (no se aplica)  
  [ 101 ] Revision 1 - English -  Word 2025-06-18 [09:02]  48'018  octetos  
 
[ ADM 40 ]  2025-06-18 Chair, WP 1A   Agenda for the third (final) Plenary session of the second 2023-2027 meeting of Working Party 1A - Wednesday, 18 June 2025, at 1400 hours (Geneva time) - (Room K, ITU Montbrillant building)"     N/A (no se aplica)  
  [ ADM 40 ]  - English -  Word 2025-06-18 [12:57]  40'586  octetos  
 
[ ADM 21 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Provisional schedule for the sessions of the Second 2023-2027 Meetings of Working Parties 1A and 1C and Third Meetings of Working Party 1B     N/A (no se aplica)  
  [ ADM 21 ] Revision 7 - English -  Word 2025-06-17 [18:03]  57'415  octetos  
 
[ ADM 39 ]  2025-06-17 Chair, WG 1A-1   Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 17 June 2025, at 1540 hours (Geneva time) (Room L, Montbrillant)     N/A (no se aplica)  
  [ ADM 39 ]  - English -  Word 2025-06-17 [14:51]  41'678  octetos  
 
[ ADM 31 ]  2025-06-12 Chair, WP 1A   Agenda for the second Plenary session of the second 2023-2027 meeting of Working Party 1A - Tuesday, 17 June 2025, at 1040 hours (Geneva time) (Room K, Montbrillant)     N/A (no se aplica)  
  [ ADM 31 ] Revision 2 - English -  Word 2025-06-17 [10:43]  39'805  octetos  
 
[ ADM 38 ]  2025-06-17 Chair, WG 1A-2   Draft agenda for the 8th and 9th meeting of Working Group 1A-2 Wireless power transmission (WPT) and related issues - Wednesday 18 June , 0900 and 1040 (Room H, Montbrillant)     N/A (no se aplica)  
  [ ADM 38 ]  - English -  Word 2025-06-18 [08:22]  34'043  octetos  
 
[ ADM 37 ]  2025-06-17 Chair, WG 1A-3   Draft agenda for the third and fourth sessions of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Tuesday, 17 June, P1 (0900-1020 hours) (Geneva time) - Tuesday, 17 June, P2 (1040-1200) after WP 1A Plenary (Room K, Montbrillant)     N/A (no se aplica)  
  [ ADM 37 ]  - English -  Word 2025-06-17 [08:24]  43'158  octetos  
 
[ ADM 35 ]  2025-06-16 Chair, WG 1A-1   Draft agenda for the fourth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Monday, 16 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 35 ]  - English -  Word 2025-06-16 [08:50]  40'939  octetos  
 
[ ADM 34 ]  2025-06-13 Chair, WG 1A-2   Draft agenda for the fifth and sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 16 June 2025, at 1400 and 1540 hours (Geneva time) - (Room K, Montbrillant)     N/A (no se aplica)  
  [ ADM 34 ] Revision 1 - English -  Word 2025-06-16 [12:03]  40'543  octetos  
 
[ ADM 36 ]  2025-06-16 Chair, WG 1A-2   Draft agenda for the 7th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 17 June 2025, at 1400 hours (Geneva time) (Room L, Montbrillant)     N/A (no se aplica)  
  [ ADM 36 ]  - English -  Word 2025-06-17 [08:18]  35'504  octetos  
 
[ ADM 23 ]  2025-06-04 Chair, WP 1A   Structure of sub-Groups and assignment of input documents for the second 2023-2027 Meeting of Working Party 1A (Geneva, 11-18 June 2025)     N/A (no se aplica)  
  [ ADM 23 ] Revision 2 - English -  Word 2025-06-16 [08:30]  54'040  octetos  
 
[ 102 ]  2025-06-13 Chair, WP 1B   Note to the Chair of Working Party 1A - UWB abbreviation and definition for addition to the ITU Terms and Definitions database     N/A (no se aplica)  
  [ 102 ]  - English -  Word 2025-06-17 [09:13]  35'364  octetos  
 
[ ADM 33 ]  2025-06-13 Chair, WG 1A-1   Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Friday, 13 June 2025, at 1610 hours (Geneva time) (Room L, Montbrillant)     N/A (no se aplica)  
  [ ADM 33 ] Revision 1 - English -  Word 2025-06-13 [15:03]  43'541  octetos  
 
[ ADM 32 ]  2025-06-13 Chair, WG 1A-3   Draft agenda for the second session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Friday, 13 June 2025, P3 (1430-1550 hours) (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 32 ]  - English -  Word 2025-06-13 [11:55]  42'522  octetos  
 
[ ADM 29 ]  2025-06-12 Chair, WG 1A-2   Draft agenda for the 4 th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday , 13 June 2025 at 1040 hours (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 29 ]  - English -  Word 2025-06-12 [18:44]  38'621  octetos  
 
[ ADM 30 ]  2025-06-12 Chair, WG 1A-1   Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Friday, 13 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 30 ]  - English -  Word 2025-06-12 [16:14]  41'719  octetos  
 
[ ADM 24 ]  2025-06-11 Chair, WG 1A-1   Draft agenda for the initial meetings of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Wednesday, 11 June 2025, following WP 1A Plenary at 1040 hours (Geneva time) (Room C, Tower)     N/A (no se aplica)  
  [ ADM 24 ]  - English -  Word 2025-06-11 [08:36]  39'613  octetos  
 
[ ADM 26 ]  2025-06-11 Chair, WG 1A-2   Draft agenda for the 2nd meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday , 12 June 2025 at 1400 hours (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 26 ] Revision 1 - English -  Word 2025-06-12 [10:00]  39'505  octetos  
 
[ ADM 28 ]  2025-06-12 Chair, WG 1A-2   Draft agenda for the third meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday, 12 June 2025 at 1540 hours (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 28 ] Revision 1 - English -  Word 2025-06-12 [09:59]  38'008  octetos  
 
[ ADM 27 ]  2025-06-12 Acting Chair, WG 1A-3   Draft agenda for the first session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Thursday, 12 June P1, (0900-1020 hours) (Geneva time) (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 27 ]  - English -  Word 2025-06-12 [08:24]  40'897  octetos  
 
[ ADM 25 ]  2025-06-11 Chair, WG 1A-2   Draft agenda for the 1st meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 11 June 2025 at 1540 hours (Geneva time) (Room H, Montbrillant)     N/A (no se aplica)  
  [ ADM 25 ]  - English -  Word 2025-06-11 [09:57]  39'822  octetos  
 
[ 64 ]  2025-02-21 ITU-T SG2   Liaison statement on request for input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the context of indoor coverage technologies     N/A (no se aplica)  
  [ 64 ] Revision 1 - English -  Word 2025-06-11 [17:45]  39'158  octetos  
 
[ ADM 20 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 11 June 2025, at 0930 hours (Geneva time) - (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 20 ] Revision 1 - English -  Word 2025-06-11 [12:30]  50'025  octetos  
 
[ ADM 22 ]  2025-06-04 Chair, WP 1A   Agenda for the opening (first) Plenary session of the second 2023-2027 meeting of Working Party 1A - Wednesday, 11 June 2025, at 1040 hours (Geneva time) - (Room C, ITU Tower)     N/A (no se aplica)  
  [ ADM 22 ]  - English -  Word 2025-06-10 [17:40]  35'807  octetos  
 
[ 100 ]  2025-06-09 WP 3M   Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 1A, 5C) - Free-space optics systems related aspects for G.fso     N/A (no se aplica)  
  [ 100 ]  - English -  Word 2025-06-09 [13:39]  41'371  octetos  
 
[ 99 ]  2025-06-09 SG 1 Rapp. to CISPR on WPT issues   Report on CISPR activities from June 2024 to June 2025 on WPT issues     N/A (no se aplica)  
  [ 99 ]  - English -  Word 2025-06-09 [09:36]  68'739  octetos  
 
[ 98 ]  2025-05-30 India   Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks     N/A (no se aplica)  
  [ 98 ]  - English -  Word 2025-05-30 [16:02]  34'729  octetos  
 
[ 97 ]  2025-05-30 Germany   Preliminary draft revision of Recommendation ITU-R SM.1755-0 - Characteristics of ultra-wideband technology     N/A (no se aplica)  
  [ 97 ]  - English -  Word 2025-05-30 [14:33]  34'484  octetos  
 
[ 96 ]  2025-05-30 Germany   Working document towards a preliminary draft Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies     N/A (no se aplica)  
  [ 96 ]  - English -  Word 2025-05-30 [14:22]  1'666'087  octetos  
 
[ 76 ]  2025-05-22 Netherlands (Kingdom of the)   Unwanted electromagnetic radiation (UEMR) and Question ITU-R 243/1     Q243/1  
  [ 76 ] Revision 1 - English -  Word 2025-05-29 [11:00]  41'470  octetos  
 
[ 95 ]  2025-05-28 ATDI   Compiled preliminary revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles     N/A (no se aplica)  
  [ 95 ]  - English -  Word 2025-05-29 [11:13]  58'307  octetos  
 
[ 94 ]  2025-05-28 ATDI   Working document towards a preliminary draft revision of Report ITU-R SM.2451-1     N/A (no se aplica)  
  [ 94 ]  - English -  Word 2025-05-29 [09:50]  37'378  octetos  
 
[ 93 ]  2025-05-28 United Kingdom   Preliminary draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles     N/A (no se aplica)  
  [ 93 ]  - English -  Word 2025-05-29 [08:33]  53'370  octetos  
 
[ 92 ]  2025-05-28 United Kingdom   Proposed draft clarifications to "features of the necessary bandwidth", for Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions     N/A (no se aplica)  
  [ 92 ]  - English -  Word 2025-05-29 [08:14]  43'488  octetos  
 
[ 91 ]  2025-05-28 Japan   Proposal for development of new Report on the usage overview of Wireless Power Transmission (WPT)     Q210-4/1  
  [ 91 ]  - English -  Word 2025-05-28 [16:30]  655'307  octetos  
 
[ 90 ]  2025-05-28 Japan   Proposal for a draft liaison statement to APT Wireless Group - AWG deliverables in the frequency above 252 GHz     N/A (no se aplica)  
  [ 90 ]  - English -  Word 2025-05-28 [16:05]  36'792  octetos  
Resultados: 59 documentos
Result Page:  1 - 2  - Siguiente
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML Si  
Formatos doc pdf zip  + Otros formatos
Idiomas (máximo 2) E F S A C R  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-07-18