International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1A : Contributions : 145 Recently posted -  Search Meeting Documents
   
[145]  Report on the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)

Format

Size

Posted

English

Word  

1748805 bytes 2026-06-25 [145] Annex 9 - Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies

Word  

156246 bytes 2026-06-25 [145] Annex 8 - Working document towards a preliminary draft revision of Recommendation ITU-R SM.337-6 - Frequency and Distance Separations

Word  

776473 bytes 2026-06-25 [145] Annex 7 - Working document towards a preliminary draft new Report ITU-R SM.[THZ.NB.APPLICATIONS] - Technical and operational feasibility of THz imaging and sensing systems [for industrial, scientific and medical applications]

Word  

262716 bytes 2026-06-25 [145] Annex 6 - Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz

Word  

8447308 bytes 2026-06-25 [145] Annex 5 - Working document towards a preliminary draft revision of Report ITU-R SM.2352-1 - Technology trends of active services in the frequency range 275-3 000 GHz

Word  

19800132 bytes 2026-06-25 [145] Annex 4 - Working document towards a preliminary draft revision of Report ITU-R SM.2449-1 - Impact analyses of non-beam magnetic inductive and magnetic resonant wireless power transmission for mobile and portable devices on radiocommunication services

Word  

50495 bytes 2026-06-25 [145] Annex 3 - Working document towards a preliminary draft revision of Recommendation ITU-R SM.2129-1 - Guidance on frequency ranges for the operation of non-beam wireless power transmission for mobile and portable devices

Word  

41564954 bytes 2026-06-25 [145] Annex 2 - Preliminary draft revision of REPORT ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz

Word  

155873 bytes 2026-06-24 [145] Annex 1 - Draft CPM text on item 2.2 of the WRC-31 preliminary agenda, for Section A1/2.2 of the draft CPM Report to WRC-27

Word  

137057 bytes 2026-07-08 [145]  - Report of the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)
 

Document :

ITU-R R23-WP1A  Contribution  145

Title :

Report on the third 2023-2027 meeting of Working Party 1A (Geneva, 3-10 June 2026)

Date :

2026-06-11

Source :

Chair, WP 1A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-07-08