Contributions  |
|
Number
|
Title
|
Source
|
Date
|
|
[ 89 ]
|
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 11 June 2026)
|
Chair, SG 1
|
2026-06-11 |
|
[ 88 ]
|
Final list of participants - Study Group 1 (Geneva, 11 June 2026)
|
Director, BR
|
2026-06-11 |
|
[ 87 ]
|
List of documents issued (Documents 1/58 - 1/87)
|
BR, Study Groups Department
|
2026-06-11 |
|
[ 86 ]
|
Draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam
|
WP 1A
|
2026-06-10 |
|
[ 85 ]
|
Draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks
|
WP 1A
|
2026-06-10 |
|
[ 84 ]
|
Draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam
|
WP 1A
|
2026-06-10 |
|
[ 83 ]
|
Draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications
|
WP 1A
|
2026-06-10 |
|
[ 82 ]
|
Executive Report to Study Group 1 (Working Party 1C meeting in Geneva, Switzerland, 3-10 June 2026)
|
Chair, WP 1C
|
2026-06-10 |
|
[ 81 ]
|
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 3-10 June 2026)
|
Chair, WP 1B
|
2026-06-10 |
|
[ 80 ]
|
Executive Report to Study Group 1 (Working Party 1A meeting in Geneva, Switzerland, 3-10 June 2026
|
Chair, WP 1A
|
2026-06-10 |
|
[ 79 ]
|
Draft revision of Report ITU-R SM.2256-1 - Spectrum occupancy measurements and evaluation
|
WP 1C
|
2026-06-10 |
|
[ 78 ]
|
Draft revision of Report ITU-R SM.2542-0 - Next generation spectrum monitoring - Proactive, autonomous and data-driven
|
WP 1C
|
2026-06-10 |
|
[ 77 ]
|
Draft revision of Recommendation ITU-R SM.443-4 - Bandwidth measurement at monitoring stations
|
WP 1C
|
2026-06-10 |
|
[ 76 ]
|
Draft revision of Recommendation ITU-R SM.1880-2 - Spectrum occupancy measurement and evaluation
|
WP 1C
|
2026-06-10 |
|
[ 75 ]
|
Assignment of texts to the Study Group 1 sub-groups
|
WP 1B
|
2026-06-10 |
|
[ 74 ]
|
Draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
WP 1B
|
2026-06-10 |
|
[ 73 ]
|
Draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices
|
WP 1B
|
2026-06-10 |
|
[ 72 ]
|
Draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices
|
WP 1B
|
2026-06-10 |
|
[ 71 ]
|
Draft new Report ITU-R SM.[TRP_MEAS] - Assessment of Total Radiated Power (TRP) by measurements of e.i.r.p. in the field
|
WP 1C
|
2026-06-09 |
|
[ 70 ]
|
Reply liaison statement from ITU-R Study Group 4 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 5, 6, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"
|
SG 4
|
2026-06-09 |
|
[ 69 ]
|
Draft revision of the 2011 edition of the ITU Spectrum Monitoring Handbook
|
WP 1C
|
2026-06-09 |
|
[ 68 ]
(Rev.1) |
Report on the CCT activities from June 2025 to May 2026 on topics related to Study Group 1 and its Working Parties
|
SG 1 Liaison Rapporteur to CCV
|
2026-06-02 |
|
[ 67 ]
|
Report on CISPR activities from June 2025 to May 2026
|
SG 1 Rapp. to CISPR on WPT issues
|
2026-06-01 |
|
[ 66 ]
|
Draft liaison statement to the ITU Coordination Committee for Terminology (ITU CCT), ITU-T Study Group 5, ITU-R Study Group 1 and ITU-R Working Parties 3J, 3L and 3M - Definitions: Published English terms for validation sent to the CCT
|
ATDI
|
2026-05-25 |
|
[ 65 ]
|
Liaison statement from CISPR/H to relevant Working Parties of ITU-R Study Group 1 and Study Group 3 on maintenance of the radio services database
|
IEC CISPR
|
2026-04-28 |
|
[ 64 ]
|
Reply liaison statement from ITU-R Study Group 6 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 4, 5, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"
|
SG 6
|
2026-03-31 |
|
[ 63 ]
|
Liaison statement on invitation to nominate representatives to ITU-T JCA-MV and provide input to the Metaverse Standardization Roadmap
|
ITU-T JCA-MV
|
2025-12-02 |
|
[ 62 ]
|
Reply liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
|
ITU-T SG15
|
2025-11-19 |
|
[ 61 ]
|
Reply liaison statement from ITU-R Working Party 6A to CISPR/H (copy for information to ITU-R Study Group 1 and Working Party 1A) - Protection of broadcasting services in the radio services database
|
WP 6A
|
2025-09-16 |
|
[ 60 ]
|
Liaison letter from CISPR/H to ITU-R
|
International Special Committee on Radio Interference
|
2025-08-18 |
|
[ 59 ]
|
Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Groups 1 and 4, and to ITU-R Working Parties 4A, 4C and 1C for information) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators
|
WP 1B
|
2025-06-23 |
|
[ 58 ]
|
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 19 June 2025)
|
Chair, SG 1
|
2025-06-19 |
|
[ 57 ]
|
Final list of participants - Study Group 1 (Geneva, 19 June 2025)
|
Director, BR
|
2025-06-19 |
|
[ 56 ]
|
List of documents issued (Documents 1/27 - 1/56)
|
BR, Study Groups Department
|
2025-06-19 |
|
[ 55 ]
|
Executive Report to Study Group 1 (Working Party 1C meeting in Geneva, Switzerland, 9-18 June 2025)
|
Chair, WP 1C
|
2025-06-18 |
|
[ 54 ]
|
Executive Report to Study Group 1 (Working Party 1A meeting in Geneva, Switzerland, 11-18 June 2025)
|
Chair, WP 1A
|
2025-06-18 |
|
[ 53 ]
|
Draft editorial revision of Recommendation ITU-R SM.337-6 - Frequency and distance separations
|
WP 1A
|
2025-06-18 |
|
[ 52 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles
|
WP 1A
|
2025-06-18 |
|
[ 51 ]
|
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 11-18 June 2025)
|
Chair, WP 1B
|
2025-06-18 |
|
[ 50 ]
|
Report on the CCT activities from June 2024 to June 2025 on topics related to Study Group 1 and its Working Parties
|
SG 1 Liaison Rapporteur to CCV
|
2025-06-18 |
|
[ 49 ]
|
Draft revision of Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions
|
WP 1A
|
2025-06-18 |
|
[ 48 ]
(Rev.1) |
Draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
WP 1B
|
2025-06-16 |
|
[ 47 ]
|
Report on CISPR activities from June 2024 to June 2025 on WPT issues
|
SG 1 Rapp. to CISPR on WPT issues
|
2025-06-09 |
|
[ 46 ]
|
Liaison statement on the activities and studies on sustainable digital transformation
|
TSAG
|
2025-06-03 |
|
[ 45 ]
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
Director, BR
|
2025-05-23 |
|
[ 44 ]
|
Liaison statement to ITU-R Study Groups 1 and 3 (copy to ITU-R Working Parties 1C and 3J, ITU-T Study Group 5) - Request of feedback on terms and definitions proposed by ITU-T Study Group 5 and submitted to the CCT for validation
|
CCT
|
2025-05-21 |
|
[ 43 ]
|
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)
|
WP 4A
|
2025-05-20 |
|
[ 42 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-T Study Group 21 and ITU-R Study Group 1 on strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration to and adoption...
|
ITU-D SG1
|
2025-05-14 |
|
[ 41 ]
(Rev.1) |
Liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
2025-04-11 |
|
[ 40 ]
|
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services
|
ITU-T SG3
|
2025-05-02 |
Results:89 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):