International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG01  C 

ITU-R SG01

Spectrum Management

Results:89 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 89 ]  
 
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 11 June 2026)     Chair, SG 1   2026-06-11
[ 88 ]  
 
Final list of participants - Study Group 1 (Geneva, 11 June 2026)     Director, BR   2026-06-11
[ 87 ]  
 
List of documents issued (Documents 1/58 - 1/87)     BR, Study Groups Department   2026-06-11
[ 86 ]  
 
Draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam     WP 1A   2026-06-10
[ 85 ]  
 
Draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks     WP 1A   2026-06-10
[ 84 ]  
 
Draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam     WP 1A   2026-06-10
[ 83 ]  
 
Draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications     WP 1A   2026-06-10
[ 82 ]  
 
Executive Report to Study Group 1 (Working Party 1C meeting in Geneva, Switzerland, 3-10 June 2026)     Chair, WP 1C   2026-06-10
[ 81 ]  
 
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 3-10 June 2026)     Chair, WP 1B   2026-06-10
[ 80 ]  
 
Executive Report to Study Group 1 (Working Party 1A meeting in Geneva, Switzerland, 3-10 June 2026     Chair, WP 1A   2026-06-10
[ 79 ]  
 
Draft revision of Report ITU-R SM.2256-1 - Spectrum occupancy measurements and evaluation     WP 1C   2026-06-10
[ 78 ]  
 
Draft revision of Report ITU-R SM.2542-0 - Next generation spectrum monitoring - Proactive, autonomous and data-driven     WP 1C   2026-06-10
[ 77 ]  
 
Draft revision of Recommendation ITU-R SM.443-4 - Bandwidth measurement at monitoring stations     WP 1C   2026-06-10
[ 76 ]  
 
Draft revision of Recommendation ITU-R SM.1880-2 - Spectrum occupancy measurement and evaluation     WP 1C   2026-06-10
[ 75 ]  
 
Assignment of texts to the Study Group 1 sub-groups     WP 1B   2026-06-10
[ 74 ]  
 
Draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     WP 1B   2026-06-10
[ 73 ]  
 
Draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     WP 1B   2026-06-10
[ 72 ]  
 
Draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     WP 1B   2026-06-10
[ 71 ]  
 
Draft new Report ITU-R SM.[TRP_MEAS] - Assessment of Total Radiated Power (TRP) by measurements of e.i.r.p. in the field     WP 1C   2026-06-09
[ 70 ]  
 
Reply liaison statement from ITU-R Study Group 4 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 5, 6, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"     SG 4   2026-06-09
[ 69 ]  
 
Draft revision of the 2011 edition of the ITU Spectrum Monitoring Handbook     WP 1C   2026-06-09
[ 68 ]  
(Rev.1) 
Report on the CCT activities from June 2025 to May 2026 on topics related to Study Group 1 and its Working Parties     SG 1 Liaison Rapporteur to CCV   2026-06-02
[ 67 ]  
 
Report on CISPR activities from June 2025 to May 2026     SG 1 Rapp. to CISPR on WPT issues   2026-06-01
[ 66 ]  
 
Draft liaison statement to the ITU Coordination Committee for Terminology (ITU CCT), ITU-T Study Group 5, ITU-R Study Group 1 and ITU-R Working Parties 3J, 3L and 3M - Definitions: Published English terms for validation sent to the CCT     ATDI   2026-05-25
[ 65 ]  
 
Liaison statement from CISPR/H to relevant Working Parties of ITU-R Study Group 1 and Study Group 3 on maintenance of the radio services database     IEC CISPR   2026-04-28
[ 64 ]  
 
Reply liaison statement from ITU-R Study Group 6 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 4, 5, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"     SG 6   2026-03-31
[ 63 ]  
 
Liaison statement on invitation to nominate representatives to ITU-T JCA-MV and provide input to the Metaverse Standardization Roadmap     ITU-T JCA-MV   2025-12-02
[ 62 ]  
 
Reply liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans     ITU-T SG15   2025-11-19
[ 61 ]  
 
Reply liaison statement from ITU-R Working Party 6A to CISPR/H (copy for information to ITU-R Study Group 1 and Working Party 1A) - Protection of broadcasting services in the radio services database     WP 6A   2025-09-16
[ 60 ]  
 
Liaison letter from CISPR/H to ITU-R     International Special Committee on Radio Interference   2025-08-18
[ 59 ]  
 
Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Groups 1 and 4, and to ITU-R Working Parties 4A, 4C and 1C for information) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     WP 1B   2025-06-23
[ 58 ]  
 
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 19 June 2025)     Chair, SG 1   2025-06-19
[ 57 ]  
 
Final list of participants - Study Group 1 (Geneva, 19 June 2025)     Director, BR   2025-06-19
[ 56 ]  
 
List of documents issued (Documents 1/27 - 1/56)     BR, Study Groups Department   2025-06-19
[ 55 ]  
 
Executive Report to Study Group 1 (Working Party 1C meeting in Geneva, Switzerland, 9-18 June 2025)     Chair, WP 1C   2025-06-18
[ 54 ]  
 
Executive Report to Study Group 1 (Working Party 1A meeting in Geneva, Switzerland, 11-18 June 2025)     Chair, WP 1A   2025-06-18
[ 53 ]  
 
Draft editorial revision of Recommendation ITU-R SM.337-6 - Frequency and distance separations     WP 1A   2025-06-18
[ 52 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles     WP 1A   2025-06-18
[ 51 ]  
 
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 11-18 June 2025)     Chair, WP 1B   2025-06-18
[ 50 ]  
 
Report on the CCT activities from June 2024 to June 2025 on topics related to Study Group 1 and its Working Parties     SG 1 Liaison Rapporteur to CCV   2025-06-18
[ 49 ]  
 
Draft revision of Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions     WP 1A   2025-06-18
[ 48 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     WP 1B   2025-06-16
[ 47 ]  
 
Report on CISPR activities from June 2024 to June 2025 on WPT issues     SG 1 Rapp. to CISPR on WPT issues   2025-06-09
[ 46 ]  
 
Liaison statement on the activities and studies on sustainable digital transformation     TSAG   2025-06-03
[ 45 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR   2025-05-23
[ 44 ]  
 
Liaison statement to ITU-R Study Groups 1 and 3 (copy to ITU-R Working Parties 1C and 3J, ITU-T Study Group 5) - Request of feedback on terms and definitions proposed by ITU-T Study Group 5 and submitted to the CCT for validation     CCT   2025-05-21
[ 43 ]  
 
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)     WP 4A   2025-05-20
[ 42 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-T Study Group 21 and ITU-R Study Group 1 on strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration to and adoption...     ITU-D SG1   2025-05-14
[ 41 ]  
(Rev.1) 
Liaison statement on free-space optics systems related aspects for G.fso     ITU-T SG15   2025-04-11
[ 40 ]  
 
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services     ITU-T SG3   2025-05-02
Results:89 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-06-11