International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-SG01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-SG01  C 

ITU-R R23-SG01

Spectrum Management

Results:40 total items.
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 40 ]  
 
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services     ITU-T SG3   2025-05-02
[ 39 ]  
 
Liaison statement on satellite to satellite free space optical communication     ITU-T SG15   2025-04-15
[ 38 ]  
 
Liaison statement on the latest updates of access network transport (ANT) and home network transport (HNT) standards overviews and work plans     IUT-T SG15   2025-04-08
[ 37 ]  
 
Response liaison statement on the UAV definitions     ITU-T SG 2   2025-02-21
[ 36 ]  
 
Response liaison statement on request for input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the context of indoor coverage technologies     ITU-T SG2   2025-02-21
[ 35 ]  
 
Liaison letter from CISPR/H to ITU-R on CISPR 12 to Ed7.0     International Special Committee on Radio Interference   2025-01-13
[ 34 ]  
 
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 5-8 November 2024)     Chair, WP 1B   2024-11-21
[ 33 ]  
 
Liaison statement to CISPR/H (copy for information to ITU-R Study Group 1 and Working Parties 1A, 5A and 7A) - Update to broadcasting services protection requirements in the CISPR radio services database     WP 6A   2024-11-18
[ 32 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2015-2 - Methods for determining national long-term strategies for spectrum utilization     WP 1B   2024-11-18
[ 31 ]  
 
Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Group 1 and RAG) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     SG 4   2024-11-08
[ 30 ]  
 
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     ITU-T SG3   2024-07-19
[ 29 ]  
 
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan     ITU-T SG15   2024-07-19
[ 28 ]  
 
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan     ITU-T SG15   2024-07-19
[ 27 ]  
(Rev.1) 
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 20 June 2024)     Chair, SG 1   2024-06-21
[ 26 ]  
 
Final list of participants - Study Group 1 (Geneva, 20 June 2024)     Director, BR   2024-06-21
[ 25 ]  
 
Executive Report of June 2024 meeting of Working Party 1C (12-19 June 2024)     Acting Chair, WP 1C   2024-06-19
[ 24 ]  
 
Executive Report of June 2024 meeting of Working Party 1B (12-19 June 2024)     Acting Chair, WP 1B   2024-06-19
[ 23 ]  
 
Executive Report of June 2024 meeting of Working Party 1A (12-19 June 2024)     Acting Chair, WP 1A   2024-06-19
[ 22 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2449-0 - Impact analyses of non-beam inductive wireless power transmission for mobile and portable devices on radiocommunication services     WP 1A   2024-06-19
[ 21 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.2129-0 - Guidance on frequency ranges for operation of non-beam wireless power transmission systems for mobile and portable devices     WP 1A   2024-06-19
[ 20 ]  
(Rev.1) 
Draft new Report ITU-R SM.[AI AND BIG DATA] - Next generation Spectrum Monitoring - Proactive, Autonomous, and Data-Driven     WP 1C   2024-06-19
[ 19 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks     WP 1C   2024-06-19
[ 18 ]  
(Rev.1) 
Draft editorial revision of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     WP 1B   2024-06-18
[ 17 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.329-12 - Unwanted emissions in the spurious domain     WP 1A   2024-06-18
[ 16 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain     WP 1A   2024-06-18
[ 15 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1539-1 - Variation of the boundary between the out-of-band and spurious domains required for the application of Recommendations ITU-R SM.1541 and ITU R SM.329     WP 1A   2024-06-18
[ 14 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.853-1 - Necessary bandwidth     WP 1A   2024-06-18
[ 13 ]  
 
Proposed organization of the work of the Study Group 1 during 2023-2027 Study cycle     Chair, SG 1   2024-06-12
[ 12 ]  
 
Report on CISPR activities from June 2023 to June 2024     Rapporteur, SG 1 RG on Liaison with CISPR , Rapporteur to CISPR on WPT issues   2024-06-10
[ 11 ]  
 
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74     SG 4   2024-05-13
[ 10 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV   2024-04-22
[ 9 ]  
 
Liaison statement on terms contained in ITU-T Study Group 5 draft recommendations     SCV/CCT   2024-02-19
[ 8 ]  
(Rev.1) 
Summary of the main results of RA-23 and CPM27-1 related to Study Group 1     Chair, SG 1   2024-02-05
[ 7 ]  
(Rev.1) 
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV     Director, BR   2024-01-26
[ 6 ]  
 
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairs, SGs 1, 5 & 7   2024-01-22
[ 5 ]  
 
Liaison statement on the activities and studies on sustainable digital transformation     ITU-T SG5   2023-12-21
[ 4 ]  
 
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan     ITU-T SG15   2023-12-21
[ 3 ]  
 
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan     ITU-T SG15   2023-12-21
[ 2 ]  
 
Documents to be carried over from the 2019-2023 study period     SG 1   2023-11-22
[ 1 ]  
(Rev.1) 
Assignment of texts to the Study Group 1 Sub-Groups     Chair, SG 1   2023-11-22
Results:40 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-05-02