International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : RRB22.1 : Contributions : 8 Recently posted -  Search Meeting Documents
   
[8]  Submission by the Administration of Papua New Guinea requesting the extension of the regulatory time limit to bring back into use the frequency assignments to the NEW DAWN 25 satellite network

Format

Size

Posted

English

PDF (acrobat)  

2815245 bytes 2022-03-03 [8] 

Word  

1591964 bytes 2022-03-03 [8] 
Arabic

Word  

194660 bytes 2022-03-07 [8] 

PDF (acrobat)  

418714 bytes 2022-03-07 [8] 
Chinese

PDF (acrobat)  

549231 bytes 2022-03-03 [8] 

Word  

236349 bytes 2022-03-03 [8] 
Español

PDF (acrobat)  

435255 bytes 2022-03-03 [8] 

Word  

63010 bytes 2022-03-03 [8] 
Français

PDF (acrobat)  

456726 bytes 2022-03-03 [8] 

Word  

107157 bytes 2022-03-03 [8] 
Russian

PDF (acrobat)  

329947 bytes 2022-03-07 [8] 

Word  

95648 bytes 2022-03-07 [8] 
 

Document :

ITU-R RRB22.1  Contribution  8

Title :

Submission by the Administration of Papua New Guinea requesting the extension of the regulatory time limit to bring back into use the frequency assignments to the NEW DAWN 25 satellite network

Date :

2022-02-17

Source :

Director, BR

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-03-07