International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D Recently posted -  Search Meeting Documents
   
ITU-R WP5D Meeting Documents
  Max # of documents displayed/page:
Results: 59 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 563 ]  2021-04-23 WP 7C   Liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4?, 4?, 5A, 5?, 5C and 7B for information) - WRC-23 agenda item 1.2 - Additional information on EESS (passive) in 10.6-10.7 GHz     AI1.2  
  [ 563 ]  - English -  Word 2021-04-23 [16:51]  33'517  bytes  
 
[ 562 ]  2021-04-19 WP 7D   Liaison statement to Working Party 5D - Update to working document towards a preliminary draft new - Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     N/A  
  [ 562 ]  - English -  Word 2021-04-19 [12:49]  32'132  bytes  
 
[ 561 ]  2021-04-16 WP 7D   Reply liaison statement to Working Party 5D - WRC-23 agenda item 1.2     AI1.2  
  [ 561 ]  - English -  Word 2021-04-16 [08:30]  32'303  bytes  
 
[ 560 ]  2021-04-15 WP 7B   Reply liaison statement to Working Party 5D (copy to Working Parties 3K and 3M for information) - Draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     N/A  
  [ 560 ]  - English -  Word 2021-04-15 [13:25]  44'474  bytes  
 
[ 559 ]  2021-04-15 WP 7B   Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 7C and 7D for information) - Reply liaison statement to Working Party 5D concerning WRC-23 agenda item 1.2     AI1.2  
  [ 559 ]  - English -  Word 2021-04-15 [17:18]  43'706  bytes  
 
[ 558 ]  2021-04-15 WP 7B   Reply liaison statement to Working Party 5D - Characteristics for studies on WRC-23 agenda item 1.4     AI1.4  
  [ 558 ]  - English -  Word 2021-04-16 [14:10]  46'302  bytes  
 
[ 557 ]  2021-04-14 ITU-D SG 2   Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Parties 5A and 5D on the output Report on Question 2/2 - ITU-D Study Group 2 Question 5/2: Utilizing telecommunications/ICTs for disaster risk reduction and management     N/A  
  [ 557 ]  - English -  Word 2021-04-14 [08:39]  36'615  bytes  
 
[ 556 ]  2021-04-14 ITU-D SG 2   Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-R Working Party 5D on output Report of ITU-D Question 2/2 - ITU-D Study Group 2 Question 2/2: Telecommunications/ICTs for e-Health     N/A  
  [ 556 ]  - English -  Word 2021-04-14 [08:21]  36'979  bytes  
 
[ 545 ]  2021-03-12 Chairman, WP 5D   Report on the 37th meeting of Working Party 5D (e-Meeting, 1-12 March 2021)     N/A  
  [ 545 ] Chapter 01 - English -  Word 2021-04-13 [11:46]  166'947  bytes Report on the 37th meeting of Working Party 5D (e-Meeting, 1-12 March 2021)  
  [ 545 ] Chapter 06 - English -  Word 2021-04-01 [08:11]  32'641  bytes Ad-hoc Workplan  
  [ 545 ] Chapter 04 - English -  Word 2021-03-31 [19:36]  19'393'190  bytes Meeting Report of Spectrum Aspects and WRC-23 Preparations  
  [ 545 ] Chapter 07 - English -  Word 2021-03-31 [19:26]  2'661'452  bytes General matters  
  [ 545 ] Chapter 03 - English -  Word 2021-03-31 [19:07]  302'165  bytes Meeting Report of Working Group General Aspects  
  [ 545 ] Chapter 02 - English -  Word 2021-03-31 [19:06]  1'158'265  bytes ITU-R Working Party 5D Structure and Workplan  
  [ 545 ] Chapter 05 - English -  Word 2021-03-31 [19:04]  2'704'991  bytes Meeting Report of Working Group Technology Aspects  
 
[ 555 ]  2021-04-09 ITU-T SG 11   Reply liaison statement on guideline for general test procedure and specification for measurements of the LTE, 3G/2G user equipment/mobile stations (UE/MS) for over the air performance testing     N/A  
  [ 555 ] Part 1 - English -  PDF (acrobat) 2021-04-09 [08:55]  797'966  bytes  
  [ 555 ]  - English -  Word 2021-04-09 [08:53]  3'766'469  bytes  
 
[ 554 ]  2021-04-07 WP 6A   Liaison statement to Working Party 5D (copy to Working Parties 3K, 3L, 3M, 5A, and 5B) - WRC-23 agenda item 1.4     AI1.4  
  [ 554 ]  - English -  Word 2021-04-07 [13:42]  35'274  bytes  
 
[ 553 ]  2021-04-07 International Amateur Radio Union   Preliminary positions on WRC-23 agenda     AI1.12, AI1.14, AI1.18, AI1.2, AI9.1A), AI9.1B)  
  [ 553 ]  - English -  Word 2021-04-07 [10:47]  40'831  bytes  
 
[ 552 ]  2021-03-30 ITU-D SG 1   Liaison statement from ITU-D Study Group 1 Question 1/1 and Question 5/1 to ITU-R Study Group 5 Working Parties 5D and 5A on collaboration     N/A  
  [ 552 ]  - English -  Word 2021-03-30 [16:51]  39'025  bytes  
 
[ 549 ]  2021-03-29 ETSI TC ITS   Open contribution or review of final multi-channel operations study results, final draft ETSI TR 103 439 from ETSI TC ITS - Intelligent transport systems (ITS); Multi-channel operation study; Release 2     N/A  
  [ 549 ]  - English -  Word 2021-03-29 [14:02]  41'420  bytes  
 
[ 551 ]  2021-03-29 Director, BR   Reply liaison statement on test methods for over-the-air TRP field measurements of unwanted emissions from IMT radio equipment utilizing active antennas     N/A  
  [ 551 ]  - English -  Word 2021-03-29 [14:30]  33'273  bytes  
 
[ 550 ]  2021-03-29 Director, BR   Liaison to Working Party 4B on the integration of satellite solutions into 5G networks (copy to Working Party 5D)     AI8.5  
  [ 550 ]  - English -  Word 2021-03-29 [14:21]  33'757  bytes  
 
[ 548 ]  2021-03-26 FG-AI4NDM   Liaison statement on invitation to provide inputs to the roadmap of AI activities for natural disaster management     N/A  
  [ 548 ]  - English -  Word 2021-03-26 [17:17]  37'439  bytes  
 
[ 547 ]  2021-03-22 3GPP TSG RAN WG4   Reply liaison statement on parameters of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-23 (6.425 TO 10.5 GHz)     N/A  
  [ 547 ]  - English -  Word 2021-03-25 [16:59]  68'175  bytes  
 
[ 546 ]  2021-03-17 World Meteorological Organization   Preliminary position on WRC-23 agenda     N/A  
  [ 546 ]  - English -  Word 2021-03-18 [11:01]  86'842  bytes  
 
[ ADM 134 ]  2021-03-12 Chairman, WP 5D   Agenda for the Closing Plenary of the 37th-e meeting of Working Party 5D - Friday, 12 March 2021 at 1200 hours (CET) (e-Meeting)     N/A  
  [ ADM 134 ]  - English -  Word 2021-03-12 [11:50]  65'104  bytes  
 
[ 544 ]  2021-03-12 Director, BR   Final list of participants - Working Party 5D (e-Meeting, 1-12 March 2021)     N/A  
  [ 544 ]  - English -  PDF (acrobat) 2021-03-12 [16:45]  181'223  bytes  
 
[ ADM 131 ]  2021-03-11 Chairman, WG Technology Aspects   Draft agenda for the final meeting of Working Group Technology Aspects - Thursday, 11 March 2021, at 1200 hours (Virtual meeting - Vroom 4)     N/A  
  [ ADM 131 ] Revision 1 - English -  Word 2021-03-11 [17:47]  45'776  bytes  
 
[ ADM 133 ]  2021-03-11 Chairman, WG Spectrum Aspects & WRC-23 Preparation   Draft agenda of the 2nd meeting of WG Spectrum Aspects & WRC-23 Preparations - Thursday, 11 March 2021 from 1330 to 1610 hours (Virtual meeting, V-Room 5)     N/A  
  [ ADM 133 ]  - English -  Word 2021-03-11 [12:15]  50'090  bytes  
 
[ ADM 132 ]  2021-03-11 Chairman, SWG Sharing Studies   Draft agenda for the 8th meeting of SWG Sharing Studies - Wednesday, 11 March 2021, Period 1 (1200-1310 CET) (Virtual - V Room 5)     N/A  
  [ ADM 132 ]  - English -  Word 2021-03-11 [10:33]  33'489  bytes  
 
[ ADM 130 ]  2021-03-10 Chairman, WG General Aspects   Agenda of the 2nd meeting of Working Group General Aspects - Wednesday, 10 March 2021 from 1500 to 1610 hours (CET) (V-meeting - Room 4)     N/A  
  [ ADM 130 ] Revision 1 - English -  Word 2021-03-10 [18:35]  40'432  bytes  
 
[ ADM 129 ]  2021-03-10 Chairman, SWG Sharing Studies   Draft agenda for the 6th and 7th meetings of SWG Sharing Studies - Wednesday, 10 March 2021, Period 1 (1200-1310 CET) Wednesday, 10 March 2021, Period 3 (following SWG AI 1.4 and until 1610 CET) (Virtual - V Room 5)     N/A  
  [ ADM 129 ]  - English -  Word 2021-03-10 [11:17]  36'885  bytes  
 
[ ADM 128 ]  2021-03-10 Chairman, SWG WRC-23 AI 1.2   Draft agenda of the 2nd meeting of Sub-Working Group WRC-23 agenda item 1.2 - Wednesday, 10 March 2021 at 1330 hours, Period 2 (GoToWebinar - V Room 5)     N/A  
  [ ADM 128 ]  - English -  Word 2021-03-10 [11:13]  47'368  bytes  
 
[ ADM 127 ]  2021-03-10 Chairman, SWG Frequency Arrangements   Draft agenda for the 2nd meeting of Sub-Working Group Frequency Arrangements - Tuesday, 9 March 2021, Period 2 (1330-1440 CET) (V-Room 5)     N/A  
  [ ADM 127 ]  - English -  Word 2021-03-10 [08:09]  36'151  bytes  
 
[ ADM 126 ]  2021-03-09 Chairman, TECH SWG OOBE   Agenda for Sub-Working Group OOBE (2nd Meeting) - Wednesday, 10 March 2020 from 1200 to 1310 hours (CET) (V-Room 4)     N/A  
  [ ADM 126 ]  - English -  Word 2021-03-09 [16:27]  32'827  bytes  
 
[ 360 ]  2020-10-16 Chairman, WP 5D   Report on the thirty-sixth meeting of Working Party 5D (E-meeting, 5-16 October 2020)     N/A  
  [ 360 ] Chapter 06 - English -  Word 2021-03-09 [15:46]  131'156  bytes Meeting Report of Ad-Hoc Workplan  
  [ 360 ] Chapter 01 Revision 1 - English -  Word 2021-03-08 [18:46]  172'492  bytes Report on the thirty-sixth meeting of Working Party 5D (e-meeting, 5-16 October 2020)  
  [ 360 ] Chapter 04 Revision 1 - English -  Word 2021-03-08 [18:32]  17'606'118  bytes Meeting Report of Working Group Spectrum Aspects and WRC-23 Preparations  
 
[ ADM 125 ]  2021-03-09 Sub-Working Group WRC-23 a.i. 1.1   Draft agenda of the 2nd meeting of Sub-Working Group WRC-23 a.i. 1.1, Tuesday, 9 March 2021: 15:00 - 16:10 (CET) (GoToWebinar - Vroom 5)     N/A  
  [ ADM 125 ]  - English -  Word 2021-03-09 [14:38]  45'623  bytes  
 
[ ADM 102 ]  2021-02-25 WP 5D   Provisional schedule for the 37th meeting of Working Party 5D - 1-12 March 2021 - Virtual meeting (GoToWebinar)     N/A  
  [ ADM 102 ] Revision 6 - English -  Word 2021-03-09 [08:30]  55'944  bytes  
 
[ ADM 124 ]  2021-03-08 Chairman, AH Workplan   Agenda for Ad Hoc Workplan - Tuesday, 9 March 2021, from 1330 to 1440 hours (Virtual Meeting Room 4)     N/A  
  [ ADM 124 ]  - English -  Word 2021-03-08 [09:41]  33'741  bytes  
 
[ ADM 114 ]  2021-03-02 Chairman, SWG Vision   Agenda for SWG Vision - Thursday, 4 March 2021, Period 1 (1200-1310 CET) - Friday, 5 March 2021, Period 2 (1330-1440 CET) (Virtual - V Room 4)     N/A  
  [ ADM 114 ] Revision 2 - English -  Word 2021-03-08 [09:28]  39'903  bytes  
 
[ ADM 123 ]  2021-03-08 Chairman, SWG PPDR   Draft agenda of the 2nd meeting of Sub-Working Group PPDR - Monday, 8 March 2021 from 1330 to 1440 hours (Virtual Room 4)     N/A  
  [ ADM 123 ]  - English -  Word 2021-03-08 [08:14]  33'997  bytes  
 
[ ADM 122 ]  2021-03-08 Chairman, SWG Radio Aspects   Agenda for 5th meeting of Technology Aspects, Sub-Working Group Radio Aspects - Monday, 8 March 2021, from 1500 to 1610 hours (CET) (Virtual meeting, Room 4)     N/A  
  [ ADM 122 ]  - English -  Word 2021-03-08 [08:09]  36'544  bytes  
 
[ ADM 121 ]  2021-03-05 Chairman, SWG Sharing Studies   Draft agenda for the 5th meeting of Sub-Working Group Sharing Studies - Friday, 5 March 2021, Period 3 (1500-1610 CET) (Virtual - V Room 6)     N/A  
  [ ADM 121 ]  - English -  Word 2021-03-05 [08:09]  32'347  bytes  
 
[ ADM 119 ]  2021-03-04 Chairman, SWG Frequency Arrangements   Draft agenda for the 1st meeting of Sub-Working Group Frequency Arrangements - Thursday, 4 March 2021, Period 2 (1330-1440 CET) (V Room 5)     N/A  
  [ ADM 119 ]  - English -  Word 2021-03-04 [09:07]  37'181  bytes  
 
[ ADM 120 ]  2021-03-04 Chairman, SWG Sharing Studies   Draft agenda for the 4th meeting of Sub-Working Group Sharing Studies - Thursday, 4 March 2021, Period 1 from 1200 hours followed by DG Article 21.5 (Virtual - V Room 5)     N/A  
  [ ADM 120 ]  - English -  Word 2021-03-04 [08:58]  33'356  bytes  
 
[ 543 ]  2021-03-03 ASMG Rapporteur   Update on activities in ASMG     N/A  
  [ 543 ]  - English -  Word 2021-03-03 [13:12]  327'112  bytes  
 
[ ADM 118 ]  2021-03-03 Chairman, SWG WRC-23 AI 1.1   Draft agenda of the first meeting of Sub-Working Group WRC-23 agenda item 1.1 - Wednesday, 3 March 2021: 15:00 - 16:10 (CET) - (GoToWebinar - V-Room 5)     N/A  
  [ ADM 118 ]  - English -  Word 2021-03-03 [10:06]  49'314  bytes  
Results: 59 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-04-23