International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions : 1668 Recently posted -  Search Meeting Documents
   
[1668]  Report on the 43rd meeting of Working Party 5D (Geneva, 31 January - 9 February 2023)

Format

Size

Posted

English

Word  

15283680 bytes 2023-03-10 [1668] Chapter 7 - General matters

Word  

32250 bytes 2023-02-23 [1668] Chapter 6 - Meeting Report of AD HOC Workplan

Word  

38370 bytes 2023-03-14 [1668] Chapter 5 - Meeting Report of Working Group Technology Aspects

PowerPoint 2007  

55551 bytes 2023-02-14 [1668] Chapter 5 - Annex 5.1 Part 1

Word  

93687 bytes 2023-02-14 [1668] Chapter 5 - Annex 5.1 - Meeting Report of Sub-Working Group IMT Specifications

Word  

7763638 bytes 2023-02-15 [1668] Chapter 5 - Annex 5.2 - Preliminary draft revision of Recommendation ITU-R M.2150-1 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)

Word  

2386469 bytes 2023-02-15 [1668] Chapter 5 - Annex 5.3 - Preliminary draft revision of Recommendation ITU-R M.2012-5 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced)

Word  

40167 bytes 2023-02-14 [1668] Chapter 5 - Annex 5.4 - Meeting Report of Sub-Working Group Radio Aspects

Word  

26757295 bytes 2023-03-10 [1668] Chapter 5 - Annex 5.5 - [Working document towards a] preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz

Word  

31962 bytes 2023-02-14 [1668] Chapter 5 - Annex 5.6 - Draft summary of Report ITU-R M.[IMT.ABOVE 100GHz] for Sub-Working Group IMT-2030

Word  

35307 bytes 2023-02-16 [1668] Chapter 5 - Annex 5.7 - Meeting Report of Sub-Working Group OOBE

Word  

754968 bytes 2023-02-16 [1668] Chapter 5 - Annex 5.8 - Preliminary draft revision of Recommendation ITU-M.2070-1 - [Generic] unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT Advanced

Word  

760267 bytes 2023-02-15 [1668] Chapter 5 - Annex 5.9 - Preliminary draft revision of Recommendation ITU-R M.2071-1 - [Generic] unwanted emission characteristics of mobile stations using the terrestrial radio interfaces of IMT -Advanced

Word  

378489 bytes 2023-02-15 [1668] Chapter 5 - Annex 5.10 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] - [Generic] unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020

Word  

249421 bytes 2023-02-15 [1668] Chapter 5 - Annex 5.11 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] - Generic unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020

Word  

52855 bytes 2023-02-23 [1668] Chapter 4 - Meeting Report of Working Group Spectrum Aspects and WRC-23 Preparation

Word  

33889 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.1 - Meeting Report of Sub-Working Group Frequency Arrangements

Word  

1260194 bytes 2023-02-16 [1668] Chapter 4 - Annex 4.2 - [Preliminary] draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations

Word  

40008 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.3 - Meeting Report of Sub-Working Group Sharing Studies

Word  

17359336 bytes 2023-02-14 [1668] Chapter 4 - Annex 4.4 - Working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Measurements and mathematical modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems

Word  

133470 bytes 2023-02-14 [1668] Chapter 4 - Annex 4.5 - Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] - Technical and regulatory measures to provide compatibility between IMT and MSS, with respect to MSS operations in the frequency band 1 518-1 525 MHz for administrations wishing to implement IMT in the frequency band 1 492-1 518 MHz

Word  

408260 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.6 - Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26/42/47GHz] - Guidelines to assist administrations to mitigate in-band interference from FSS earth stations operating in the frequency bands 24.65-25.25 GHz, 27-27.5 GHz, 42.5-43.5 GHz and 47.2-48.2 GHz into IMT stations

Word  

39438 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.7 - Draft final Note to the Director of the BR - [Status of the discussions in WP 5D relating to WRC-19 Document 550]

Word  

2057410 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.8 - Working document for preparation for a reply liaison statement to Working Party 4A - Elements on mitigation measures between FSS and IMT in the frequency band 3 400-3 600 MHz

Word  

40266 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.9 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.4

Word  

274517 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.10 - [Working document towards a] Preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS] - Technical and operational characteristics for the use of high-altitude platform stations as IMT base stations (HIBS) in the mobile service in certain frequency bands below 2.7 GHz already identified for IMT

Word  

127653 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.11 - Possible pfd masks for protection of IMT terrestrial networks from proposed HIBS operations in the 694-960 MHz, 1 710-1 885 MHz, 1 885-1 980 MHz, 2 010-2 025 MHz, 2 110-2 170 MHz, and 2 500-2 690 MHz for information only

Word  

1936937 bytes 2023-02-15 [1668] Chapter 4 - Annex 4.12 - The spectrum needs for HIBS in some scenarios

Word  

38538 bytes 2023-02-14 [1668] Chapter 3 - Meeting Report of Working Group General Aspects

Word  

57983 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.1 - Meeting Report of Sub-Working Group Specific Applications

Word  

33597 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.2 - Liaison statement to ITU-D Study Group 2, Question 1/2 - New Question 1/2 and collaboration: Workshop on smart sustainable cities and communities

Word  

15691233 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.3 - Preliminary draft new Report ITU-R M.[IMT.APPLICATIONS] - Applications of the terrestrial component of IMT for specific societal, industrial and enterprise usages

Word  

15406880 bytes 2023-02-15 [1668] Chapter 3 - Annex 3.4 - Reply liaison statement to ITU-D Study Group 2 Question 2/2 - Enabling technologies for e-services and applications, including e-health and e-education

Word  

4848056 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.5 - Preliminary draft new Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word  

44583 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.6 - Meeting Report of Sub-Working Group IMT-2030

PowerPoint 2007  

2519914 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.7 Part 3

PowerPoint 2007  

4383418 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.7 Part 2

PowerPoint 2007  

60632 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.7 Part 1

Word  

7280051 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.7 - [Preliminary] draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND] - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]]

Word  

34782 bytes 2023-02-13 [1668] Chapter 3 - Annex 3.8 - Terms of Reference of Working Party 5D Correspondence Group on IMT framework for 2030 and beyond

Word  

36228 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.9 - Report on the activities of Sub-Working Group RA-23 (ITU-R Resolutions, Questions and Opinions)

Word  

44322 bytes 2023-02-14 [1668] Chapter 3 - Annex 3.10 - Working document towards the revision of Resolution ITU-R 65

Word  

651340 bytes 2023-02-16 [1668] Chapter 2 - ITU-R Working Party 5D Structure and Workplan

Word  

59074 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.21 - Chairmen's contact details

Word  

50161 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.22 - Meeting schedule

Word  

43867 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.23 - Anticipated overall deliverables/work plan of Working Party 5D

Word  

40044 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24 - "Detailed work plans" for individual deliverables

Word  

34148 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.1 - Work plan for the development of a preliminary draft new Report ITU-R M.[IMT.APPLICATIONS]

Word  

42423 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.2 - Detailed work plan for Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word  

37281 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.3 - Detailed work plan for the development of preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]

Word  

33245 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.4 - Detailed work plan for the review of existing ITU-R Resolutions, Questions and Opinion

Word  

33614 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.5 - Detailed work plan for the revision of Recommendation ITU-R M.1036-6

Word  

43661 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.6 - Detailed work plan on the technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz

Word  

44309 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.7 - Detailed Work plan for ITU-R report on Advanced Antenna System (AAS) pattern for sharing studies between IMT-2020 systems and other services

Word  

42837 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.8 - Detailed Work plan for methods to assist administrations to mitigate in band interference from FSS earth stations operating in the frequency bands 24.65-25.25 GHz, 27-27.5 GHz, 42.5-43.5 GHz and 47.2-48.2 GHz into IMT stations

Word  

44244 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.9 - Detailed Work plan for the studies requested by WRC-19 in Document 550

Word  

41198 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.10 - Detailed work plan for a draft "revision after year 2021" of Recommendation ITU-R M.2150

Word  

38577 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.11 - Detailed Work plan for a draft revision of Recommendation ITU-R M.2012-5

Word  

35755 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.12 - Detailed Work plan for the development of preliminary draft new Report ITU-R M.[IMT.Above 100 GHz]

Word  

35284 bytes 2023-02-16 [1668] Chapter 2 - Annex 2.24.13 - Detailed work plan on the revision for "generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT advanced and IMT-2020"

Word  

464517 bytes 2023-04-12 [1668] Chapter 1 - Chairman's Report 43rd meeting of Working Party 5D (31 January - 9 February 2023)

Excel 2007  

28149 bytes 2023-03-10 [1668] Chapter 1 - Annex 1.1 - Index of Chapters and Annexes of the Report of Working Party 5D Meeting #43
 

Document :

ITU-R WP5D  Contribution  1668

Title :

Report on the 43rd meeting of Working Party 5D (Geneva, 31 January - 9 February 2023)

Date :

2023-02-09

Source :

Chairman, WP 5D

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-07-04