International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions : 886 Recently posted -  Search Meeting Documents
   
[886]  Report on the 39th meeting of Working Party 5D (e-Meeting, 4-15 October 2021)

Format

Size

Posted

English

Word  

3128694 bytes 2022-01-21 [886] Chapter 7 - General Matters

PowerPoint 2007  

823471 bytes 2021-11-02 [886] Chapter 6 - Part 1 - Overview timeline for "IMT towards 2030 and beyond (Option A) from WP 5D#39 TEMP/526)

Word  

861332 bytes 2021-11-02 [886] Chapter 6 - Meeting Report of Ad Hoc work plan

Word  

44866 bytes 2021-11-02 [886] Chapter 5 - Meeting Report of Working Group Technology Aspects

Word  

51857 bytes 2021-11-01 [886] Chapter 5 - Annex 5.1 - Meeting Report of Sub-Working Group IMT Specifications

Word  

31763 bytes 2021-11-01 [886] Chapter 5 - Annex 5.2 - Detailed work plans under Sub-Working Group IMT Specifications

Word  

42059 bytes 2021-11-01 [886] Chapter 5 - Annex 5.3 - Meeting Report of Sub-Working Group Evaluation

Word  

47633 bytes 2021-11-01 [886] Chapter 5 - Annex 5.4 - Meeting Report of Sub-Working Group Radio Aspects

Word  

1486242 bytes 2021-11-01 [886] Chapter 5 - Annex 5.5 - Working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND]

Word  

2038425 bytes 2021-11-01 [886] Chapter 5 - Annex 5.6 - Draft working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]

Word  

2936256 bytes 2021-11-01 [886] Chapter 5 - Annex 5.7 - Draft working document towards a preliminary draft new Report ITU-R M.[IMT.Above 100 GHz Technical feasibility of IMT in bands above 100 GHz]

Word  

31821 bytes 2021-11-01 [886] Chapter 5 - Annex 5.8 - Detailed work plans under Sub-Working Group Radio Aspects

Word  

33652 bytes 2021-11-01 [886] Chapter 5 - Annex 5.9 - Meeting Report of Sub-Working Group OOBE

Word  

31654 bytes 2021-11-01 [886] Chapter 5 - Annex 5.10 - Detailed work plan under Sub-Working Group OOBE

Word  

40875 bytes 2021-11-09 [886] Chapter 4 - Meeting Report of Working Group Spectrum Aspects and WRC-23 Preparations

Word  

32175 bytes 2021-11-03 [886] Chapter 4 - Annex 4.1 - Meeting Report of SWG Frequency Arrangements

Word  

1179984 bytes 2021-11-03 [886] Chapter 4 - Annex 4.2 - [Preliminary] draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations

Word  

31371 bytes 2021-11-03 [886] Chapter 4 - Annex 4.3 - Detailed work plan under Sub-Working Group Frequency Arrangements

Word  

42290 bytes 2021-11-03 [886] Chapter 4 - Annex 4.4 - Meeting report of Sub-Working Group Sharing Studies

Word  

17113298 bytes 2021-11-03 [886] Chapter 4 - Annex 4.5 - Working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Measurements and mathematical modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems

Word  

278664 bytes 2021-11-03 [886] Chapter 4 - Annex 4.6 - Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word  

32263 bytes 2021-11-03 [886] Chapter 4 - Annex 4.7 - Detailed work plans under Sub-Working Group Sharing Studies

Word  

36147 bytes 2021-11-03 [886] Chapter 4 - Annex 4.8 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.1

Word  

320667 bytes 2021-11-03 [886] Chapter 4 - Annex 4.9 - Working document towards a preliminary draft new Report ITU-R M.[CONDITIONS 1.1] - Working document related to WRC-23 agenda item 1.1 - Technical and regulatory conditions for the protection of stations of the Aeronautical Mobile Service (AMS) and Maritime Mobile Service (MMS) located in international airspace or waters (i.e. outside national territories) and operating in the frequency band 4 800-4 990 MHz

Word  

36730 bytes 2021-11-03 [886] Chapter 4 - Annex 4.10 - Working document towards a draft CPM text on WRC-23 agenda item 1.1

Word  

32709 bytes 2021-11-03 [886] Chapter 4 - Annex 4.11 - Detailed work plan under Sub-Working Group WRC-23 agenda item 1.1

Word  

39872 bytes 2021-11-03 [886] Chapter 4 - Annex 4.12 - Meeting Report of SWG WRC-23 agenda item 1.2

Word  

72903 bytes 2021-11-03 [886] Chapter 4 - Annex 4.13 - Working document towards draft CPM Text on WRC-23 agenda item 1.2

Word  

547907 bytes 2021-11-03 [886] Chapter 4 - Annex 4.14 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz

Word  

5333785 bytes 2021-11-03 [886] Chapter 4 - Annex 4.15 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz

Word  

8682310 bytes 2021-11-03 [886] Chapter 4 - Annex 4.16 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2

Word  

31604 bytes 2021-11-03 [886] Chapter 4 - Annex 4.17 - Detailed work plan under Sub-Working Group WRC-23 agenda item 1.2

Word  

39865 bytes 2021-11-03 [886] Chapter 4 - Annex 4.18 - Meeting Report of SWG WRC-23 agenda item 1.4

Word  

38700 bytes 2021-11-03 [886] Chapter 4 - Annex 4.19 - Working document towards draft CPM Text on WRC-23 agenda item 1.4

Word  

2173679 bytes 2021-11-03 [886] Chapter 4 - Annex 4.20 - Working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]/working document related to WRC-23 agenda item 1.4 - Spectrum needs, usage and deployment scenarios, and technical and operational characteristics for the use of high-altitude platform stations as IMT base stations (HIBS) in the mobile service in certain frequency bands below 2.7 GHz already identified for IMT

Word  

12647032 bytes 2021-11-03 [886] Chapter 4 - Annex 4.21 - Working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) on WRC-23 agenda item 1.4

Word  

31447 bytes 2021-11-03 [886] Chapter 4 - Annex 4.22 - Detailed work plan under Sub-Working Group WRC-23 agenda item 1.4

Word  

42177 bytes 2021-10-28 [886] Chapter 3 - Meeting Report of Working Group General Aspects

Word  

42215 bytes 2021-10-27 [886] Chapter 3 - Annex 3.1 - Meeting Report of Sub-Working Group Specific Applications

Word  

359293 bytes 2021-10-27 [886] Chapter 3 - Annex 3.2 - Preliminary draft new Report ITU-R M.[IMT.C-V2X] - The use of the terrestrial component of IMT for Cellular-Vehicle-to-Everything applications

Word  

611921 bytes 2021-10-27 [886] Chapter 3 - Annex 3.3 - Working document towards a preliminary draft new Report ITU-R M.[IMT.INDUSTRY] - Applications of IMT for specific societal, industrial and enterprise usages

Word  

37657 bytes 2021-10-27 [886] Chapter 3 - Annex 3.4 - Working document toward preliminary draft new Report ITU-R M.[IMT MEDIA] - Capabilities of the terrestrial IMT-2020 systems for new Media [and/or Audio-visual] Applications in the Land Mobile Service

Word  

31728 bytes 2021-10-27 [886] Chapter 3 - Annex 3.5 - Detailed workplan under Sub-Working Group Specific Applications

Word  

37209 bytes 2021-10-27 [886] Chapter 3 - Annex 3.6 - Meeting Report of Sub-Working Group Vision

Word  

2388670 bytes 2021-10-27 [886] Chapter 3 - Annex 3.7 - Working document towards preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]

Word  

35968 bytes 2021-10-27 [886] Chapter 3 - Annex 3.8 - Working document towards program for Working Party 5D Workshop on "IMT Vision for 2030 and beyond"

Word  

34321 bytes 2021-10-27 [886] Chapter 3 - Annex 3.9 - Working document towards draft liaison statement to External Organizations

Word  

31463 bytes 2021-10-27 [886] Chapter 3 - Annex 3.10 - Detailed workplan under Sub-Working Group Vision

Word  

4213312 bytes 2021-10-27 [886] Chapter 3 - Annex 3.11 - Part 1 - Handbook on Global Trends in IMT

Word  

3965368 bytes 2021-10-27 [886] Chapter 3 - Annex 3.11 - Preliminary draft new edition of the Handbook on global trends in International Mobile Telecommunications (IMT)

Word  

31572 bytes 2021-11-22 [886] Chapter 3 - Annex 3.12 - Detailed workplan under Drafting Group IMT Handbook

Word  

779710 bytes 2021-10-28 [886] Chapter 2 - New revised version of Chapter 2 to Working Party 5D Chairman's Report - ITU-R Working Party 5D Structure and Workplan

Word  

47109 bytes 2021-10-28 [886] Chapter 2 - Annex 2.21 - Chairmen's contact details

Word  

40545 bytes 2021-10-28 [886] Chapter 2 - Annex 2.22 - Meeting schedule

Word  

34923 bytes 2021-10-28 [886] Chapter 2 - Annex 2.23 - Anticipated overall deliverables/workplan of Working Party 5D

Word  

34900 bytes 2021-10-29 [886] Chapter 2 - Annex 2.24 - "Detailed workplans" for individual deliverables

Word  

35443 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.1 - Detailed workplan for Report ITU-R M.[IMT.C-V2X]

Word  

34282 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.2 - Workplan for development of a preliminary draft new Report ITU-R M.[IMT.INDUSTRY]

Word  

34505 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.3 - Detailed workplan for Report ITU-R M.[IMT.MEDIA]

Word  

35542 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.4 - Detailed workplan for the development of preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]

Word  

33748 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.5 - Detailed workplan for the completion of the draft new edition of the Handbook on global trends in International Mobile Telecommunications (IMT)

Word  

33227 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.6 - Detailed workplan for revision of Recommendation ITU-R M.1036-6

Word  

36297 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.7 - Detailed workplan on the technical measures to ensure coexistence between the MSS in the frequency band 1 518 1 525 MHz and IMT in the frequency band 1 492-1 518 MHz

Word  

35528 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.8 - Detailed workplan for ITU-R Report on Advanced antenna system (AAS) pattern for sharing studies between IMT-2020 systems and other services

Word  

35346 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.9 - Detailed workplan for the studies requested by WRC-19 in Document 550

Word  

33890 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.10 - Detailed workplan for methods to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word  

34434 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.11 - Detailed workplan on the development of technical guidance to administrations for ensuring coexistence between IMT and transmitting FSS earth stations

Word  

36131 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.12 - Detailed workplan for Working Party 5D preparatory work for WRC-23 agenda item 1.1

Word  

36946 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.13 - Detailed workplan for WRC-23 agenda item 1.2

Word  

36192 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.14 - Detailed workplan for WRC-23 agenda item 1.4

Word  

40168 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.15 - Detailed workplan for a draft "Revision after year 2021" of Recommendation ITU-R M.2150

Word  

38858 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.16 - Detailed workplan for a draft revision 6 of Recommendation ITU-R M.2012-5

Word  

35654 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.17 - Workplan for working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND]

Word  

35219 bytes 2021-10-29 [886] Chapter 2 - Annex 2.24.18 - Detailed workplan for the development of a working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]

Word  

36967 bytes 2021-10-28 [886] Chapter 2 - Annex 2.24.19 - Detailed workplan for the development of preliminary draft new Report ITU-R M.[IMT.ABOVE 100GHz]

Word  

36833 bytes 2021-10-29 [886] Chapter 2 - Annex 2.24.20 - Detailed workplan for "Generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT 2020"

Word  

376909 bytes 2021-11-22 [886] Chapter 1 Part 2

PDF (acrobat)  

530414 bytes 2021-11-22 [886] Chapter 1 Part 1

Word  

1028734 bytes 2021-11-22 [886] Chapter 1 - Chairman's Report of 39th e-meeting of Working Party 5D (4-15 October 2021 - Virtual)

Excel 2007  

28981 bytes 2021-11-22 [886] Chapter 1 - Annex 1.1 - Index of Chapters and Annexes of the Report of Working Party 5D Meeting #39
 

Document :

ITU-R WP5D  Contribution  886

Title :

Report on the 39th meeting of Working Party 5D (e-Meeting, 4-15 October 2021)

Date :

2021-10-15

Source :

Chairman, WP 5D

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-01-21