International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : RRB18.3 : Contributions : 8 Recently posted -  Search Meeting Documents
   
[8]  Submission by the Administration of Papua New Guinea regarding a request from the Administration of Egypt for an extensin of the regulatory time-limit to bring into use the frequency assignments to EGYCOMM0A satellite network at 35.5şE

Format

Size

Posted

English

PDF (acrobat)  

1472139 bytes 2018-11-05 [8] 

Word  

824737 bytes 2018-11-05 [8] 
Arabic

PDF (acrobat)  

337567 bytes 2018-11-08 [8] 

Word  

102100 bytes 2018-11-08 [8] 
Chinese

PDF (acrobat)  

607677 bytes 2018-11-07 [8] 

Word  

166003 bytes 2018-11-07 [8] 
Español

PDF (acrobat)  

345327 bytes 2018-11-08 [8] 

Word  

154277 bytes 2018-11-08 [8] 
Français

Word  

145607 bytes 2018-11-08 [8] 

PDF (acrobat)  

282951 bytes 2018-11-08 [8] 
Russian

PDF (acrobat)  

298322 bytes 2018-11-08 [8] 

Word  

467633 bytes 2018-11-08 [8] 
 

Document :

ITU-R RRB18.3  Contribution  8

Title :

Submission by the Administration of Papua New Guinea regarding a request from the Administration of Egypt for an extensin of the regulatory time-limit to bring into use the frequency assignments to EGYCOMM0A satellite network at 35.5şE

Date :

2018-11-05

Source :

Director, BR

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright İ ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2018-11-08