Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1310 ]
|
Liaison statement on work being carried out under study in ITU-T Q3/5
|
ITU-T SG 5
|
|
2019-10-15 |
|
[ 1309 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Party 5D on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services
|
ITU-D SG 1
|
|
2019-10-02 |
|
[ 1308 ]
|
Liaison statement from the 5G PPP IMT-2020 Evaluation Group Regarding - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
|
5G PPP
|
|
2019-10-01 |
|
[ 1307 ]
|
Liaison statement from the 5GMF IMT-2020 Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
|
Fifth Generation Mobile Forum (5GMF-IEG)
|
|
2019-09-30 |
|
[ 1306 ]
|
Reply liaison statement to Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (TTA)
|
Director, BR
|
|
2019-09-30 |
|
[ 1305 ]
|
Liaison statement from ChEG regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
|
The Chinese Evaluation Group (ChEG)
|
|
2019-09-30 |
|
[ 1304 ]
|
Liaison statement from the 5G India Forum Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
|
Director, BR
|
|
2019-09-27 |
|
[ 1303 ]
|
Response to the LS from ITU-R Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (CEG)
|
Director, BR
|
|
2019-09-27 |
|
[ 1302 ]
|
Liaison statement from ATIS WTSC IMT-2020 Evaluation Group regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
|
Alliance for Telecommunications Industry Solutions
|
|
2019-09-24 |
|
[ 1301 ]
|
Updated submission of the candidate IMT-2020 Technology
|
TSDS, India (TSDSI)
|
|
2019-09-10 |
|
[ 1300 ]
|
Updated submission of candidate IMT-2020 Radio Interface Technology (EUHT)
|
Nufront (Beijing) Technology Co., Ltd.
|
|
2019-09-10 |
|
[ 1299 ]
|
Candidate submission for inclusion in IMT-2020
|
Eswatini (Kingdom of)
,
Botswana (Republic of)
,
Malawi
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
|
|
2022-06-06 |
|
[ 1298 ]
|
Liaison statement on ITU-T SG20 terms and definitions
|
SCV
|
|
2019-08-23 |
|
[ 1297 ]
+Ch.1-7 |
Report on the thirty-second meeting of Working Party 5D (Búzios, Brazil, 9-17 July 2019)
|
Chairman, WP 5D
|
|
2019-07-22 |
|
[ 1296 ]
|
Final List of Participants - Working Party 5D (Búzios, Brazil, 9-17 July 2019
|
Director, BR
|
|
2019-07-18 |
|
[ 1295 ]
(Rev.2) |
Update on activities in Region 3
|
Region 3 Rapporteur
|
|
2019-07-09 |
|
[ 1294 ]
|
Report on the recent activities of the Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2019-07-08 |
|
[ 1293 ]
|
Update on recent activities within CEPT
|
ITU Region 1 (CEPT) Rapporteur
|
AI1.13
|
2019-07-08 |
|
[ 1292 ]
|
Liaison statement on invitation to update the information in the IMT2020 roadmap [to ITU Study Groups and External IMT-2020 liaison partners]
|
Chairman, ITU-T JCA-IMT2020
|
|
2019-07-08 |
|
[ 1291 ]
|
Update on recent and planned IMT-related activities within ATU
|
ITU Region 1 (ATU) Rapporteur
|
|
2019-07-05 |
|
[ 1290 ]
|
Submission in support of TSDSI RIT proposal towards IMT-2020
|
India (Republic of)
|
|
2019-07-02 |
|
[ 1289 ]
|
Input on working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES]
|
India (Republic of)
|
|
2019-07-02 |
|
[ 1288 ]
|
Input on working document towards preliminary draft new Question ITU-R [IMT.SPECIFIC INDUSTRIAL APPLICATIONS]/5
|
India (Republic of)
|
|
2019-07-02 |
|
[ 1287 ]
|
Proposal for preliminary draft new Recommendation on the frequency band 24.25-27.5 GHz under agenda item 1.13 item A
|
United Arab Emirates
|
|
2019-07-02 |
|
[ 1286 ]
|
Proposal for the revision of Recommendation ITU-R M.1036-5
|
United Arab Emirates
|
|
2019-07-02 |
|
[ 1285 ]
|
Draft new Report ITU-R M.[RADAR&IMT SHARING]
|
Angola (Republic of)
,
Botswana (Republic of)
,
Cameroon (Republic of)
,
Egypt (Arab Republic of)
,
Kenya (Republic of)
,
Lesotho (Kingdom of)
,
Malawi
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
Niger (Republic of the)
,
Nigeria (Federal Republic of)
,
Rwanda (Republic of)
,
South Africa (Republic of)
,
Tanzania (United Republic of)
,
Uganda (Republic of)
,
Zambia (Republic of)
,
Zimbabwe (Republic of)
|
|
2019-07-02 |
|
[ 1284 ]
|
Considerations on aspects of synchronization operations on multiple IMT-2020 TDD networks
|
Telefon AB - LM Ericsson
|
|
2019-07-02 |
|
[ 1283 ]
|
Sharing and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocations systems in 3 100-3 400 MHz
|
Orange
|
|
2019-07-02 |
|
[ 1282 ]
|
Proposed revision to the draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]
|
Inmarsat Plc.
|
|
2019-07-02 |
|
[ 1281 ]
|
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries
|
Inmarsat Plc.
|
|
2019-07-02 |
|
[ 1280 ]
|
Revision of the Recommendation ITU-R M.1036-5
|
Deutsche Telekom AG
,
Nokia Corporation
,
Orange
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telia Company AB
|
|
2019-07-02 |
|
[ 1279 ]
|
Response to liaison statement to registered Independent Evaluation Group
|
Director, BR
|
|
2019-07-02 |
|
[ 1278 ]
|
Proposal on the work plan and the skeleton of Report ITU-R M.[IMT-2020.TDD. SYNCHRONIZATION]
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1277 ]
|
Consideration on a new ITU-R Resolution and Question for other industrial usages by IMT
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1276 ]
|
Observations for technology submissions
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1275 ]
|
Proposals for Addendum 4 to Circular Letter 5/LCCE/59
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1274 ]
|
Proposals for program of IMT-2020 evaluation workshop
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1273 ]
|
Proposals on workplan of SWG Evaluation
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1272 ]
|
Proposals on LS contents to proponents and IEGS
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1271 ]
|
Proposals on format of conclusion from IMT-2020 submissions in SWG Eval
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1270 ]
|
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries
|
China (People's Republic of)
|
AI9.1
|
2019-07-02 |
|
[ 1269 ]
|
Evaluation activities from Chinese Evaluation Group
|
Director, BR
|
|
2019-07-02 |
|
[ 1268 ]
|
Final submission of candidate IMT-2020 radio interface technology
|
China (People's Republic of)
|
|
2019-07-02 |
|
[ 1267 ]
|
Electromagnetic simulations of A 26 GHz band advanced antenna system (AAS) at different frequencies
|
United Kingdom of Great Britain and Northern Ireland
|
|
2019-07-02 |
|
[ 1266 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band
|
WP 4C
|
|
2019-07-02 |
|
[ 1265 ]
|
Updates to spectrum analyzer measurements of terrestrial IMT operations for 2 GHz band segments addressed in WRC-19 agenda item 9.1.1
|
Papua New Guinea
|
|
2019-07-02 |
|
[ 1264 ]
|
Further updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries (Question ITU-R 201-1/4)
|
Papua New Guinea
|
|
2019-07-02 |
|
[ 1263 ]
|
Liaison statement to ITU-T JCA IMT-2020, ITU-R Working Party 5D and 3GPP - Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies
|
WP 4B
|
|
2019-07-02 |
|
[ 1262 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
WP 4A
|
|
2019-07-05 |
|
[ 1261 ]
|
Proposals on the work of the preliminary draft new Report ITU-R M.[REP.MSS & IMT L-BAND COMPATIBILITY] and on the working document towards a draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]
|
Brazil (Federative Republic of)
|
|
2019-07-01 |
Results:1310 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):