International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:1310 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1310 ]  
 
Liaison statement on work being carried out under study in ITU-T Q3/5     ITU-T SG 5     2019-10-15
[ 1309 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Party 5D on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services     ITU-D SG 1     2019-10-02
[ 1308 ]  
 
Liaison statement from the 5G PPP IMT-2020 Evaluation Group Regarding - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020     5G PPP     2019-10-01
[ 1307 ]  
 
Liaison statement from the 5GMF IMT-2020 Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020     Fifth Generation Mobile Forum (5GMF-IEG)     2019-09-30
[ 1306 ]  
 
Reply liaison statement to Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (TTA)     Director, BR     2019-09-30
[ 1305 ]  
 
Liaison statement from ChEG regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020     The Chinese Evaluation Group (ChEG)     2019-09-30
[ 1304 ]  
 
Liaison statement from the 5G India Forum Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020     Director, BR     2019-09-27
[ 1303 ]  
 
Response to the LS from ITU-R Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (CEG)     Director, BR     2019-09-27
[ 1302 ]  
 
Liaison statement from ATIS WTSC IMT-2020 Evaluation Group regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020     Alliance for Telecommunications Industry Solutions     2019-09-24
[ 1301 ]  
 
Updated submission of the candidate IMT-2020 Technology     TSDS, India (TSDSI)     2019-09-10
[ 1300 ]  
 
Updated submission of candidate IMT-2020 Radio Interface Technology (EUHT)     Nufront (Beijing) Technology Co., Ltd.     2019-09-10
[ 1299 ]  
 
Candidate submission for inclusion in IMT-2020     Eswatini (Kingdom of) , Botswana (Republic of) , Malawi , South Africa (Republic of) , Zimbabwe (Republic of)     2022-06-06
[ 1298 ]  
 
Liaison statement on ITU-T SG20 terms and definitions     SCV     2019-08-23
[ 1297 ]  
+Ch.1-7 
Report on the thirty-second meeting of Working Party 5D (Búzios, Brazil, 9-17 July 2019)     Chairman, WP 5D     2019-07-22
[ 1296 ]  
 
Final List of Participants - Working Party 5D (Búzios, Brazil, 9-17 July 2019     Director, BR     2019-07-18
[ 1295 ]  
(Rev.2) 
Update on activities in Region 3     Region 3 Rapporteur     2019-07-09
[ 1294 ]  
 
Report on the recent activities of the Wireless World Research Forum (WWRF)     WWRF Liaison Rapporteur     2019-07-08
[ 1293 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur   AI1.13   2019-07-08
[ 1292 ]  
 
Liaison statement on invitation to update the information in the IMT2020 roadmap [to ITU Study Groups and External IMT-2020 liaison partners]     Chairman, ITU-T JCA-IMT2020     2019-07-08
[ 1291 ]  
 
Update on recent and planned IMT-related activities within ATU     ITU Region 1 (ATU) Rapporteur     2019-07-05
[ 1290 ]  
 
Submission in support of TSDSI RIT proposal towards IMT-2020     India (Republic of)     2019-07-02
[ 1289 ]  
 
Input on working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES]     India (Republic of)     2019-07-02
[ 1288 ]  
 
Input on working document towards preliminary draft new Question ITU-R [IMT.SPECIFIC INDUSTRIAL APPLICATIONS]/5     India (Republic of)     2019-07-02
[ 1287 ]  
 
Proposal for preliminary draft new Recommendation on the frequency band 24.25-27.5 GHz under agenda item 1.13 item A     United Arab Emirates     2019-07-02
[ 1286 ]  
 
Proposal for the revision of Recommendation ITU-R M.1036-5     United Arab Emirates     2019-07-02
[ 1285 ]  
 
Draft new Report ITU-R M.[RADAR&IMT SHARING]     Angola (Republic of) , Botswana (Republic of) , Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Lesotho (Kingdom of) , Malawi , Mozambique (Republic of) , Namibia (Republic of) , Niger (Republic of the) , Nigeria (Federal Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Tanzania (United Republic of) , Uganda (Republic of) , Zambia (Republic of) , Zimbabwe (Republic of)     2019-07-02
[ 1284 ]  
 
Considerations on aspects of synchronization operations on multiple IMT-2020 TDD networks     Telefon AB - LM Ericsson     2019-07-02
[ 1283 ]  
 
Sharing and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocations systems in 3 100-3 400 MHz     Orange     2019-07-02
[ 1282 ]  
 
Proposed revision to the draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]     Inmarsat Plc.     2019-07-02
[ 1281 ]  
 
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries     Inmarsat Plc.     2019-07-02
[ 1280 ]  
 
Revision of the Recommendation ITU-R M.1036-5     Deutsche Telekom AG , Nokia Corporation , Orange , Telecom Italia S.p.A. , Telefónica, S.A. , Telia Company AB     2019-07-02
[ 1279 ]  
 
Response to liaison statement to registered Independent Evaluation Group     Director, BR     2019-07-02
[ 1278 ]  
 
Proposal on the work plan and the skeleton of Report ITU-R M.[IMT-2020.TDD. SYNCHRONIZATION]     China (People's Republic of)     2019-07-02
[ 1277 ]  
 
Consideration on a new ITU-R Resolution and Question for other industrial usages by IMT     China (People's Republic of)     2019-07-02
[ 1276 ]  
 
Observations for technology submissions     China (People's Republic of)     2019-07-02
[ 1275 ]  
 
Proposals for Addendum 4 to Circular Letter 5/LCCE/59     China (People's Republic of)     2019-07-02
[ 1274 ]  
 
Proposals for program of IMT-2020 evaluation workshop     China (People's Republic of)     2019-07-02
[ 1273 ]  
 
Proposals on workplan of SWG Evaluation     China (People's Republic of)     2019-07-02
[ 1272 ]  
 
Proposals on LS contents to proponents and IEGS     China (People's Republic of)     2019-07-02
[ 1271 ]  
 
Proposals on format of conclusion from IMT-2020 submissions in SWG Eval     China (People's Republic of)     2019-07-02
[ 1270 ]  
 
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries     China (People's Republic of)   AI9.1   2019-07-02
[ 1269 ]  
 
Evaluation activities from Chinese Evaluation Group     Director, BR     2019-07-02
[ 1268 ]  
 
Final submission of candidate IMT-2020 radio interface technology     China (People's Republic of)     2019-07-02
[ 1267 ]  
 
Electromagnetic simulations of A 26 GHz band advanced antenna system (AAS) at different frequencies     United Kingdom of Great Britain and Northern Ireland     2019-07-02
[ 1266 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band     WP 4C     2019-07-02
[ 1265 ]  
 
Updates to spectrum analyzer measurements of terrestrial IMT operations for 2 GHz band segments addressed in WRC-19 agenda item 9.1.1     Papua New Guinea     2019-07-02
[ 1264 ]  
 
Further updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries (Question ITU-R 201-1/4)     Papua New Guinea     2019-07-02
[ 1263 ]  
 
Liaison statement to ITU-T JCA IMT-2020, ITU-R Working Party 5D and 3GPP - Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies     WP 4B     2019-07-02
[ 1262 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]     WP 4A     2019-07-05
[ 1261 ]  
 
Proposals on the work of the preliminary draft new Report ITU-R M.[REP.MSS & IMT L-BAND COMPATIBILITY] and on the working document towards a draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]     Brazil (Federative Republic of)     2019-07-01
Results:1310 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-06-07