Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1092 ]
|
Liaison statement on work being carried out under study in ITU-T Q3/5
|
ITU-T SG 5
|
|
2019-10-15 |
|
[ 1091 ]
|
Liaison statement on ITU-T SG20 terms and definitions
|
SCV
|
|
2019-08-23 |
|
[ 1090 ]
|
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database
|
WP 6A
|
Q32/6
|
2019-07-29 |
|
[ 1089 ]
|
Laison statement on the call for proposals for an internationally agreed vehicular multimedia architecture
|
ITU-T (FG-VM)
|
|
2019-07-29 |
|
[ 1088 ]
|
Liaison statement on the new version of the Home Network Transport (HNT) standards over view and work plan
|
ITU-T SG 15
|
|
2019-07-22 |
|
[ 1087 ]
|
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Intention to develop a Small Satellite Handbook
|
WP 4A
|
|
2019-07-18 |
|
[ 1086 ]
|
Liaison statement to Working Parties 5A, 5C, 7B, 7C and 7D - Non-geostationary satellites operating space-to-space links in mobile-satellite service (MSS) allocations in the 1-3 GHz range
|
WP 4C
|
|
2019-07-17 |
|
[ 1085 ]
|
Liaison statement to Working Party 5D (Copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band
|
WP 4C
|
|
2019-07-02 |
|
[ 1084 ]
|
Liaison statement to Working Party 5A - Protection of radiocommunication services from WPT radiated disturbances
|
WP 1A
|
|
2019-06-24 |
|
[ 1083 ]
|
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam
|
WP 1A
|
|
2019-06-24 |
|
[ 1082 ]
|
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R
|
WP 1A
|
|
2019-06-21 |
|
[ 1081 ]
|
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems
|
WP 1A
|
|
2019-06-21 |
|
[ 1080 ]
|
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications
|
WP 1A
|
|
2019-06-21 |
|
[ 1079 ]
|
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D - Information related to WRC-19 agenda item 1.15
|
WP 1A
|
AI1.15
|
2019-06-21 |
|
[ 1078 ]
|
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range
|
WP 1A
|
|
2019-06-18 |
|
[ 1077 ]
|
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise
|
WP 1A
|
|
2019-06-18 |
|
[ 1076 ]
|
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference
|
WP 1A
|
|
2019-06-18 |
|
[ 1075 ]
|
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer
|
WP 1B
|
|
2019-06-17 |
|
[ 1074 ]
|
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5
|
ITU-T SG 5
|
|
2019-06-14 |
|
[ 1073 ]
|
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
|
WP 1A
|
|
2019-06-14 |
|
[ 1072 ]
|
Reply liaison statement to ITU-T Study Group 3 (copy to the Director of the Radiocommunication Bureau for communication to the Director of the Telecomunication Standardization Bureau) (also copy to ITU-R Working Parties 5A and 5D for information) - Comments on draft new Recommendation ITU-T D.264 (D.SpectrumShare)
|
SG 1
|
|
2019-06-12 |
|
[ 1071 ]
|
Liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.COEXIST]
|
WP 7C
|
|
2019-06-10 |
|
[ 1070 ]
|
Reply liaison statement to Working Party 5A (copy for information to Working Party 7C) - Working document towards a preliminary draft new Report ITU-R M.[100GHZ.RSTT.COEXIST]
|
WP 7D
|
|
2019-06-03 |
|
[ 1069 ]
|
Liaison statement concerning document ITU-R M.[IMT.USAGE] and the work of ITU-T Q18/15 in smart grid networks
|
ITU-T
|
|
2019-05-31 |
|
[ 1068 ]
(Rev.2) |
Reply liaison statement to Wokring Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near fiel)
|
WPs 3J, 3K, 3L and 3M
|
|
2019-05-27 |
|
[ 1067 ]
|
Liaison statement to Working Party 5A (copy to Working Party 1A) - Working document toward a preliminary draft revision of Report ITU-R M.2417-0
|
WPs 3J, 3K and 3M
|
|
2019-05-27 |
|
[ 1066 ]
|
Liaison statement to External Organisations (copy for information to Working Parties 5A and 7B) - Fixed wireless system antenna paterns above 86 GHz
|
WP 5C
|
|
2019-05-13 |
|
[ 1065 ]
+Ann.1-14 |
Report on the twenty-second meeting of Working Party 5A (Geneva, 29 April - 9 May 2019)
|
Chairman, WP 5A
|
|
2019-05-09 |
|
[ 1064 ]
|
Final list of participants - Working Party 5A (Geneva, 29 April - 9 May 2019)
|
Director, BR
|
|
2019-05-09 |
|
[ 1063 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 4C, 5A, 5C and 6A for information) - Consideration of non-GSO short duration satellite systems in 137-138 MHz operating under the space operation service
|
WP 5B
|
AI1.7
|
2019-05-09 |
|
[ 1062 ]
|
Report on the relevant activities in certain countries in Region 3
|
Liaison R3 Rapporteur
|
|
2019-05-08 |
|
[ 1061 ]
|
Report on relevant activities in certain countries in Region 2
|
Liaison Rapporteur
|
|
2019-05-06 |
|
[ 1060 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WP 5C
|
|
2019-05-06 |
|
[ 1059 ]
|
Report on relevant activities in certain countries in Region 1
|
Liaison Rapporteur
|
|
2019-05-02 |
|
[ 1058 ]
|
Report on the recent activities of The Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2019-05-01 |
|
[ 1057 ]
|
List of Documents Issued
|
BR Study Groups Department
|
|
2019-04-26 |
|
[ 1056 ]
|
Reply liaison statement to Working Party 5A - WRC-19 agenda item 1.11
|
WP 6A
|
AI1.11
|
2019-04-26 |
|
[ 1055 ]
|
Report on disaster relief
|
Disaster Relief Liaison Rapporteur
|
|
2019-04-22 |
|
[ 1054 ]
|
Modifications to preliminary draft new Recommendation ITU-R M.[MS-RXCHAR-28) - Receiver characteristics and protection criteria for systems (excluding IMT) in the mobile service in the frequency range 27.5-29.5 GHz for use in sharing and compatibility studies [with earth stations in motion operating in geostationary FSS networks and with applications under the fixed service]
|
India (Republic of)
|
|
2019-04-22 |
|
[ 1053 ]
|
Proposed liaison statement to Working Party 7B on the studies in Report ITU-R SA.2429 - Studies related to proposed change in 460 470 MHz secondary allocation for METSAT (space-to-Earth) to primary and addition of primary allocation to EESS (space-to-Earth)
|
India (Republic of)
|
|
2019-04-22 |
|
[ 1052 ]
|
Preliminary draft new Report ITU-R M.[AMATEUR_50 MHz] - Spectrum needs for the amateur service in the frequency band 50-54 MHz in Region 1 and sharing with mobile, fixed, radiolocation and broadcasting services
|
International Amateur Radio Union
|
|
2019-04-22 |
|
[ 1051 ]
|
Proposed draft new revision of Question ITU-R 205-5/5
|
China (People's Republic of)
|
|
2019-04-22 |
|
[ 1050 ]
|
Proposed modification of preliminary draft revision of Recommendation ITU-R M.2084-0
|
China (People's Republic of)
|
|
2019-04-22 |
|
[ 1049 ]
|
Proposed modification on working document towards revision of Land Mobile Handbook - Vol. 4 - Intelligent Transport Systems
|
China (People's Republic of)
|
Q205-5/5
|
2019-04-22 |
|
[ 1048 ]
|
Views and proposal to elements for a possible Report on the frequency arrangements for broadband air-to-ground (A2G) communications links with passenger aircraft
|
China (People's Republic of)
|
|
2019-04-22 |
|
[ 1047 ]
|
Draft liaison statement to ITU-R Working Party 4A - Updated protection criteria for use in sharing and compatibility studies for WRC-19 agenda item 1.5
|
China (People's Republic of)
|
|
2019-04-22 |
|
[ 1046 ]
|
Proposed modifications to the preliminary draft new Recommendation ITU-R M.[MS-RXCHAR-28]
|
China (People's Republic of)
|
|
2019-04-22 |
|
[ 1045 ]
|
Proposed updates to preliminary draft new Report ITU-R M.[NON_IMT.MTC_USAGE]
|
China (People's Republic of)
|
AI9.1
|
2019-04-22 |
|
[ 1044 ]
|
Proposed revisions to the preliminary draft new Report ITU-R M.[RLAN REQ-PAR]
|
China (People's Republic of)
|
AI1.16
|
2019-04-22 |
|
[ 1043 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[RLAN SHARING 5 350-5 470 MHz]
|
China (People's Republic of)
|
AI1.16
|
2019-04-22 |
Results:1092 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):