Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 79 ]
|
Draft Revision of Question ITU-R 201-2/7 - Two-way time and frequency transfer through communication satellites
|
Working Party 7A
|
|
2007-09-28 |
|
[ 78 ]
|
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7
|
Chairman, SG 7
|
|
2007-03-30 |
|
[ 77 ]
|
Final List of Participants - Study Group 7 (Geneva, 5 & 12 February 2007)
|
Director, BR
|
|
2007-02-12 |
|
[ 76 ]
|
Executive report of Working Party 7A
|
Chairman, WP 7A
|
|
2007-02-12 |
|
[ 75 ]
|
Note to Director, Radiocommunication Bureau from the Chairman, Study Group 7
|
Chairman, SG 7
|
|
2007-02-12 |
|
[ 74 ]
|
List of documents issued
|
BR Study Group Department
|
|
2007-02-09 |
|
[ 73 ]
(Rev.1) |
Review of Study Group 7 ITU-R Recommendations to which no substantial revisions have been made in the past 10-15 years
|
Vice-Chairmen SG 7
|
|
2007-02-09 |
|
[ 72 ]
(Rev.1) |
Draft new Recommendation ITU-R RS.[RHF] - Technical and operational characteristics of Earth exploration-satellite service systems operating above 3 000 GHz
|
WP 7C
|
235/7
|
2007-02-09 |
|
[ 71 ]
|
Draft new Recommendation ITU-R SA.[8 GHz USE] - System design guidelines for Earth exploration-satellites operating in the band 8 025-8 400 MHz
|
WP 7B
|
139/7
|
2007-02-09 |
|
[ 70 ]
|
Draft new Report ITU-R RA.[RFI] - Techniques for mitigation of radio frequency interference in radio astronomy
|
WP 7D
|
237/7
|
2007-02-09 |
|
[ 69 ]
|
Draft New Report ITU-R RS.[9 GHz COMPAT] - Studies related to the compatibility between EESS (active) and the radiodetermination service in the 9 300-9 500 MHz and 9 800-10 000 MHz bands and between EESS (active) and the fixed service in the 9 800-10 000 MHz band
|
WP 7C
|
|
2007-02-09 |
|
[ 68 ]
|
Draft New Recommendation ITU-R SA.[MET 18 GHz] - System characteristics and interference criteria for meteorological satellite systems operating around 18 GHz
|
SG 7
|
|
2007-02-09 |
|
[ 67 ]
(Rev.1) |
Draft new Recommendation ITU-R RS.[10/36 GHz MITIGATE] - Technical and operational characteristics for passive sensors in the Earth exploration-satellite (passive) service to facilitate sharing of the 10.6-10.68 GHz and 36-37 GHz bands with the fixed and mobile services
|
WP 7C
|
232/7
|
2007-02-09 |
|
[ 66 ]
|
Draft New Report ITU-R RS.[10.6 GHz SHARING] - Sharing of the 10.6-10.68 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
|
WP 7C
|
232/7
|
2007-02-09 |
|
[ 65 ]
|
Draft new Report ITU-R RS.[36-37 GHz SHARING] - Sharing of the 36-37 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
|
WP 7C
|
232/7
|
2007-02-09 |
|
[ 64 ]
|
Liaison statement from Working Party 4A - The applicability of Recommendation ITU-R S.1432 to the frequency band 18.0-18.4 GHz
|
WP 4A
|
|
2007-02-06 |
|
[ 63 ]
|
Document number not used
|
N/A
|
|
2007-02-12 |
|
[ 62 ]
|
List of documents issued
|
BR Study Group Department
|
|
2007-02-02 |
|
[ 61 ]
|
Proposed modifications to draft new Recommendation ITU-R SA.[8 GHZ Use] - Use of the 8 025-8 400 MHz band by the Earth Exploration-Satellite Service
|
Canada
|
139/7
|
2007-01-26 |
|
[ 60 ]
(Rev.1-2) |
Review of the Questions assigned to SG 7
|
Vice-Chairman SG 7
|
|
2007-01-23 |
|
[ 59 ]
|
Executive Report on the meeting of Working Party 7C
|
Chairman, WP 7C
|
|
2007-01-26 |
|
[ 58 ]
|
Executive Report on meeting of Working Party 7D (November 2005 and August 2006)
|
Chairman, WP 7D
|
|
2007-01-23 |
|
[ 57 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
|
Coordination Committee for Vocabulary (CCV)
|
|
2007-01-11 |
|
[ 56 ]
|
Executive Report on the meetings of WP 7B - (November 2005 and August 2006)
|
Chairman, WP 7B
|
|
2007-01-09 |
|
[ 55 ]
|
Draft new Recommendation ITU-R SA.[MET 18 GHz] - System characteristics and sharing criteria for meteorological satellite systems operating around 18 GHz
|
Eumetsat
|
|
2006-12-19 |
|
[ 54 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SA.1015 - Bandwidth requirements for deep-space research
|
WP 7B
|
|
2006-09-14 |
|
[ 53 ]
|
Draft new Recommendation ITU-R SA.[PATTERN SRS] - Reference antenna patterns of large-aperture space research service earth stations to be used for compatibility analyses involving a large number of distributed interference entries in the bands 31.8-32.3 GHz and 37.0-38.0 GHz
|
WP 7B
|
|
2006-09-14 |
|
[ 52 ]
|
Draft new Report ITU R SA.[SRS ANT] - Mathematical gain models of large-aperture SRS earth station antennas for compatibility analysis involving a large number of distributed interference sources
|
WP 7B
|
|
2006-09-14 |
|
[ 51 ]
(Rev.1) |
Draft new Recommendation ITU-R SA.[THz-SPACE-to-SPACE] - Technical and operational characteristics of space-to-space communication systems operating around 354 and 366 THz
|
WP 7B
|
235/7
|
2006-09-14 |
|
[ 50 ]
|
Draft new Recommendation ITU-R SA.[8 GHz USE] - Use of the 8 025-8 400 MHz band by Earth exploration satellites
|
WP 7B
|
139/7
|
2006-09-14 |
|
[ 49 ]
(Rev.1) |
Draft revision of Recommendation ITU-R RA.1031-1 - Protection of the radio astronomy service in frequency bands shared with other services
|
WP 7D
|
145/7
|
2006-09-14 |
|
[ 48 ]
(Rev.1) |
Draft new Report ITU-R RA.[PULSAR] - Radio observations of pulsars for precision timekeeping
|
WP 7D
|
|
2006-09-14 |
|
[ 47 ]
|
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7
|
Chairman, SG 7
|
|
2006-01-25 |
|
[ 46 ]
|
Liaison statement to Study Group 7
|
SC-WP
|
|
2006-01-24 |
|
[ 45 ]
|
Liaison statement to ITU-R SGs - Request for registration and dissemination of ITU-T technology watch function
|
TSAG
|
|
2005-11-17 |
|
[ 44 ]
|
Final List of Participants - Study Group 7
|
Director, BR
|
|
2005-11-15 |
|
[ 43 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-11-14 |
|
[ 42 ]
|
Liaison statement to ITU-R Study Groups from the Coordination Committee for Vocabulary
|
Coord. Committee for Vocabulary
|
|
2005-11-14 |
|
[ 41 ]
(Rev.1) |
Draft revision of Recommendation ITU-R RA.611 - Protection of the radio astronomy service from spurious emissions
|
WP 7D
|
145/7
|
2005-11-14 |
|
[ 40 ]
(Rev.1) |
Draft new Recommendation ITU-R RA.[EESS-RAS] - Mutual planning between the EESS (active) and the RAS in the 94 GHz and 130 GHz bands
|
WP 7D
|
129/7
|
2005-11-14 |
|
[ 39 ]
|
Draft liaison statement from Study Group 7 to the special committee on regulatory/procedural matters - Optional information for the advance publication of a non geostationary-satellite network not subject to coordination under section II of Article 9
|
WP 7B
|
|
2005-11-14 |
|
[ 38 ]
(Rev.1) |
Draft revision of Recommendation ITU-R RA.517-3 - Protection of the radio astronomy services from transmitters operating in adjacent bands
|
WP 7D
|
|
2005-11-14 |
|
[ 37 ]
|
Liaison statement to the Radiocommunication Bureau - Examination under No.S11.32 of frequency assignments relating to an inter-satellite (space-to-space) network composed of a space station on a geostationary satellite and a space station on a non-geostationary satellite
|
WP 7B
|
|
2005-11-14 |
|
[ 36 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SA.1165-1 - Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands
|
WP 7C
|
|
2005-11-14 |
|
[ 35 ]
|
Draft new Question ITU-R [Doc. 7/35] - Interference to standard-frequency and time signal services in the low-frequency band caused by noise from electrical sources
|
WP 7A
|
|
2005-11-11 |
|
[ 34 ]
(Rev.1) |
Draft new Recommendation ITU-R SA.[MITIGATE] - Mitigation technique to facilitate the use of the 1 215-1 300 MHz band by the Earth exploration-satellite service (active) and the space research service (active)
|
WP 7C
|
|
2005-11-11 |
|
[ 33 ]
(Rev.1) |
Draft revision to Recommendation ITU-R SA.1166-2 - Performance and interference criteria for spaceborne active sensors
|
WP 7C
|
|
2005-11-11 |
|
[ 32 ]
|
Draft new Report ITU-R SA.[ACTIVE 13.5 GHz]
|
WP 7C
|
|
2005-11-11 |
|
[ 31 ]
(Rev.1) |
Draft revised Recommendation ITU-R SA.577-5 - Preferred frequencies and required bandwidths for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services
|
WP 7C
|
|
2005-11-11 |
|
[ 30 ]
|
Summary Report of actions taken on the first day of the meeting of Radiocommunication Study Group 7 (7 November 2005)
|
Chairman, SG 7
|
|
2005-11-11 |
Results:79 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):