Page 27 - ITU Indicators for Smart Sustainable Cities – Pilot project Singapore
P. 27

ITU Indicators for Smart Sustainable Cities – Pilot project Singapore

                              Sub-                                                               Singapore
              Dimension                              Indicator           KPI definition
                            dimension                                                         Reported Value
                Smart         D6.1      I   6.1.4    Leakage in    Proportion of water leakage in   No Data
             Infrastructure  Infrastructure/        water supply     the water supply system.    Reviewed
              and Mobility   connection to            system
                            services –
                           piped water



                Smart         D6.1      A  6.1.1   Availability of   Proportion of users with real-  0%
             Infrastructure  Infrastructure/       visualised real-  time information on quantum
              and Mobility   connection to             time        of water usage and water use
                            services –              information             pattern.
                           piped water            regarding water
                                                        use
             Reviewed:

             Our Water, Our Future – p7 (2015). https://www.pub.gov.sg/Documents/PUBOurWaterOurFuture.pdf
             Data provided by a direct survey from the Singapore Public Utilities Board.

             Status: KPI Verified
                Smart         D6.1      A  6.1.2   Quality of piped   Quality of water as supplied to   100%
             Infrastructure  Infrastructure/           water               end users.
              and Mobility   connection to
                            services –
                           piped water

             Reviewed:

             Data provided by the Public Utilities Board Laboratory information Management System.
             Status: KPI Verified
                Smart         D6.2      I   6.2.1   Quality of piped   Proportion of the sewage   15.01%
             Infrastructure  Infrastructure/           water        system monitored using ICT
              and Mobility   connection to
                            services –
                             sewage

             Reviewed:
             Data retrieved from a direct survey from the Singapore Public Utilities Board.
             Status: KPI Verified

                Smart         D6.2      I   6.2.2    Drainage       Proportion of the drainage    No Data
             Infrastructure  Infrastructure/          system      systems monitored in real-time   Reviewed
              and Mobility   connection to          management             using ICT.
                            services –               using ICT
                             sewage












                                                           23
   22   23   24   25   26   27   28   29   30   31   32