Page 1082 - 5G Basics - Core Network Aspects
P. 1082

2                                                 Transport aspects


            The next upstream logical frame in Figure VI.2(b) is configured for a 2x2 vector matrix with lines 3 and 4 in
            the DOI. This logical frame does not contain a sync symbol. Lines 1 and 2 are only transmitting in the NOI.
            Lines  1  and  2  are  configured  with  TBUDGET=TTR=4  and  TA=0.  Lines  3  and  4  are  both  configured  with
            TBUDGET=8 and TA=0 and the DRA/VCE has assigned TIQ=0 indicating that if there is no data available for
            the slots in the DOI, a quiet symbol may be sent.


                        TDD frame (M = 23 symbol  s; T F = M × T seconds)  TDD sync frame (M = 23symbol  s; T F  = M × T seconds)
                                                                                   S
                                            S
                                         F
                                                                      F
                                                                                 F
                               F
                            Downstream M  = 14     M  = 8         Downstream M  = 14     M  = 8
                                                    us
                                    ds
                                                                                          us
                                                                          ds
              Line 1       rmc  d  d  d  d        Upstream       rmc  d  d  d  d         Upstream      rmc  ...
                           TTR  = 5; TBUDGET  = 5; TA  = 0;      TTR  = 5; TBUDGET  = 5; TA  = 0;
                                                                           ds
                                                                   ds
                                         ds
                             ds
                                                                               ds
                                     ds
                           [TIQ = 1, B' = B = 0];                [TIQ = 1, B' = B = 0];
              Line 2 idle  rmc  d  d  d  d  d  d  d  d  idle  Upstream idle  rmc  d  d  d  d  d  d  d  d  idle  Upstream idle  rmc  ...
                           TTR  = 5; TBUDGET  = 11; TA  = 0;     TTR  = 5; TBUDGET  = 11; TA  = 0;
                                     ds
                             ds
                                                                           ds
                                         ds
                                                                   ds
                                                                                ds
                           [TIQ = 1, B' = 6, B = 4];             [TIQ = 1, B' = 6,  B = 4];
              Line 3  d    rmc  d  d  d  d  d  d  d  d  d  Upstream  d  rmc  d  d  d  d  d  d  d  d  d  Upstream  d  rmc  ...
                           TTR  = 5; TBUDGET  = 11; TA  = 0;     TTR  = 5; TBUDGET  = 11; TA  = 0;
                             ds
                                                                                ds
                                                                   ds
                                     ds
                                                                           ds
                                         ds
                           [TIQ = 1, B' = 6, B = 6];             [TIQ = 1, B' = 6, B = 6];
              Line 4  d  d  d  d  rmc  d  d  d  d  d  d  d  d  d  Upstream  d  d  d  rmc  d  d  d  d  d  d  d  d  d  Upstream  d  d  d  d  rmc  ...
                           TTR  =5; TBUDGET  = 13 or 14 ; TA  = 0;  TTR  = 5; TBUDGET  = 14; TA  = 0;
                                    ds
                             ds
                                                                   ds
                   DRMC = 4  [TIQ = 1, B' =8 or 9 , B = 8];  ds  [TIQ = 1, B' = 9, B = 9]; ds  ds
                      ds
                t = 0                                 t = T F                               t = 2T F
                               NOI                DOI                 NOI                DOI
                                   DS logical frame (T ) containing DS sync symbol  DS logical frame without DS sync symbol
                                            F
                 rmc rmc symbol  d  data symbol  =  q  quiet symbol  idle idle symbol  sync symbol
                                                                                                   G.9701(14)_FVI.2a
                 TTR = duration of the normal operation interval  TA = number of quiet symbols immediately after TTR
                 TBUDGET+TA–1 = index of the last symbol position in a logical frame eligible for carrying a data symbol
                                                        (a) Downstream
                                                                    s;
                     TDD sync frame (M = 23symbol s; T F  = M × T seconds)  TDD sync frame (M = 23 symbol T F = M × T seconds)
                                         F
                                           S
                                                                        F
                                                              F
                                                                          S
                              F
                      M  = 14      Upstream M  = 8   M  = 14       Upstream M  = 8    M  = 14   M  = 8
                                                                         us
                                                       ds
                                          us
                       ds
                                                                                       ds
                                                                                                  us
                Line 1  Downstream    rmc  d  d  d   Downstream      rmc  d  d  d   Downstream       rmc  d  ...
                                      TTR  =4; TBUDGET  = 4; TA  = 0;  TTR  = 4; TBUDGET  = 4; TA  = 0;
                                                                       us
                                                    us
                                                                                    us
                                                us
                                                                               us
                                        us
                                      [B' = B = 0];                  [B' = B = 0];
                Line 2  Downstream    rmc  d  d  d  d  Downstream  idle idle  rmc  d  d  d  Downstream  rmc  d  ...
                                      TTR  = 4; TBUDGET  = 8; TA  = 0;  TTR  = 4; TBUDGET  = 4; TA  = 0;
                                        us
                                                                       us
                                                us
                                                                               us
                                                    us
                                                                                    us
                                      [B' = 4, B = 1];               [B' = B = 0];
                Line 3  Downstream  d  rmc  d  d  d  d  Downstream  d  idle  rmc  d  d  d  d  Downstream  d  q  q  rmc  d  ...
                                      TTR  = 4; TBUDGET  = 8; TA  = 0;  TTR  = 4; TBUDGET  = 8; TA  = 0;
                                                                                    us
                                                                               us
                                        us
                                                us
                                                                       us
                                                    us
                                      [B' = 4, B = 2];               [B' = 4, B = 2];
                Line 4  Downstream  d  rmc  d  d  d  d  Downstream  d  d  rmc  d  d  d  d  Downstream  d  d  d  rmc  d  ...
                                      TTR  = 4; TBUDGET  = 8; TA  = 0;  TTR  = 4; TBUDGET  = 8; TA  = 0;
                                                                               us
                                        us
                                                    us
                                                                                    us
                                                us
                                                                       us
                                      [B' = 4, B = 3];               [B' = 4, B = 4];
                 t = 0         DRMC  = 3         t = T F
                                  us
                                       Upstream NOI    Upstream DOI   Upstream NOI    Upstream DOI
                                          Upstream logical frame (T ) containing sync symbol  Upstream logical frame (T ) without sync symbol
                                                                                      F
                                                     F
                   rmc rmc symbol  d  data symbol  =  q  quiet symbol  idle idle symbol  sync symbol
                                                                                                   G.9701(14)_FVI.2b
                  TTR = duration of the normal operation interval  TA = number of quiet symbols immediately after TTR
                  TBUDGET+TA–1 = index of the last symbol position in a logical frame eligible for carrying a data symbol
                                                         (b) Upstream
                              Figure VI.2 – Example 1: Reduction of vector matrix size in the DOI
            If the traffic patterns allow, it is possible that the vector processing may be turned off in the DOI if the data
            symbols are distributed across the available symbol periods so as to avoid any common slots with the other
            lines in the vector group. An example is given in Figure VI.3.
            Figure VI.3(a) shows a downstream example where no symbols from different lines in the vector group
            occupy the same symbol intervals in the DOI. In all cases, the DRA/VCE would likely set TIQ=0 forcing a
            quiet symbol to be sent in a data eligible symbol position in the DOI. An example is shown for line 3 in the
            logical frame that is without the sync symbol.
            1072
   1077   1078   1079   1080   1081   1082   1083   1084   1085   1086   1087