Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5D : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP5D  C 

UIT-R WP5D

Systèmes IMT

Resultats:1064 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 339 ]  
 
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast     WP 1A     2013-06-14
[ 338 ]  
 
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T     WP 1A     2013-06-14
[ 337 ]  
 
Liaision statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)     WP 1A     2013-06-14
[ 336 ]  
 
Draft revision of Recommendations ITU-R M.1580-4 and ITU-R M.1581-4 (3GPP2)     Director, BR     2013-06-12
[ 335 ]  
 
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5A, 5C and 5D for information) - Preparations for WRC-15 Agenda item 1.1 - Additional technical and operational characteristics     WP 5B     2013-06-11
[ 334 ]  
(Rev.1) 
Initial submission of material for update of section 5.1 and section 5.3 of Recommendation ITU-R M.1457 to revision 12     Alliance for Telecommunications Industry Solutions     2013-06-07
[ 333 ]  
 
Report of Correspondence Group     CG Convenor     2013-06-10
[ 332 ]  
 
Draft revision of Recommendations ITU-R M.1580-4 and ITU-R M.1581-4 (TIA TR 45)     Director, BR     2013-06-07
[ 331 ]  
 
Liaison statement to ITU-T Study Group 5 (Question 14/5) (copy to ITU-D Study Group 2 and ITU-R Working Party 5D for information) - Use of spectrum and radio technology low cost sustainable telecommunication infrastructure for rural communications in developing countries     WP 5A     2013-06-05
[ 330 ]  
 
Liaison statement to Working Party 5D - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3     WPs 5A and 5C     2013-06-04
[ 329 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1     WP 5A     2013-06-04
[ 328 ]  
 
Liaison statement to Working Party 5D - Response from Working Party 5A to the ICT sectorial consultation on the role of ICTs to promote the inclusion of persons with disabilities     WP 5A     2013-06-04
[ 327 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Party 5D) - Update of fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.1     WP 5C     2013-06-04
[ 326 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Party 5D) - Update of fixed service antenna modelling characteristics     WP 5C     2013-06-04
[ 325 ]  
 
Liaison statement to Working Parties 5A and 5D and ITU-T Study Groups 13 and 15 - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile boadband systems     WP 5C     2013-06-04
[ 324 ]  
 
Liaison statement to Working Parties 5A and 5D (copy to Working Party 5B) - Studies on availability of frequency bands and/or tuning ranges for worldwide and/or regional harmonization and conditions for their use by terrestrial electronic news gathering systems     WP 5C     2013-06-04
[ 323 ]  
 
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems     WPs 5A, 5B and 5C     2013-06-03
[ 322 ]  
 
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5 & 9 (copy to ITU-R Working Parties 1C and 5D for information) - Coexistence of wired and wireless communications systems - Revison of Recommendation ITU-T K.60     WPs 5A, 5B and 5C     2013-06-03
[ 321 ]  
 
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST     WPs 5A, 5B and 5C     2013-06-03
[ 320 ]  
 
Results of the 20th RAG meeting     Chairman, SG 5     2013-05-27
[ 319 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to working Party 5D) - Suitable frequency ranges for IMT above 6 GHz     WP 4A     2013-05-27
[ 318 ]  
 
Liaison statement to Working Party 5D (copy to Joint Task Group 4-5-6-7) - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 4A     2013-05-27
[ 317 ]  
 
DECT information regarding the update of Recommendation ITU-R M.1457     European Telecommunications Standards Institute   229/8   2013-05-21
[ 316 ]  
 
Further consideration of the coexistence of radar systems in the frequency band 2 700-3 100 MHz - Rationalisation of the band for potential future sharing with IMT systems under WRC-15 Agenda item 1.1     Telstra Corporation Ltd.     2013-05-13
[ 315 ]  
 
Update Report on CITEL PCC.II activities     CITEL Rapporteur     2013-05-09
[ 314 ]  
 
Information on Canada's commercial mobile spectrum Outlook document     Canada     2013-05-09
[ 313 ]  
 
Liaison statement - Request to provide security contacts     ITU-T SG 17     2013-05-08
[ 312 ]  
 
Initial submission of material for update of Section 5.4 of Recommendation ITU-R M.1457 to Revision 12     Alliance for Telecommunications Industry Solutions     2013-05-02
[ 311 ]  
 
Questions ITU-R 133-1/6 and 136-1/6     SG 6     2013-04-19
[ 310 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Paty 5D) - Relevant ITU-R Recommendations and Reports pertaining to protection criteria and system characteristics of the science services allocated in certain bands above 6 GHz     WPs 7B and 7C     2013-04-15
[ 309 ]  
 
Liaison Statement from ITU-D SG2 Question 25/2 to ITU-R Working Party 5D on the Global Trends Handbook and the Report on Access technology for broadband telecommunications including IMT, for developing countries [Copy to ITU-D Study Group 2 Question 10-3/2]     ITU-D SG 2     2013-04-11
[ 308 ]  
 
Reply to liaison statement on draft Recommendation Y.energyMRM     ITU-T SG 13     2013-03-19
[ 307 ]  
 
Response to liaison statement from ITU-R Working Party 5D on "Appointment of sub-Working Group Handbook, Chairman and work progress"     ITU-T SG 13     2013-03-18
[ 306 ]  
 
Response to liaison statement from ITU-R Working Party 5D on "Work progress on development of Handbook on "Global Trends in IMT""     ITU-T SG 13     2013-03-18
[ 305 ]  
+Corr.1 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World Meteorological Organization     2013-03-06
[ 304 ]  
 
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 - IMO's concerns in relation to the wide range of frequency bands identified by ITU-R for future assessment of the suitability for IMT     International Maritime Organization     2013-02-28
[ 303 ]  
 
Assignment of a document submitted to Study Group 5 - ITU-R Study Groups Vocabulary work     Chairman, SG 5     2013-02-22
[ 302 ]  
 
Reply LS to ITU-R Working Party 1A and Working Parties 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-T SG 9     2013-02-19
[ 301 ]  
 
Liaison statement to ITU-R Working Party 5D - Development of a Recommendation for eco-specifications and rating criteria for mobile phones eco-rating programs     ITU-T SG 5     2013-02-18
[ 300 ]  
+Ch.1-7 
Report on the meeting of Working Party 5D (Geneva, 30 January to 6 February 2013)     Chairman, WP 5D     2013-02-06
[ 299 ]  
 
Final List of Participants - Working Party 5D (Geneva, 30 January - 6 February 2013)     Director, BR     2013-02-06
[ 298 ]  
 
Update on standards acitivities     Region 2 Rapporteur     2013-02-04
[ 297 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur     2013-01-29
[ 296 ]  
(Rev.1) 
Activities related to IMT in Region 3     Region 3 Rapporteur     2013-01-28
[ 295 ]  
 
Consideration of frequency arrangements under WRC-15 Agenda item 1.2     Telefónica, S.A.     2013-01-23
[ 294 ]  
 
Possible frequency arrangement for the 700 MHz band     TeliaSonera AB     2013-01-23
[ 293 ]  
 
Proposals for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]     Telefon AB - LM Ericsson     2013-01-23
[ 292 ]  
 
Proposals for the preliminary draft new Recommendation ITU-R M.[IMT.VISION]     Telefon AB - LM Ericsson     2013-01-23
[ 291 ]  
 
Update on the methodology for calculation of spectrum requirements for IMT (Recommendation ITU-R M.1768)     Brazil (Federative Republic of)     2013-01-23
[ 290 ]  
 
Update on the development of LTE in the 450 MHz band     Brazil (Federative Republic of)     2013-01-23
Resultats:1064 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2021-01-11