Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5D Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP5D Documents de réunions
  Nb max de documents affichés/page:
Résultats: 71 documents
Result Page:  1 - 2 - 3  - Suivant
Numéro  Date Source Titre
  Numéro  Mise à disposition Taille  
 
[ TD 620 ]  2015-06-17 WP 5D   Draft liaison statement to Working Parties 6A and 6B - Audio-visual capabilities and applications supported by terrestrial IMT systems    
  [ TD 620 ]  - English -  Word 2010 2015-06-17 [09:52]  68'396  octets  
 
[ TD 619 ]  2015-06-17 SWG OOBE   Liaison statement to GCS proponents of IMT-Advanced related to revising of Recommendations for generic unwanted emission characteristics    
  [ TD 619 ]  - English -  Word 2010 2015-06-17 [09:51]  65'539  octets  
 
[ 1045 ]  2015-07-06 ITU-T SG 15   Liaison statement on ITU-T SG15 OTNT Standardization work plan    
  [ 1045 ]  - English -  Word 2010 2015-07-06 [09:04]  281'893  octets  
 
[ 1042 ]  2015-06-22 Chairman, WP 5D   Report on the twenty-second meeting of Working Party 5D (San Diego, USA - 10-18 June 2015)    
  [ 1042 ] Chapter 03 - English -  Word 2010 2015-07-01 [10:23]  116'030  octets Meeting Report of Working Group General Aspects  
  [ 1042 ] Chapter 02 - English -  Word 2010 2015-07-01 [10:23]  998'193  octets ITU-R Working Party 5D Structure and Workplan  
  [ 1042 ] Chapter 07 - English -  Word 2010 2015-06-30 [14:56]  567'088  octets General matters  
  [ 1042 ] Chapter 06 - English -  Word 2010 2015-06-29 [15:11]  65'269  octets Meeting Report of Ad Hoc Workplan  
  [ 1042 ] Chapter 04 - English -  Word 2010 2015-06-29 [15:03]  6'559'180  octets Meeting Report of Working Group Spectrum Aspects  
  [ 1042 ] Chapter 05 - English -  Word 2010 2015-06-29 [14:51]  9'076'795  octets Meeting Report of Working Group Technology Aspects  
 
[ 1044 ]  2015-06-30 SG 4   Reply liaison statement to Study Group 5 (copy for information to Working Party 4B, 4C and 5D) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4    
  [ 1044 ]  - English -  Word 2010 2015-07-01 [14:10]  64'671  octets  
 
[ 1043 ]  2015-06-22 WP 1A   Liaison statement to external organizations (copy to WPs 5A and 5D) - Report ITU-R SM.[SMART_GRID] on the Smart Grid project    
  [ 1043 ]  - English -  Word 2010 2015-06-23 [14:50]  62'857  octets  
 
[ ADM 201 ]  2015-06-17 N/A   Agenda for the third meeting of SWG Sharing Studies - Tuesday, 16 June 2015 at 14:00 hours (Room Cortez 1)    
  [ ADM 201 ]  - English -  Word 2010 2015-06-17 [10:23]  62'893  octets  
 
[ ADM 200 ]  2015-06-17 SWG Frequency Arrangements   Draft agenda for SWG Frequency arrangements - Tuesday, 16 June at 09:00 hours (Room Cortez 1)    
  [ ADM 200 ]  - English -  Word 2010 2015-06-17 [10:22]  64'390  octets  
 
[ ADM 197 ]  2015-06-12 Chairman, WG Technology Aspects   Draft agenda for WG Technolgy Aspects special session on future work - Thursday, 11 June 2015 at 17:30 hours (Cortez 2+3 Room)    
  [ ADM 197 ]  - English -  Word 2010 2015-06-12 [09:07]  62'364  octets  
 
[ ADM 186 ]  2015-06-11 Chairman, SWG Traffic   Draft agenda for the 1st to 6th session of SWG Traffic    
  [ ADM 186 ]  - English -  Word 2010 2015-06-11 [09:37]  63'079  octets  
 
[ ADM 206 ]  2015-06-19 Chairman, WP 5D   Agenda for the Closing Plenary of the 22th meeting of Working Party 5D - Thursday, 18 June 2015 at 13:30 hours (Room Cortez)    
  [ ADM 206 ]  - English -  Word 2010 2015-06-19 [09:06]  72'520  octets  
 
[ TD 589 ]  2015-06-16 SWG Radio Aspects   Draft liaison statement to Working Party 5C (copy to ITU-T Study Group 15, MEF and NGMN) - Architecture and Topology of IMT Networks    
  [ TD 589 ] Revision 2 - English -  Word 2010 2015-06-19 [08:53]  64'370  octets  
  [ TD 589 ] Revision 1 - English -  Word 2010 2015-06-16 [09:25]  64'143  octets  
 
[ TD 639 ]  2015-06-19 Chairman, WG Technology Aspects   Meeting Report of Working Group Technology Aspects    
  [ TD 639 ]  - English -  Word 2010 2015-06-19 [08:54]  70'434  octets  
 
[ TD 638 ]  2015-06-19 Chairman, WG Spectrum Aspects   Meeting Report of Workin Group Spectrum Aspects    
  [ TD 638 ]  - English -  Word 2010 2015-06-19 [08:54]  66'122  octets  
 
[ TD 637 ]  2015-06-19 Chairman, WG General Aspects   Meeting Report of Working Group General Aspects    
  [ TD 637 ]  - English -  Word 2010 2015-06-19 [08:54]  63'324  octets  
 
[ TD 636 ]  2015-06-19 Chairman, Ad Hoc Workplan   Meeting Report of Ad Hoc Workplan    
  [ TD 636 ]  - English -  Word 2010 2015-06-19 [08:53]  104'802  octets  
 
[ 1041 ]  2015-06-19 Director, BR   Final List of Participants - Working Party 5D (San Diego, California, 10-18 June 2015)    
  [ 1041 ]  - English -  PDF (acrobat) 2015-06-22 [12:18]  358'563  octets  
 
[ TD 611 ]  2015-06-17 SWG Sharing Studies   Draft new Report ITU-R M.[TDD.COEXISTENCE] - Coexistence of two TDD networks in the 2 300-2 400 MHz band    
  [ TD 611 ] Revision 1 - English -  Word 2010 2015-06-18 [10:58]  315'088  octets  
 
[ ADM 203 ]  2015-06-18 WG General Aspects   Agenda of 3RD meeting of Working Group General Aspects    
  [ ADM 203 ] Revision 1 - English -  Word 2010 2015-06-18 [10:04]  62'963  octets  
Résultats: 71 documents
Result Page:  1 - 2 - 3  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2015-07-06