International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 387 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz     WP 1A     2015-06-16
[ 386 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations     WP 1A     2015-06-12
[ 385 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 5D, 6A and 7D) - Developments concerning co-existence issues     WP 1A     2015-06-12
[ 384 ]  
 
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     WP 1A     2015-06-12
[ 383 ]  
 
Revision of Preliminary draft new Recommendation ITU-R F.[FS DEPLOY]     France     2015-06-12
[ 382 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7B and 7D - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WP 1B     2015-06-11
[ 381 ]  
 
Reply to liaison statements from Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 1A     2015-06-09
[ 380 ]  
 
Liaison statement on the extension of coax baseband profiles of ITU-T G.hn to 200 MHz     ITU-T SG 15     2015-06-02
[ 379 ]  
 
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2     WP 7B     2015-05-28
[ 378 ]  
 
Liaison statement on development of draft new Question ITU-R [PERFORM]/5 - Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems     ITU-T SG 12     2015-05-20
[ 377 ]  
 
Liaison statement on new Question "Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems"     ITU-T SG 13     2015-05-14
[ 376 ]  
 
Results of the 22nd RAG meeting     Chairman, SG 5     2015-05-13
[ 375 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     WP 3M     2015-05-08
[ 374 ]  
(Rev.1) 
Progress of the studies requested by WRC Resolutions and Recommendations (except those directly related to WRC-15 agenda items)     Chairman, SG 5     2015-04-15
[ 373 ]  
 
Liaison statement on time sensitive networking for fronthaul     Institute of Electrical and Electronics Engineers, Inc.     2015-03-25
[ 372 ]  
 
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     WP 6A     2015-03-03
[ 371 ]  
 
Liaison statement to Working Party 5C (copy to ITU-T Study Group 15 and MEF) - Architecture and topology of IMT networks     WP 5D     2015-02-11
[ 370 ]  
 
Liaison statement to Working Party 1B (copy to WPs 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     WP 5D     2015-02-10
[ 369 ]  
 
Liaison statement to ITU-T Study Group 13 and ITU-R Working Parties 4B and 5C (copy to ITU-D Study Groups 1 and 2) - Handbook on "Global trends in IMT"     WP 5D     2015-02-10
[ 368 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D     2015-02-10
[ 367 ]  
 
Liaison statement on Recommendations ITU-T K.60 - Coexistence of wired and wireless communication systems     ITU-T SG 5     2015-02-10
[ 366 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R SG5 WP 5C on scope of work of Question 2/1     ITU-D SG 1 Rapporteur     2015-01-07
[ 365 ]  
 
Liaison statement on G.supp.Radio-over-Fiber     ITU-T SG 15     2014-12-12
[ 364 ]  
 
Liaison statement to ITU-R Working Party 5C - WRC-15 agenda item 1.5     WP 5B     2014-12-10
[ 363 ]  
 
Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz     WP 6A     2014-12-01
[ 362 ]  
 
Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards     WP 5B     2014-11-10
[ 361 ]  
 
Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     WP 5B     2014-11-10
[ 360 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A     2014-11-10
[ 359 ]  
 
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     WP 5B     2014-11-05
[ 358 ]  
+Ann.1-10 
Report of the fourteenth meeting of Working Party 5C (Geneva, 27 October - 5 November 2014)     Chairman, WP 5C     2014-11-05
[ 357 ]  
(Rev.2) 
Final list of participants - Working Party 5C (Geneva, 27 October - 5 November 2014)     Director, BR     2014-05-11
[ 356 ]  
 
Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4     WP 5A     2014-11-04
[ 355 ]  
 
Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     WP 5A     2014-10-31
[ 354 ]  
 
List of documents issued (Documents 5C/298 - 5C/354)     BR Study Groups Department     2014-10-27
[ 353 ]  
(Rev.1) 
Liaison statement on Radio-over-fiber (RoF) Technologies and definitions of mobile fronthaul/backhaul     ITU-T SG 15     2014-10-27
[ 352 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 5A) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     WP 5D     2014-10-23
[ 351 ]  
 
Preliminary draft new Report ITU-R M.[WAIC_SHARING_22/23 GHZ] - Sharing studies between wireless avionics intra-communication systems and systems in the 22.5-22.55 GHz and 23.55-23.6 GHz frequency bands and compatibility studies with systems allocated to the passive services in the 22.21-22.5 GHz and 23.6-24.0 GHz frequency bands     United States of America     2014-10-17
[ 350 ]  
 
Considerations on revisions of Recommendations ITU-R F.1247-3, F.1249-3 and F.1509-2     Japan     2014-10-20
[ 349 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems     Japan     2014-10-20
[ 348 ]  
 
Updating of supporting material from administrations for the development of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLY] - Statistical information for point-to-point systems in the fixed service     Japan   252/5   2014-10-20
[ 347 ]  
 
Proposed revision of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service     Japan   252/5   2014-10-20
[ 346 ]  
 
Statistical information on point-to-point fixed service deployment in Poland     ORANGE POLSKA S.A.     2014-10-20
[ 345 ]  
 
Error performance and availability issues in ITU: Background and current status     Huawei Technologies Co. Ltd.     2014-10-20
[ 344 ]  
 
What are the key items related to the performance and availability objectives and requirements of microwave systems, including packed-bases systems     China (People's Republic of)     2014-10-20
[ 343 ]  
 
Proposal for a new Question on frequency share and operation coordination for HF sky-wave communication stations with moderate/high emission power     China (People's Republic of)     2014-10-20
[ 342 ]  
 
Proposed revision of working document towards preliminary draft new Recommendation ITU-R R.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service     Canada     2014-10-17
[ 341 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and automotive collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz     Canada     2014-10-17
[ 340 ]  
 
Preliminary draft revision of Recommendation ITU-R F.1778 - Channel access requirements for HF adaptive systems in the fixed and land mobile services     Canada     2014-10-17
[ 339 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial [mobile] broadband systems     Canada   253/5, 247/5   2014-10-17
[ 338 ]  
 
Proposed revisions to preliminary draft new Report ITU-R F.[FS USE-TRENDS], "Fixed service use and future trends"     United States of America     2014-10-17
Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06