International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5C Recently posted -  Search Meeting Documents
   
ITU-R WP5C Meeting Documents
  Max # of documents displayed/page:
Results: 49 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 365 ]  2014-12-12 ITU-T SG 15   Liaison statement on G.supp.Radio-over-Fiber     N/A  
  [ 365 ]  - English -  Word 2010 2014-12-15 [10:52]  2'234'119  bytes  
 
[ 364 ]  2014-12-10 WP 5B   Liaison statement to ITU-R Working Party 5C - WRC-15 agenda item 1.5     N/A  
  [ 364 ]  - English -  Word 2010 2014-12-10 [14:08]  37'229  bytes  
 
[ 358 ]  2014-11-05 Chairman, WP 5C   Report of the fourteenth meeting of Working Party 5C (Geneva, 27 October - 5 November 2014)     N/A  
  [ 358 ]  - English -  Word 2010 2014-12-12 [11:17]  64'337  bytes Report on the fourteenth meeting of Working Party 5C (Geneva, 27 October to 5 November 2014)  
  [ 358 ] Annex 09 - English -  Word 2010 2014-12-10 [08:50]  75'030  bytes Liaison statement to ITU-T Study Groups 12, 13 and 15 - Development of draft new Question ITU-R [PERFORM]/5 - Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems  
  [ 358 ] Annex 10 - English -  Word 2010 2014-12-09 [17:05]  41'235  bytes List of output (TEMP) documents - (Documents 5C/TEMP/171 - 5C/TEMP/195)  
  [ 358 ] Annex 02 - English -  Word 2010 2014-11-20 [08:31]  1'195'466  bytes Supporting material from administrations for the development of preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Statistical information for point-to-point systems in the fixed service  
  [ 358 ] Annex 08 - English -  Word 2010 2014-11-06 [14:27]  1'256'706  bytes Working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems  
  [ 358 ] Annex 06 - English -  Word 2010 2014-11-06 [11:01]  57'041  bytes Preliminary review of the Questions assigned to Working Party 5C  
  [ 358 ] Annex 07 - English -  Word 2010 2014-11-06 [10:35]  53'059  bytes Preliminary Draft Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2  
  [ 358 ] Annex 03 - English -  Word 2010 2014-11-06 [09:07]  65'787  bytes Preliminary draft revision of Recommendation ITU-R F.758-5 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and system in other services and other sources of interference  
  [ 358 ] Annex 04 - English -  Word 2010 2014-11-06 [09:05]  7'334'638  bytes Working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and automotive collision avoidance radar operating in the bands 76-77 GHz and 77 81 GHz  
  [ 358 ] Annex 05 - English -  Word 2010 2014-11-06 [08:47]  40'102  bytes [Working document towards a] preliminary draft new Question ITU-R F.[HF ENVIRONMENT] - Technical and operational principles for HF sky-wave communication stations to improve the HF environment  
  [ 358 ] Annex 01 - English -  Word 2010 2014-11-06 [08:38]  86'548  bytes Preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service  
 
[ 363 ]  2014-12-01 WP 6A   Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz     N/A  
  [ 363 ]  - English -  Word 2010 2014-12-02 [08:15]  43'410  bytes  
 
[ 357 ]  2014-05-11 Director, BR   Final list of participants - Working Party 5C (Geneva, 27 October - 5 November 2014)     N/A  
  [ 357 ] Revision 2 - English -  PDF (acrobat) 2014-11-13 [11:23]  578'478  bytes  
 
[ 359 ]  2014-11-05 WP 5B   Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     N/A  
  [ 359 ]  - English -  Word 2010 2014-11-11 [15:52]  37'741  bytes  
 
[ 362 ]  2014-11-10 WP 5B   Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards     N/A  
  [ 362 ]  - English -  Word 2010 2014-11-10 [16:51]  1'292'974  bytes  
 
[ 361 ]  2014-11-10 WP 5B   Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     N/A  
  [ 361 ]  - English -  Word 2010 2014-11-10 [18:06]  53'044  bytes  
 
[ 360 ]  2014-11-10 WP 5A   Liaison statement to Working Party 1A (copy for information to Workign Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     N/A  
  [ 360 ]  - English -  Word 2010 2014-11-10 [16:57]  40'447  bytes  
 
[ ADM 19 ]  2014-11-04 Chairman, WP 5C   Draft agenda for the closing Plenary of the fourteenth meeting of Working Party 5C - Wednesday, 5 November 2014 at 9:00 hours (Room A, ITU Tower)     N/A  
  [ ADM 19 ]  - English -  Word 2010 2014-11-04 [16:23]  38'177  bytes  
 
[ 356 ]  2014-11-04 WP 5A   Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4     N/A  
  [ 356 ]  - English -  Word 2010 2014-11-04 [10:56]  36'768  bytes  
 
[ 355 ]  2014-10-31 WP 5A   Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     N/A  
  [ 355 ]  - English -  Word 2010 2014-10-31 [17:01]  37'466  bytes  
 
[ ADM 18 ]  2014-10-27 Chairman, WP 5C   Agenda, schedule and allocation of contributions for the fourteenth meeting     N/A  
  [ ADM 18 ] Revision 1 - English -  Word 2010 2014-10-27 [15:06]  50'115  bytes  
 
[ 353 ]  2014-10-27 ITU-T SG 15   Liaison statement on Radio-over-fiber (RoF) Technologies and definitions of mobile fronthaul/backhaul     N/A  
  [ 353 ] Revision 1 - English -  Word 2010 2014-10-27 [12:10]  2'194'220  bytes  
 
[ 348 ]  2014-10-20 Japan   Updating of supporting material from administrations for the development of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLY] - Statistical information for point-to-point systems in the fixed service     252/5  
  [ 348 ]  - English -  Word 2010 2014-10-22 [16:21]  964'434  bytes  
Results: 49 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-15