International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:9 total items.
Contributions  [ Source: WP 5D ]   Documents / Contributions
 
Number 
Title Source Date
[ 201 ]  
 
Liaison statement to Working Party 1B (copy to WPs 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     WP 5D   2015-02-10
[ 200 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D   2015-02-10
[ 137 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 5D   2014-02-25
[ 100 ]  
 
Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[WHITE-SPACE] - (Copy to Working Party 5A for information) - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     WP 5D   2013-10-18
[ 99 ]  
 
Liaison statement to ITU-R Working Party 1B - Studies towards review of the definitions of fixed service, fixed station and mobile station - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12)     WP 5D   2013-10-18
[ 93 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 5D   2013-07-17
[ 56 ]  
 
Liaison statement to Working Party 1B on further studies on cognitive radio systems (CRS)     WP 5D   2013-02-07
[ 55 ]  
 
Liaison statement to Working Party 6A on further studies on cognitive radio systems (CRS) (copy to Working Parties 1B, 5A and 5C)     WP 5D   2013-02-07
[ 44 ]  
 
Liaison statement to ITU-T Study Group 15 regarding G.WNB, narrow-band wireless home networking (copy to ITU-R, Working Parties 1B and 5A)     WP 5D   2012-07-23
Results:9 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-4-28