|
Number |
Date
|
Source
|
Title
|
| |
Number |
Posted |
Size
|
|
| |
|
[ 65 ]
|
2013-05-16 |
Chairman, SG 1
|
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)
|
|
[ 65 ] - English - Word 2010 |
2013-05-16 [11:40]
|
54'014 bytes |
|
| |
|
[ 64 ]
|
2013-05-14 |
ITU-T JCA-AHF
|
Liaison statement on nomination of JCA-AHF representatives
|
|
[ 64 ] - English - Word 2010 |
2013-05-15 [15:50]
|
190'360 bytes |
|
| |
|
[ 63 ]
|
2013-05-06 |
WP 4C
|
Liaison statement to Working Part 1B - WRC-15 Agenda item 9.1, Issue 9.1.6
|
|
[ 63 ] - English - Word 2010 |
2013-05-06 [16:13]
|
46'017 bytes |
|
| |
|
[ 62 ]
|
2013-05-03 |
Netherlands (Kingdom of the)
|
Proposal regarding the update of Report SM. 2153-3 - Technical and operating parameters and spectrum requirements for short-range devices
|
|
[ 62 ] - English - Word 2010 |
2013-05-03 [12:18]
|
994'141 bytes |
|
| |
|
[ 61 ]
|
2013-04-25 |
Israel (State of)
|
Update to Recommendation ITU-R SM.1370 - Design guidelines for developing automated spectrum management systems
|
|
[ 61 ] - English - Word 2010 |
2013-04-26 [15:21]
|
160'043 bytes |
|
| |
|
[ INF 3 ]
|
2013-04-22 |
BR Study Group Department
|
Information for participants - Meetings of Working Parties 1A, 1B, 1C and Study Group 1
|
|
[ INF 3 ] - English - Word 2010 |
2013-04-24 [13:13]
|
209'566 bytes |
|
| |
|
[ INF 2 ]
|
2013-04-18 |
Director, BDT
|
Development of the spectrum management training programme
|
|
[ INF 2 ] - English - Word 2010 |
2013-04-18 [14:49]
|
328'612 bytes |
|
| |
|
[ 58 ]
|
2013-03-06 |
World Meteorological Organization
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
|
[ 58 ] Corrigendum 1 - English - Word 2010 |
2013-04-18 [12:48]
|
64'080 bytes |
|
|
[ 58 ] - English - Word 2010 |
2013-03-07 [14:37]
|
90'162 bytes |
|
| |
|
[ 60 ]
|
2013-04-17 |
ITU-T FG-DR&NRR
|
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)
|
|
[ 60 ] - English - Word 2010 |
2013-04-17 [14:04]
|
577'842 bytes |
|
| |
|
[ 59 ]
|
2013-04-08 |
United States of America
|
Preliminary draft revision of Recommendation ITU-R SM.1370-1 - Design guidelines for developing automated spectrum management systems
|
|
[ 59 ] - English - Word 2010 |
2013-04-09 [16:25]
|
166'930 bytes |
|
Results: 11 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):