International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP1B Recently posted -  Search Meeting Documents
   
ITU-R WP1B Meeting Documents
  Max # of documents displayed/page:
Results: 34 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title
  Number  Posted Size  
 
[ 249 ]  2015-08-26 WP 5A   Reply liaison statement to Working Party 1B - Proposed draft new Question concerning spectrum management on Intelligent Transport Systems    
  [ 249 ]  - English -  Word 2010 2015-08-27 [13:43]  62'539  bytes  
 
[ 248 ]  2015-08-26 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]    
  [ 248 ]  - English -  Word 2010 2015-08-28 [10:42]  60'337  bytes  
 
[ 247 ]  2015-08-26 WP 5A   Liaison statement to Working Party 1B (copy to ITU-D Study Group 1 and ITU-R Working Party 5D for information) - Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] - Innovative regulatory tools to support enhanced shared use of the spectrum    
  [ 247 ]  - English -  Word 2010 2015-08-27 [16:10]  62'516  bytes  
 
[ 246 ]  2015-08-25 WP 5C   Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy for information to ETSI ATTM TM4, CEPT ECC PT SE19) - Development of draft revision of Recommendation ITU-R F.758-5 and a draft new Recommendation ITU-R F.[FS DEPLOY] - Recommendations on sharing or commpatibility studies between the fixed service and systems in other services    
  [ 246 ]  - English -  Word 2010 2015-08-27 [10:10]  62'508  bytes  
 
[ 245 ]  2015-08-03 WP 6A   Liaison statement to ITU-T SG 5 (Copied to ITU-R WP 3L, WP 1A, 1B, 5A, 5B, 5C, 5D, ITU-D SG 2 for information) - Human exposure to RF fields from broadcast transmitters - Comments to WHO monograph - radio frequency fields; environmental health criteria    
  [ 245 ]  - English -  Word 2010 2015-08-04 [15:53]  104'021  bytes  
 
[ 244 ]  2015-08-03 WP 6A   Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam    
  [ 244 ]  - English -  Word 2010 2015-08-04 [10:10]  151'945  bytes  
 
[ 243 ]  2015-07-20 WP 5B   Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam    
  [ 243 ]  - English -  Word 2010 2015-07-20 [15:58]  65'816  bytes  
 
[ 242 ]  2015-07-16 WP 5A   Liaison statement to ITU-D/ITU-R Joint Group for Resolution 9 on work items during the 2014-2017 study period (copy for information to ITU-R SG 1, SG 5, SG 6 and their relevant working parties on work items pertinent to WTDC Resolution 9)    
  [ 242 ]  - English -  Word 2010 2015-07-16 [14:54]  55'270  bytes  
 
[ 241 ]  2015-07-15 Iran (Islamic Republic of)   Modification to Recommendation ITU-R SM.1046-2    
  [ 241 ]  - English -  Word 2010 2015-07-15 [17:19]  57'834  bytes  
 
[ 240 ]  2015-07-08 ITU-T SG 15   Reply liaison statement to Working Party 1B on consented revised Recommendation ITU-T G.9959    
  [ 240 ]  - English -  Word 2010 2015-07-09 [10:14]  81'438  bytes  
 
[ 239 ]  2015-06-22 WP 1A   Liaison statement to Working Parties 1B, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam    
  [ 239 ]  - English -  Word 2010 2015-06-23 [18:32]  57'603  bytes  
 
[ 238 ]  2015-06-10 Chairman, WP 1B   Report on the meeting of Working Party 1B (Geneva, 3-10 June 2015)    
  [ 238 ]  - English -  Word 2010 2015-06-26 [09:49]  71'286  bytes Report on the meeting of Working Party 1B (Geneva, 3-10 June 2015)  
  [ 238 ] Annex 08 - English -  Word 2010 2015-06-22 [18:01]  53'562  bytes Terms of Reference of the WP 1B Correspondence Group on SRD classification  
  [ 238 ] Annex 07 - English -  Word 2010 2015-06-22 [17:55]  55'664  bytes Terms of Reference of the WP 1B Rapporteur Group on CRS spectrum management challenges  
  [ 238 ] Annex 09 - English -  Word 2010 2015-06-22 [17:37]  58'703  bytes Reply to the liaison statement from ITU-D Study Group 1, Question 8/1 - New Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands  
  [ 238 ] Annex 06 - English -  Word 2010 2015-06-22 [13:48]  8'963'478  bytes Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities  
  [ 238 ] Annex 04 - English -  Word 2010 2015-06-22 [09:18]  406'400  bytes Preliminary draft modification to Report ITU-R SM.2012-4 - Economic aspects of spectrum management  
  [ 238 ] Annex 01 - English -  Word 2010 2015-06-22 [08:27]  3'335'523  bytes Preliminary draft revision of Recommendation ITU-R SM.1046-2 - Definition of spectrum use and efficiency of a radio system  
  [ 238 ] Annex 02 - English -  Word 2010 2015-06-22 [08:15]  58'495  bytes Working document towards preliminary draft new Report/Recommendation ITU-R SM.[SRD-CATEGORIES] - Global harmonization of SRD categories  
  [ 238 ] Annex 05 - English -  Word 2010 2015-06-12 [15:24]  1'920'408  bytes Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] - Innovative regulatory tools to support enhanced shared use of the spectrum and the infrastructure of telecommunications network  
  [ 238 ] Annex 03 - English -  Word 2010 2015-06-12 [15:19]  60'273  bytes Working document towards a preliminary draft new Recommendation ITU-R SM.[G.WNB-FREQ] - Narrow-band wireless home networking transceivers Specification of spectrum related components  
 
[ 237 ]  2015-06-10 Director, BR   Final list of participants - Working Party 1B (Geneva, 3-10 June 2015)    
  [ 237 ] Revision 1 - English -  PDF (acrobat) 2015-06-15 [11:28]  408'896  bytes  
 
[ ADM 37 ]  2015-06-09 Vice-Chairman, WP 1B   Agenda for the third (final) Plenary session of the fifth 2012-2015 meeting of Working Party 1B - Wednesday, 10 June, at 10:40 hours (Room C, Tower building)    
  [ ADM 37 ]  - English -  Word 2010 2015-06-10 [08:50]  71'270  bytes  
 
[ ADM 36 ]  2015-06-08 Vice-Chairman, WP 1B   Agenda for the second Plenary session of the fifth 2012-2015 meeting of Working Party 1B - Monday, 8 June, at 15:40 hours - Room C2, Tower building    
  [ ADM 36 ]  - English -  Word 2010 2015-06-08 [13:40]  73'017  bytes  
 
[ ADM 32 ]  2015-06-02 Chairman, WP 1B   Provisional schedule for the June 2015 meetings of Working Parties 1A, 1B and 1C    
  [ ADM 32 ] Revision 1 - English -  Word 2010 2015-06-08 [08:28]  60'783  bytes  
Results: 34 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-08-28