International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP7D Recently posted -  Search Meeting Documents
   
ITU-R WP7D Meeting Documents
  Max # of documents displayed/page:
Results: 26 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title
  Number  Posted Size  
 
[ 180 ]  2015-08-26 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]    
  [ 180 ]  - English -  Word 2010 2015-08-28 [10:45]  60'337  bytes  
 
[ 179 ]  2015-08-26 WP 5A   Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732    
  [ 179 ]  - English -  Word 2010 2015-08-28 [10:36]  59'630  bytes  
 
[ 178 ]  2015-08-26 WP 5A   Reply liaison statement to Working Party 1A - Copy for information to Working Party 5C, Working Party 7C and Working Party 7D - The land mobile service in the frequency range 275-1 000 GHz    
  [ 178 ]  - English -  Word 2010 2015-08-27 [16:09]  59'782  bytes  
 
[ 177 ]  2015-08-25 WP 5C   Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy for information to ETSI ATTM TM4, CEPT ECC PT SE19) - Development of draft revision of Recommendation ITU-R F.758-5 and a draft new Recommendation ITU-R F.[FS DEPLOY] - Recommendations on sharing or commpatibility studies between the fixed service and systems in other services    
  [ 177 ]  - English -  Word 2010 2015-08-27 [10:14]  62'508  bytes  
 
[ 176 ]  2015-08-25 WP 5C   Reply liaison statement to Working Party 1A copy for information to Working Party 5A, Working Party 7C and Working Party 7D - The fixed service in the frequency range 275-1 000 GHz    
  [ 176 ]  - English -  Word 2010 2015-08-27 [15:00]  59'873  bytes  
 
[ 175 ]  2015-08-03 WP 6A   Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam    
  [ 175 ]  - English -  Word 2010 2015-08-04 [10:12]  151'945  bytes  
 
[ 174 ]  2015-07-20 WP 5B   Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam    
  [ 174 ]  - English -  Word 2010 2015-07-20 [16:00]  65'816  bytes  
 
[ 173 ]  2015-07-16 WP 5C   Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10    
  [ 173 ]  - English -  Word 2010 2015-07-16 [14:33]  60'608  bytes  
 
[ 172 ]  2015-07-14 WP 4A   Liaison statement to Working Party 7D - WRC-15 agenda item 1.6    
  [ 172 ]  - English -  Word 2010 2015-07-14 [15:28]  53'210  bytes  
 
[ 171 ]  2015-07-14 ITU-T SG9   Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)    
  [ 171 ]  - English -  Word 2010 2015-07-14 [13:15]  54'143  bytes  
 
[ 170 ]  2015-07-01 WP 4A   Liaison statement to Working Party 5C (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.8    
  [ 170 ]  - English -  Word 2010 2015-07-02 [11:36]  60'103  bytes  
 
[ 168 ]  2015-06-22 WP 1A   Liaison statement to Working Parties 1B, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam    
  [ 168 ]  - English -  Word 2010 2015-06-23 [18:34]  57'603  bytes  
 
[ 169 ]  2015-06-23 WP 4C   Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10    
  [ 169 ]  - English -  Word 2010 2015-06-23 [15:55]  52'534  bytes  
 
[ 167 ]  2015-06-22 WP 1A   Liaison statement to Working Parties 3K and 3M (copy for information to WPs 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz    
  [ 167 ]  - English -  Word 2010 2015-06-23 [14:33]  61'945  bytes  
 
[ 166 ]  2015-06-22 WP 1A   Liaison statement to the IEEE on the draft new Report ITU-R SM.[THZ_TREND] - Technology trends of active services in the band above 275 GHz    
  [ 166 ]  - English -  Word 2010 2015-06-23 [14:25]  55'049  bytes  
 
[ 165 ]  2015-06-22 WP 1A   Liaison statement to Working Parties 5A, 5C, 7C and 7D - Technology trends of active services in the band above 275 GHz    
  [ 165 ]  - English -  Word 2010 2015-06-23 [14:27]  63'515  bytes  
 
[ 164 ]  2015-06-22 WP 1C   Reply liaison statement to Working Party 7D - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]    
  [ 164 ]  - English -  Word 2010 2015-06-23 [08:33]  57'597  bytes  
 
[ 163 ]  2015-06-16 WP 1A   Liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz    
  [ 163 ]  - English -  Word 2010 2015-06-16 [08:32]  62'437  bytes  
 
[ 162 ]  2015-06-12 WP 1A   Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations    
  [ 162 ]  - English -  Word 2010 2015-06-12 [18:10]  64'283  bytes  
 
[ 161 ]  2015-06-12 WP 1A   Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 5D, 6A and 7D) - Developments concerning co-existence issues    
  [ 161 ]  - English -  Word 2010 2015-06-12 [17:48]  64'553  bytes  
 
[ 160 ]  2015-06-12 WP 1A   Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors    
  [ 160 ]  - English -  Word 2010 2015-06-12 [17:31]  65'858  bytes  
 
[ 159 ]  2015-06-11 WP 1B   Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7B and 7D - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities    
  [ 159 ]  - English -  Word 2010 2015-06-11 [08:44]  60'485  bytes  
 
[ 158 ]  2015-05-25 Chairman, WP 7D   Report of the meeting of Working Party 7D (Geneva, 20-25 May 2015)    
  [ 158 ]  - English -  Word 2010 2015-08-19 [14:22]  91'615  bytes Report on the May 2015 meeting of Working Party 7D - (Geneva, 20-25 May 2015)  
  [ 158 ] Annex 03 - English -  Word 2010 2015-06-05 [16:53]  53'203  bytes Working document towards a preliminary draft new Report ITU-R RA.[SATMON] - Monitoring of satellite generated interference in bands allocated to the radio astronomy service on a primary basis  
  [ 158 ] Annex 02 - English -  Word 2010 2015-06-05 [16:50]  86'490  bytes Preliminary draft new Report ITU-R RA.[SPACE-RA-THRESHOLD LEVELS]  
Results: 26 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-08-28