International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP6B Recently posted -  Search Meeting Documents
   
ITU-R WP6B Meeting Documents
  Max # of documents displayed/page:
Results: 70 total items.
Result Page:  1 - 2 - 3  - Next
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 128 ]  2013-04-25 Chairman, WP 6B   Report on the meeting of Working Party 6B (Geneva, 22-25 April 2013)     N/A  
  [ 128 ] Annex 20 - English -  Word 2010 2013-05-20 [08:36]  50'529  bytes List of output (temp) documents (Documents 6B/TEMP/42 - 6B/TEMP/67)  
  [ 128 ] Annex 19 - English -  Word 2010 2013-05-20 [08:15]  55'452  bytes List of input documents (Documents 6B/78 - 6B/126)  
  [ 128 ] Annex 17 - English -  Word 2010 2013-05-17 [17:05]  72'090  bytes Liaison statement to IEC TC 100 (copy to ITU-T Study Group 16 for information) - Basic desirable functionalities of consumer receivers for worldwide broadcasting roaming  
  [ 128 ] Annex 18 - English -  Word 2010 2013-05-17 [17:00]  43'058  bytes Liaison statement to Working Party 6C on preliminary draft new ITU-R Question - Methods for signalling loudness compliance  
  [ 128 ] Annex 15 - English -  Word 2010 2013-05-17 [16:57]  44'189  bytes Liaison statement to ISO/IEC JTC1/SC29/WG11 - MPEG Media Transport  
  [ 128 ] Annex 16 - English -  Word 2010 2013-05-17 [16:50]  70'049  bytes Liaison statement to ITU-T Study Group 16 - HEVC standardization  
  [ 128 ] Annex 08 - English -  Word 2010 2013-05-17 [16:39]  71'908  bytes Liaison statement to ITU-T Study Group 16 - Recent progress of Recommendations and Report on integrated broadcast-broadband systems  
  [ 128 ] Annex 14 - English -  Word 2010 2013-05-17 [16:39]  43'369  bytes Liaison statement to ISO/IEC JTC1/SC29/WG11 - on HEVC coding of interlaced video  
  [ 128 ] Annex 12 - English -  Word 2010 2013-05-17 [16:37]  43'092  bytes Liaison statement to ITU-T FG-AVA on subtitling  
  [ 128 ] Annex 13 - English -  Word 2010 2013-05-17 [16:36]  57'457  bytes Reply liaison statement from ITU-T FG SmartCable  
  [ 128 ] Annex 10 - English -  Word 2010 2013-05-17 [16:17]  45'826  bytes Liaison statement to ITU-T FG AVA - Recent progress of Recommendations and Report on the work on integrated broadcast-broadband systems  
  [ 128 ] Annex 11 - English -  Word 2010 2013-05-17 [16:11]  45'428  bytes Liaison statement to ITU-T FG-AVA on signing services  
  [ 128 ] Annex 09 - English -  Word 2010 2013-05-17 [16:06]  45'500  bytes Liaison statement to ITU-T SG 9 - recent progress of Recommendations and Report on Integrated Broadcast-Broadband systems  
  [ 128 ] Annex 06 - English -  Word 2010 2013-05-17 [16:04]  65'577  bytes Establishment of a Rapporteur Group - to consider future revision of Recommendation ITU-R BR.1352 and requirements for audio file formats for programme exchange  
  [ 128 ] Annex 07 - English -  Word 2010 2013-05-17 [15:38]  49'572  bytes Revision of the mandate of the rapporteur group on Integrated Broadcast-Broadband (IBB) systems  
  [ 128 ] Annex 04 - English -  Word 2010 2013-05-17 [15:32]  44'557'173  bytes Preliminary draft revision of Report ITU-R BT.2049-5 - Broadcasting of multimedia and data applications for mobile reception  
  [ 128 ] Annex 05 - English -  Word 2010 2013-05-17 [15:02]  234'400  bytes Working Document towards a Preliminary Draft New Report on Production, Emission, and Exchange of Closed Caption for all worldwide language character sets (latin and non-Latin)  
  [ 128 ] Annex 03 - English -  Word 2010 2013-05-17 [14:56]  77'663  bytes Preliminary draft revision of Recommendation ITU-R BT.1833-2 - Broadcasting of multimedia and data applications for mobile reception by handheld receivers  
  [ 128 ] Annex 01 - English -  Word 2010 2013-05-17 [14:25]  58'242  bytes Preliminary draft new ITU-R Question - Methods for signalling loudness compliance  
  [ 128 ] Annex 02 - English -  Word 2010 2013-05-10 [17:12]  216'346  bytes Preliminary draft new Recommendation BT.[IBB-TECH] - Technical requirements for Integrated Broadcast-Broadband (IBB) systems  
 
[ 129 ]  2013-05-14 ITU-T JCA-AHF   Liaison statement on nomination of JCA-AHF representatives     N/A  
  [ 129 ]  - English -  Word 2010 2013-05-15 [15:51]  190'360  bytes  
 
[ 127 ]  2013-04-25 Director, BR   Final List of Participants - Working Party 6B (Geneva, 22-25 April 2013)     N/A  
  [ 127 ]  - English -  PDF (acrobat) 2013-04-25 [11:28]  339'707  bytes  
 
[ TD 67 ]  2013-04-25 WP 6B   Reply from Study Group 6 to the Note by the Secretary-General - ICT sectorial consultation on the role of ICTs to promote the inclusion of persons with disabilities     N/A  
  [ TD 67 ]  - English -  Word 2010 2013-04-25 [09:19]  65'736  bytes  
 
[ ADM 19 ]  2013-04-24 Chairman, WP 6B   Draft agenda for the fourth Plenary meeting of Working Party 6B - Thursday, 25 April 2013 at 09:00 hours & 10:45 hours (Room A, ITU Tower)     N/A  
  [ ADM 19 ]  - English -  Word 2010 2013-04-24 [16:54]  59'125  bytes  
 
[ TD 45 ]  2013-04-23 WP 6B (SWG 6B--2)   Draft liaison statement to ITU-T FG AVA - Recent progress of Recommendations and Report on the work on Integrated Broadcast-Broadband systems     N/A  
  [ TD 45 ] Revision 1 - English -  Word 2010 2013-04-24 [16:27]  46'319  bytes  
Results: 70 total items.
Result Page:  1 - 2 - 3  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-05-20