Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP3L Nuevo -  Busque los documentos de la reunión
   
UIT-R WP3L Documentos de la reunión
  Número máximo de documentos/página:
Resultados: 12 documentos
Número  Fecha Origen Título
  Número  Puesta a disposición Tamaño  
 
[ 102 ]  2014-11-07 WP 5C   Liaison statement to Working Party 3L - Channel characteristics of HF propagation paths through the auroral region    
  [ 102 ]  - English -  Word 2010 2014-11-10 [13:34]  36'643  octetos  
 
[ 103 ]  2014-11-10 WP 5B   Liaison statement to Working Parties 3L, 3M, 4C and 7B - Proposed new study question spectrum access for space planes    
  [ 103 ]  - English -  Word 2010 2014-11-10 [17:13]  36'916  octetos  
 
[ 101 ]  2014-11-04 WP 5A   Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4    
  [ 101 ]  - English -  Word 2010 2014-11-04 [10:56]  36'768  octetos  
 
[ 100 ]  2014-09-30 ITU-T SG 9   Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)    
  [ 100 ]  - English -  Word 2010 2014-09-30 [17:11]  7'500'211  octetos  
 
[ 99 ]  2014-09-10 Chairman, WP 3L   Report on the meeting of Working Party 3L (Geneva, 4-10 September 2014)    
  [ 99 ]  - English -  Word 2010 2014-09-26 [11:45]  55'585  octetos Report on the meeting of Working Party 3L - Ionospheric Propagation and Radio Noise  
  [ 99 ] Annex 02 - English -  Word 2010 2014-09-18 [13:08]  40'865  octetos Preliminary draft revision of Recommendation ITU-R P.1321  
  [ 99 ] Annex 01 - English -  Word 2010 2014-09-18 [11:58]  40'620  octetos Preliminary draft revision to Recommendation ITU-R P.533-12  
 
[ 98 ]  2014-10-09 Director, BR   Final list of participants - Working Party 3L (Geneva, 4-10 September 2014)    
  [ 98 ]  - English -  PDF (acrobat) 2014-09-10 [14:19]  568'991  octetos  
 
[ ADM 10 ]  2014-09-09 WP 3L   Draft agenda for the Second Plenary meeting of Working Party 3L    
  [ ADM 10 ]  - English -  Word 2010 2014-09-09 [18:23]  36'082  octetos  
 
[ ADM 9 ]  2014-09-03 Chairman, WP 3L   Organization of work and allocation of documents    
  [ ADM 9 ]  - English -  Word 2010 2014-09-03 [17:14]  50'555  octetos  
 
[ ADM 8 ]  2014-09-03 Chairman, WP 3L   Draft agenda for the meeting of Working Party 3L (Geneva, 4 - 10 September 2014) Opening at 09:30 hours on 4 September 2014 (Room Popov 1, Tower Building)    
  [ ADM 8 ]  - English -  Word 2010 2014-09-03 [16:29]  37'163  octetos  
 
[ 97 ]  2014-09-01 BR Study Groups Department   List of documents issued (Documents 3L/63 - 3L/97)    
  [ 97 ]  - English -  Word 2010 2014-09-01 [15:40]  39'862  octetos  
Resultados: 12 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML Si  
Formatos doc pdf zip  + Otros formatos
Idiomas (máximo 2) E F S A C R  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2014-11-10