International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG04 Recently posted -  Search Meeting Documents
   
ITU-R SG04 Meeting Documents
  Max # of documents displayed/page:
Results: 20 total items.
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 79 ]  2014-09-10 Chairman, JTG 4-5-6-7   Executive Report to Study Groups 4 and 7 on the work of Joint Task Group 4-5-6-7     N/A  
  [ 79 ]  - English -  Word 2010 2014-09-10 [17:09]  45'085  bytes  
 
[ 78 ]  2014-08-20 JTG 4-5-6-7   Draft new Report ITU-R [FSS-IMT C-BAND DOWNLINK] - Sharing studies between International Mobile Telecommunication-Advanced systems and geostationary satellite networks in the fixed-satellite service in the 3 400-4 200 MHz and 4 500-4 800 MHz frequency bands in the WRC study cycle leading to WRC-15     N/A  
  [ 78 ] Revision 1 - English -  Word 2010 2014-09-02 [14:57]  15'395'623  bytes  
 
[ 77 ]  2014-08-19 JTG 4-5-6-7   Draft new Report ITU-R [FSS-IMT C-BAND UPLINK] - Sharing and compatibility between International Mobile Telecommunication systems and fixed-satellite service networks in 5 850-6 425 MHz frequency range     N/A  
  [ 77 ]  - English -  Word 2010 2014-09-03 [08:32]  9'230'344  bytes  
 
[ 76 ]  2014-07-22 Chairman, SG 4   Summary record of the Study Group 4 meeting on 11 July 2014     N/A  
  [ 76 ]  - English -  Word 2010 2014-09-16 [16:59]  112'491  bytes  
 
[ 67 ]  2014-07-08 WP 4B   Draft new Recommendation ITU-R S.[DIGCID] - Carrier identification system for digital-modulation transmissions of fixed-satellite service occasional use carrier earth station transmissions using geostationary-satellite networks in the 4/6 GHz and 11-12/13/14 GHz FSS bands     N/A  
  [ 67 ] Revision 1 - English -  Word 2010 2014-07-21 [11:18]  348'399  bytes  
 
[ 64 ]  2014-07-08 WP 4C   Draft revision of Recommendation ITU-R M.1478-2 - Protection criteria for Cospas-Sarsat search and rescue instruments in the band 406-406.1 MHz     N/A  
  [ 64 ] Revision 1 - English -  Word 2010 2014-07-21 [09:59]  474'018  bytes  
  [ 64 ]  - English -  Word 2010 2014-07-08 [14:46]  399'544  bytes  
 
[ 75 ]  2014-07-11 Director, BR   Final list of participants - Study Group 4 (Geneva, 11 July 2014)     N/A  
  [ 75 ]  - English -  PDF (acrobat) 2014-07-11 [16:27]  331'356  bytes  
 
[ ADM 4 ]  2014-07-11 Chairman, SG 4   Agenda for the meeting of Radiocommunication Study Group 4, Geneva, 11 July 2014, at 9:30 hours - (Room Popov, ITU Tower)     N/A  
  [ ADM 4 ]  - English -  Word 2010 2014-07-11 [08:38]  52'491  bytes  
 
[ 73 ]  2014-07-10 Chairman, WP 4A   Executive Report of the fifth and sixth meetings of Working Party 4A (Geneva, 5-13 February and 2-10 July 2014)     N/A  
  [ 73 ]  - English -  Word 2010 2014-07-11 [12:57]  84'356  bytes  
 
[ 74 ]  2014-07-10 BR Study Group Department   List of documents issued (Document 4/52 - 4/74)     N/A  
  [ 74 ]  - English -  Word 2010 2014-07-10 [17:44]  51'564  bytes  
 
[ 72 ]  2014-07-10 WP 4A   Proposed corrigendum to draft new Recommendation ITU-R BO.[ALT_BSS_ANT_DIAG] -Alternative BSS earth station antenna radiation pattern for 12 GHz BSS bands with effective apertures in the range 55-75 cm     N/A  
  [ 72 ]  - English -  Word 2010 2014-07-10 [13:58]  105'146  bytes  
 
[ 71 ]  2014-07-10 Chairman, WP 4C   Executive Report of the thirteenth and fourteenth meetings of Working Party 4C - (Geneva, 13 - 19 February 2014 and 25 June - 1 July 2014)     N/A  
  [ 71 ]  - English -  Word 2010 2014-07-10 [10:55]  62'307  bytes  
 
[ 68 ]  2014-07-09 WP 4B   Draft revision of Report ITU-R S.2173 - Multi-carrier based transmission techniques for satellite systems     46-3/4  
  [ 68 ]  - English -  Word 2010 2014-07-09 [11:14]  1'174'577  bytes  
 
[ 70 ]  2014-07-09 Chairman, WP 4B   Executive Report of the thirty-sixth and thirty-seventh meetings of Working Party 4B (Geneva, 10-14 February 2014 and 30 June - 4 July 2014)     N/A  
  [ 70 ]  - English -  Word 2010 2014-07-09 [08:27]  52'425  bytes  
 
[ 69 ]  2014-07-09 WP 4B   Suppression of some ITU-R Recommendations related to FDM/FM carriers     N/A  
  [ 69 ]  - English -  Word 2010 2014-07-09 [08:27]  45'066  bytes  
 
[ 66 ]  2014-07-08 WP 4B   Draft new Report ITU-R S.[MULTI_POL] - Multi-dimensional signal mapping technique for satellite communications     N/A  
  [ 66 ]  - English -  Word 2010 2014-07-08 [17:48]  1'118'638  bytes  
 
[ 65 ]  2014-07-08 WP 4B   Draft new Question ITU-R [INTEG_MSS]/4 - System architecture and performance aspects on integrated MSS systems     N/A  
  [ 65 ]  - English -  Word 2010 2014-07-08 [17:17]  45'156  bytes  
 
[ 63 ]  2014-07-08 WP 4C   Draft new Report ITU-R M.[RNSS_MULTI_EESS] - Consideration of aggregate radio frequency interference (RFI) event potentials from multiple EESS systems on RNSS receivers operating in the 1 215-1 300 MHz frequency band     N/A  
  [ 63 ]  - English -  Word 2010 2014-07-08 [12:00]  1'654'893  bytes  
 
[ 62 ]  2014-07-07 WP 4B   Liaison statement to Working Party 5D (copy for information to Working Party 4C and Study Group 4) - Work progress on development of Handbook on Global Trends in IMT - ITU-R M.[IMT/HANDBOOK]     N/A  
  [ 62 ]  - English -  Word 2010 2014-07-07 [11:56]  192'841  bytes  
Results: 20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-09-16